| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$7,875.00 |
$5,000.00 |
$16,160.92 |
$27,500.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 8,465.96 | CY |
$10.00 |
$6.82 |
$8.85 |
$9.25 |
$7.40 |
| 30 | 202(B)2300 |
MUCK EXCAVATION | 1,000 | CY |
$40.00 |
$12.60 |
$15.00 |
$28.72 |
$13.20 |
| 40 | 202(D)2500 |
UNCLASSIFIED BORROW | 33,323.48 | CY |
$10.00 |
$7.87 |
$9.50 |
$9.20 |
$8.90 |
| 50 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$30,000.00 |
$7,875.00 |
$10,500.00 |
$17,970.21 |
$9,750.00 |
| 60 | 221(B)2300 |
TEMPORARY SILT FENCE | 1,865 | LF |
$5.00 |
$3.65 |
$4.55 |
$4.21 |
$4.00 |
| 70 | 221(E)2600 |
TEMPORARY SILT DIKE | 276 | LF |
$14.00 |
$15.06 |
$15.75 |
$17.35 |
$16.50 |
| 80 | 221(F)2700 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 17 | CY |
$165.00 |
$173.25 |
$200.00 |
$141.46 |
$151.80 |
| 90 | 221(G)2800 |
TEMPORARY FIBER LOG | 2,000 | LF |
$8.00 |
$8.51 |
$9.00 |
$9.81 |
$9.00 |
| 100 | 229 6100 |
DITCH LINER PROTECTION | 1,960.32 | LF |
$5.00 |
$3.81 |
$4.00 |
$4.38 |
$5.40 |
| 110 | 230(A)7200 |
SOLID SLAB SODDING | 27,052.49 | SY |
$3.00 |
$3.81 |
$3.95 |
$4.38 |
$4.18 |
| 120 | 233(A)0200 |
VEGETATIVE MULCHING | 5.59 | AC |
$1,400.00 |
$1,779.75 |
$1,800.00 |
$2,049.26 |
$1,795.00 |
| 130 | 303(A)1210 |
AGGREGATE BASE TYPE A, PLANT MIXED | 2,236.32 | CY |
$50.00 |
$91.83 |
$91.50 |
$103.54 |
$86.40 |
| 140 | 307(K)4200 |
STABILIZED SUBGRADE | 18,956.76 | SY |
$8.00 |
$9.45 |
$11.55 |
$7.02 |
$11.55 |
| 150 | 325 0100 |
SEPARATOR FABRIC | 9,913.79 | SY |
$3.00 |
$3.15 |
$3.30 |
$1.57 |
$3.80 |
| 160 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 510.69 | TON |
$75.00 |
$36.75 |
$57.00 |
$60.73 |
$42.00 |
| 170 | 407(B)7300 |
TACK COAT | 1,990.29 | GAL |
$5.00 |
$6.26 |
$6.30 |
$5.41 |
$6.80 |
| 180 | 408 8100 |
PRIME COAT | 9,113.31 | GAL |
$5.00 |
$6.56 |
$6.55 |
$5.72 |
$6.95 |
| 190 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 4,489.78 | TON |
$110.00 |
$120.15 |
$120.00 |
$113.28 |
$126.91 |
| 200 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,933.61 | TON |
$120.00 |
$142.20 |
$142.00 |
$118.04 |
$146.94 |
| 210 | 412 3100 |
COLD MILLING PAVEMENT | 1,777.67 | SY |
$3.00 |
$7.64 |
$7.80 |
$10.02 |
$11.50 |
| 220 | 509(A)0200 |
CLASS AA CONCRETE | 136.02 | CY |
$700.00 |
$631.21 |
$685.00 |
$753.48 |
$825.58 |
| 230 | 509(D)0500 |
CLASS C CONCRETE | 254.87 | CY |
$500.00 |
$396.69 |
$575.00 |
$547.91 |
$452.24 |
| 240 | 511(A)2200 |
REINFORCING STEEL | 14,430.5 | LB |
$1.50 |
$1.46 |
$1.20 |
$1.21 |
$1.45 |
| 250 | 514(H)5900 |
SHEET PILING, FURNISHED | 128 | SY |
$130.00 |
$10.50 |
$225.00 |
$253.10 |
$160.15 |
| 260 | 514(I)6000 |
SHEET PILING, DRIVEN | 128 | SY |
$45.00 |
$10.50 |
$100.00 |
$122.26 |
$86.71 |
| 270 | 601(B)1200 |
TYPE I PLAIN RIPRAP WITH FILTER BLANKET | 188 | TON |
$80.00 |
$93.45 |
$66.00 |
$83.64 |
$96.90 |
| 280 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 96 | LF |
$35.00 |
$38.85 |
$40.00 |
$74.85 |
$42.00 |
| 290 | 613(B)5516 |
24" CORR. GALV. STEEL PIPE | 162 | LF |
$45.00 |
$51.45 |
$50.00 |
$95.69 |
$55.00 |
| 300 | 613(B)5540 |
54" CORR. GALV. STEEL PIPE | 140 | LF |
$100.00 |
$129.15 |
$140.00 |
$184.65 |
$138.00 |
| 310 | 613(B)5552 |
72" CORR. GALV. STEEL PIPE | 198 | LF |
$160.00 |
$172.20 |
$190.00 |
$210.01 |
$184.00 |
| 320 | 613(H)6200 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 500 | LF |
$25.00 |
$36.75 |
$20.00 |
$17.96 |
$38.00 |
| 330 | 613(I)6305 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 100 | LF |
$25.00 |
$36.75 |
$20.00 |
$20.66 |
$38.00 |
| 340 | 613(M)6960 |
TYPE A4 CULVERT END TREATMENT | 4 | EA |
$2,500.00 |
$2,730.00 |
$2,750.00 |
$1,832.02 |
$2,750.00 |
| 350 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$5,775.00 |
$3,500.00 |
$4,793.92 |
$23,000.00 |
| 360 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 13,709.41 | SY |
$8.00 |
$3.22 |
$3.25 |
$5.53 |
$11.04 |
| 370 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 553 | LF |
$6.00 |
$6.82 |
$5.00 |
$6.05 |
$6.00 |
| 380 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 780 | LF |
$30.00 |
$22.05 |
$30.00 |
$34.46 |
$31.50 |
| 390 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$3,000.00 |
$3,465.00 |
$4,400.00 |
$4,836.01 |
$4,350.00 |
| 400 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$3,000.00 |
$3,045.00 |
$4,300.00 |
$4,715.11 |
$4,250.00 |
| 410 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,344 | LF |
$7.00 |
$9.76 |
$8.50 |
$8.70 |
$18.53 |
| 420 | 624(C)3410 |
FENCE-STYLE SWF (6 BARBED WIRE) | 3,831 | LF |
$8.00 |
$10.50 |
$9.00 |
$9.07 |
$19.83 |
| 430 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 205 | CY |
$35.00 |
$52.50 |
$25.00 |
$16.58 |
$32.00 |
| 440 | 501(G)1800 |
CLSM BACKFILL | 208.1 | CY |
$300.00 |
$334.48 |
$240.00 |
$291.12 |
$208.67 |
| 450 | 503(A)4240 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 548.4 | LF |
$300.00 |
$431.76 |
$345.00 |
$241.00 |
$375.54 |
| 460 | 504(A)5200 |
APPROACH SLAB | 281.2 | SY |
$300.00 |
$267.92 |
$320.00 |
$300.64 |
$318.18 |
| 470 | 504(B)5300 |
SAW-CUT GROOVING | 760.5 | SY |
$5.00 |
$7.14 |
$6.40 |
$7.01 |
$6.95 |
| 480 | 504(D)5420 |
CONCRETE RAIL (TR4) | 342.2 | LF |
$125.00 |
$112.66 |
$110.00 |
$116.05 |
$121.38 |
| 490 | 506(A)7200 |
STRUCTURAL STEEL | 680 | LB |
$10.00 |
$3.29 |
$3.50 |
$3.06 |
$6.00 |
| 500 | 507(A)8200 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 5 | EA |
$4,000.00 |
$2,291.63 |
$2,200.00 |
$2,409.50 |
$3,472.00 |
| 510 | 507(B)8300 |
STAINLESS STEEL EXP. BEARING ASSEMBLY | 5 | EA |
$4,000.00 |
$2,291.63 |
$2,200.00 |
$2,409.50 |
$3,472.00 |
| 520 | 509(A)0210 |
CLASS AA CONCRETE | 128.2 | CY |
$750.00 |
$875.73 |
$700.00 |
$929.71 |
$852.87 |
| 530 | 509(B)0320 |
CLASS A CONCRETE | 99.3 | CY |
$800.00 |
$875.73 |
$700.00 |
$651.13 |
$892.00 |
| 540 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 55,510 | LB |
$2.00 |
$1.37 |
$1.35 |
$1.46 |
$1.62 |
| 550 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 238 | LF |
$40.00 |
$38.72 |
$35.00 |
$41.43 |
$41.02 |
| 560 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 992 | LF |
$50.00 |
$47.48 |
$40.00 |
$51.64 |
$47.51 |
| 570 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 238 | LF |
$25.00 |
$12.60 |
$20.00 |
$23.88 |
$20.00 |
| 580 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 992 | LF |
$25.00 |
$12.60 |
$20.00 |
$23.17 |
$18.00 |
| 590 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 600 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 536 | SY |
$8.00 |
$5.77 |
$5.50 |
$6.65 |
$7.50 |
| 610 | 518(B)0300 |
SEALED EXPANSION JOINTS | 41.8 | LF |
$350.00 |
$286.04 |
$325.00 |
$332.25 |
$336.99 |
| 620 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 2,510 | TON |
$70.00 |
$61.47 |
$66.00 |
$64.14 |
$66.90 |
| 630 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 595 | TON |
$50.00 |
$43.30 |
$48.00 |
$47.91 |
$52.90 |
| 640 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$35.00 |
$43.78 |
$35.00 |
$28.20 |
$35.00 |
| 650 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$35.00 |
$43.78 |
$35.00 |
$23.43 |
$30.00 |
| 660 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$50,000.00 |
$22,134.00 |
$30,000.00 |
$21,172.84 |
$65,000.00 |
| 670 | 853 5115 |
DELINEATORS(TYPE 2, CODE 1) | 32 | EA |
$20.00 |
$17.16 |
$37.00 |
$42.32 |
$38.00 |
| 680 | 857(A)9200 |
CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) | 5,327 | LF |
$1.00 |
$0.5600 |
$0.5400 |
$0.6000 |
$0.5400 |
| 690 | 857(E)9620 |
(PL)CONST.ZONE PAV.MKRS(FLEX TAB)TYP.2-1 | 2,000 | EA |
$1.00 |
$1.05 |
$1.50 |
$0.9100 |
$0.8100 |
| 700 | 858(A)0224 |
PAVE.MARKERS CLASS A TYPE 2-C | 1,250 | EA |
$7.00 |
$5.25 |
$6.50 |
$7.25 |
$6.55 |
| 710 | 858(A)0228 |
PAVE.MARKERS CLASS A TYPE 2-D | 1,250 | EA |
$5.00 |
$5.25 |
$6.50 |
$7.25 |
$6.55 |
| 720 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 120 | SD |
$16.00 |
$29.40 |
$31.00 |
$12.09 |
$10.90 |
| 730 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 3,115 | LF |
$25.00 |
$15.96 |
$20.00 |
$25.79 |
$22.20 |
| 740 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,440 | SD |
$0.5000 |
$0.3100 |
$0.2700 |
$0.3000 |
$0.2800 |
| 750 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,760 | SD |
$1.00 |
$0.0200 |
$0.2700 |
$0.3000 |
$0.2700 |
| 760 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 240 | SD |
$2.00 |
$15.75 |
$3.30 |
$3.63 |
$3.27 |
| 770 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 600 | SD |
$1.00 |
$0.6800 |
$2.20 |
$2.42 |
$2.20 |
| 780 | 880(C)6420 |
WING BARRICADES | 720 | SD |
$1.00 |
$0.0200 |
$0.1100 |
$0.1200 |
$0.1200 |
| 790 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 960 | SD |
$0.5000 |
$0.6300 |
$2.20 |
$2.42 |
$2.18 |
| 800 | 880(F)6700 |
DRUMS | 10,800 | SD |
$0.5000 |
$0.0200 |
$0.1600 |
$0.1800 |
$0.1700 |
| 810 | 880(I)7000 |
FLAGGER | 60 | SD |
$200.00 |
$52.50 |
$200.00 |
$265.34 |
$185.00 |
| 820 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 388 | SD |
$20.00 |
$10.50 |
$13.00 |
$14.51 |
$13.10 |
| 830 | 413(B)4310 |
RUMBLE STRIP-METHOD HMA-CYC | 3,958 | LF |
$1.50 |
$0.9400 |
$3.10 |
$5.31 |
$5.75 |
| 840 | 855(A)7200 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 7,268 | LF |
$1.00 |
$1.73 |
$1.65 |
$1.81 |
$1.64 |
| 850 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$45,000.00 |
$29,925.00 |
$25,000.00 |
$21,762.03 |
$25,800.00 |
| 860 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$8,000.00 |
$5,250.00 |
$4,000.00 |
$189,813.24 |
$3,500.00 |
| 870 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$215,000.00 |
$192,850.33 |
$175,000.00 |
$225,000.00 |
$197,000.00 |