| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$9,200.00 |
$10,000.00 |
$15,781.38 |
$21,500.00 |
$15,175.19 |
$33,250.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 3,309 | CY |
$12.00 |
$8.75 |
$15.00 |
$11.24 |
$12.25 |
$10.31 |
$17.80 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 1,529 | CY |
$12.00 |
$11.25 |
$7.00 |
$14.92 |
$13.80 |
$11.20 |
$39.40 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$9,450.00 |
$11,000.00 |
$7,487.66 |
$12,500.00 |
$10,108.06 |
$33,365.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 2,230 | LF |
$4.00 |
$3.85 |
$3.80 |
$4.13 |
$4.90 |
$3.65 |
$3.70 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 56 | LF |
$22.00 |
$22.00 |
$21.85 |
$23.57 |
$24.85 |
$20.84 |
$21.20 |
| 70 | 221(F)2720 |
TEMPORARY ROCK FILTER DAM TYPE 3 | 53 | CY |
$175.00 |
$191.00 |
$200.00 |
$176.43 |
$128.00 |
$122.14 |
$266.50 |
| 80 | 230(A)7200 |
SOLID SLAB SODDING | 11,016 | SY |
$4.50 |
$4.68 |
$4.82 |
$5.05 |
$5.03 |
$4.46 |
$4.55 |
| 90 | 233(A)0200 |
VEGETATIVE MULCHING | 4.32 | AC |
$1,750.00 |
$1,000.00 |
$2,625.00 |
$2,831.49 |
$2,485.00 |
$2,504.25 |
$2,544.00 |
| 100 | 303(A)1200 |
AGGREGATE BASE TYPE A | 875 | CY |
$100.00 |
$78.00 |
$84.00 |
$78.84 |
$92.44 |
$71.46 |
$102.50 |
| 110 | 307(K)4200 |
STABILIZED SUBGRADE | 4,178 | SY |
$10.00 |
$14.50 |
$10.00 |
$7.74 |
$12.40 |
$9.45 |
$8.60 |
| 120 | 325 0100 |
SEPARATOR FABRIC | 3,958 | SY |
$3.50 |
$3.50 |
$3.00 |
$2.01 |
$3.15 |
$1.69 |
$2.50 |
| 130 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 100 | TON |
$50.00 |
$26.53 |
$42.00 |
$55.54 |
$46.00 |
$40.57 |
$89.00 |
| 140 | 408 8100 |
PRIME COAT | 2,744 | GAL |
$6.50 |
$8.00 |
$8.00 |
$5.62 |
$8.25 |
$5.25 |
$7.05 |
| 150 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,441 | TON |
$135.00 |
$125.00 |
$124.00 |
$113.32 |
$126.56 |
$128.10 |
$116.00 |
| 160 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 471 | TON |
$145.00 |
$144.00 |
$142.00 |
$144.59 |
$141.90 |
$158.55 |
$140.00 |
| 170 | 509(D)0500 |
CLASS C CONCRETE | 10 | CY |
$450.00 |
$325.00 |
$350.00 |
$651.86 |
$300.00 |
$587.53 |
$1,155.00 |
| 180 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$8,600.00 |
$5,500.00 |
$8,049.72 |
$7,000.00 |
$6,825.00 |
$18,335.00 |
| 190 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 2,377 | SY |
$8.50 |
$5.29 |
$10.00 |
$7.53 |
$12.50 |
$12.60 |
$8.25 |
| 200 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 237.5 | LF |
$40.00 |
$25.30 |
$35.00 |
$27.31 |
$28.00 |
$24.15 |
$24.50 |
| 210 | 623(F)1724 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$2,750.00 |
$2,458.50 |
$2,460.00 |
$2,653.41 |
$2,635.00 |
$2,346.75 |
$2,384.00 |
| 220 | 623(G)1800 |
GUARDRAIL END TREATMENT (GET) | 3 | EA |
$4,000.00 |
$2,585.00 |
$2,585.00 |
$2,789.94 |
$2,850.00 |
$2,467.50 |
$2,507.00 |
| 230 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 220 | CY |
$24.00 |
$13.60 |
$25.00 |
$23.66 |
$24.00 |
$35.19 |
$31.00 |
| 240 | 501(G)1800 |
CLSM BACKFILL | 92 | CY |
$275.00 |
$249.00 |
$240.00 |
$285.82 |
$280.00 |
$383.68 |
$219.50 |
| 250 | 503(A)4220 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 357.34 | LF |
$300.00 |
$256.50 |
$285.00 |
$306.82 |
$307.87 |
$252.96 |
$272.50 |
| 260 | 503(A)4230 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 358.67 | LF |
$350.00 |
$319.00 |
$348.00 |
$367.79 |
$350.76 |
$315.73 |
$340.50 |
| 270 | 504(B)5300 |
SAW-CUT GROOVING | 580.1 | SY |
$10.00 |
$5.94 |
$5.95 |
$6.42 |
$6.20 |
$5.67 |
$5.75 |
| 280 | 504(D)5410 |
CONCRETE RAIL (TR3) | 437.5 | LF |
$100.00 |
$103.50 |
$100.00 |
$107.34 |
$100.50 |
$85.31 |
$138.50 |
| 290 | 506(A)7200 |
STRUCTURAL STEEL | 1,590 | LB |
$5.00 |
$3.65 |
$5.00 |
$2.64 |
$5.40 |
$6.91 |
$4.40 |
| 300 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$1,300.00 |
$976.00 |
$800.00 |
$604.49 |
$1,600.00 |
$1,587.78 |
$1,512.00 |
| 310 | 507(B)8310 |
WEATHERING STL EXP. BEARING ASSEMBLY | 16 | EA |
$1,300.00 |
$1,000.00 |
$800.00 |
$616.50 |
$1,630.00 |
$1,215.90 |
$1,459.00 |
| 320 | 509(A)0210 |
CLASS AA CONCRETE | 182.1 | CY |
$900.00 |
$910.00 |
$900.00 |
$1,100.00 |
$908.00 |
$1,038.02 |
$1,137.00 |
| 330 | 509(B)0320 |
CLASS A CONCRETE | 190.2 | CY |
$950.00 |
$945.00 |
$900.00 |
$956.59 |
$850.00 |
$1,000.94 |
$986.00 |
| 340 | 511(A)2210 |
REINFORCING STEEL | 73,730 | LB |
$2.00 |
$1.20 |
$1.17 |
$1.49 |
$1.45 |
$2.27 |
$1.85 |
| 350 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 304 | LF |
$50.00 |
$43.20 |
$40.00 |
$43.03 |
$37.67 |
$61.52 |
$47.10 |
| 360 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 736 | LF |
$55.00 |
$49.60 |
$50.00 |
$49.69 |
$52.60 |
$65.44 |
$56.00 |
| 370 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 304 | LF |
$30.00 |
$10.80 |
$20.00 |
$51.74 |
$16.00 |
$13.19 |
$24.30 |
| 380 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 736 | LF |
$20.00 |
$12.40 |
$20.00 |
$26.51 |
$22.00 |
$10.89 |
$23.40 |
| 390 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 400 | 516(A)8235 |
DRILLED SHAFTS 54" DIAMETER | 278 | LF |
$1,000.00 |
$882.00 |
$850.00 |
$865.47 |
$1,024.99 |
$814.68 |
$970.50 |
| 410 | 516(C)8400 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$3,000.00 |
$2,700.00 |
$3,000.00 |
$2,255.69 |
$3,600.00 |
$1,995.00 |
$4,441.00 |
| 420 | 518(B)0300 |
SEALED EXPANSION JOINTS | 39.99 | LF |
$510.00 |
$347.50 |
$330.00 |
$375.02 |
$336.53 |
$394.79 |
$363.00 |
| 430 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 2,360 | TON |
$65.00 |
$61.00 |
$62.00 |
$62.47 |
$60.00 |
$65.61 |
$67.50 |
| 440 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 790 | TON |
$45.00 |
$45.40 |
$46.00 |
$42.70 |
$51.00 |
$53.65 |
$49.50 |
| 450 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 72 | LF |
$35.00 |
$38.50 |
$35.00 |
$33.22 |
$35.00 |
$42.87 |
$91.80 |
| 460 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 46 | LF |
$40.00 |
$46.50 |
$40.00 |
$37.50 |
$30.00 |
$36.14 |
$55.10 |
| 470 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$40,000.00 |
$18,500.00 |
$30,000.00 |
$42,127.63 |
$59,000.00 |
$91,654.91 |
$45,410.00 |
| 480 | 853 5115 |
DELINEATORS(TYPE 2, CODE 1) | 10 | EA |
$20.00 |
$18.00 |
$20.00 |
$21.37 |
$24.00 |
$18.90 |
$19.20 |
| 490 | 856(A)8200 |
TRAFFIC STRIPE(MULTI-POLY.)(4" WIDE) | 2,300 | LF |
$1.00 |
$2.05 |
$2.20 |
$2.43 |
$2.24 |
$2.15 |
$2.20 |
| 500 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,035 | SD |
$0.5000 |
$0.0200 |
$0.0300 |
$0.0200 |
$0.0400 |
$0.0200 |
$0.0300 |
| 510 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,933 | SD |
$0.7500 |
$0.0200 |
$0.0300 |
$0.0200 |
$0.0400 |
$0.0200 |
$0.0300 |
| 520 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,380 | SD |
$1.50 |
$0.0200 |
$0.0300 |
$0.0200 |
$0.0400 |
$0.0200 |
$0.0300 |
| 530 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 1,380 | SD |
$1.50 |
$6.75 |
$4.95 |
$5.34 |
$4.95 |
$4.73 |
$4.80 |
| 540 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 4,140 | SD |
$1.50 |
$1.10 |
$1.10 |
$1.19 |
$1.75 |
$1.05 |
$1.05 |
| 550 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$8,500.00 |
$7,700.00 |
$10,922.30 |
$8,100.00 |
$7,350.00 |
$21,875.00 |
| 560 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,900.00 |
$3,500.00 |
$2,968.02 |
$3,500.00 |
$2,625.00 |
$3,467.00 |
| 570 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$132,660.00 |
$89,500.00 |
$100,000.00 |
$133,000.00 |
$115,000.00 |
$138,246.01 |
$83,493.10 |