| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$27,649.29 |
$240,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 53,513 | CY |
$10.00 |
$7.48 |
$8.12 |
| 30 | 202(B)2300 |
MUCK EXCAVATION | 500 | CY |
$30.00 |
$8.48 |
$30.46 |
| 40 | 202(D)2500 |
UNCLASSIFIED BORROW | 12,754 | CY |
$14.00 |
$9.41 |
$12.94 |
| 50 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$40,000.00 |
$10,600.00 |
$225,000.00 |
| 60 | 221(B)2300 |
TEMPORARY SILT FENCE | 28,815 | LF |
$2.50 |
$2.50 |
$2.36 |
| 70 | 221(E)2600 |
TEMPORARY SILT DIKE | 924 | LF |
$12.00 |
$11.82 |
$11.15 |
| 80 | 230(A)7200 |
SOLID SLAB SODDING | 196,692 | SY |
$3.00 |
$2.54 |
$2.40 |
| 90 | 232(B)9300 |
SEEDING METHOD B | 40.63 | AC |
$1,000.00 |
$652.22 |
$200.00 |
| 100 | 233(A)0200 |
VEGETATIVE MULCHING | 40.63 | AC |
$800.00 |
$742.00 |
$150.00 |
| 110 | 241 3100 |
MOWING | 81.26 | AC |
$160.00 |
$159.00 |
$150.00 |
| 120 | 303(A)1210 |
AGGREGATE BASE TYPE A, PLANT MIXED | 11,962 | CY |
$90.00 |
$90.64 |
$100.50 |
| 130 | 307(K)4200 |
STABILIZED SUBGRADE | 54,808 | SY |
$8.00 |
$8.22 |
$12.50 |
| 140 | 325 0100 |
SEPARATOR FABRIC | 61,417 | SY |
$2.00 |
$2.58 |
$2.00 |
| 150 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 7,794 | TON |
$40.00 |
$45.47 |
$45.00 |
| 160 | 407(B)7300 |
TACK COAT | 7,372 | GAL |
$3.00 |
$6.01 |
$2.25 |
| 170 | 408 8100 |
PRIME COAT | 35,556 | GAL |
$5.00 |
$7.21 |
$4.00 |
| 180 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 16,358 | TON |
$110.00 |
$109.82 |
$115.00 |
| 190 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 5,647 | TON |
$125.00 |
$122.10 |
$130.00 |
| 200 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 63 | CY |
$30.00 |
$31.67 |
$45.00 |
| 210 | 509(A)0200 |
CLASS AA CONCRETE | 266 | CY |
$700.00 |
$513.49 |
$588.00 |
| 220 | 509(D)0500 |
CLASS C CONCRETE | 959 | CY |
$500.00 |
$319.48 |
$325.00 |
| 230 | 511(A)2200 |
REINFORCING STEEL | 36,523 | LB |
$1.75 |
$1.41 |
$1.25 |
| 240 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 170 | TON |
$50.00 |
$73.56 |
$110.49 |
| 250 | 613(A)5224 |
36" R.C.PIPE CLASS III | 114 | LF |
$125.00 |
$180.07 |
$411.12 |
| 260 | 613(A)5358 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 742 | LF |
$110.00 |
$123.41 |
$305.77 |
| 270 | 613(A)5374 |
51" X 31" R.C.PIPE ARCH CLASS A-III | 212 | LF |
$250.00 |
$389.85 |
$477.55 |
| 280 | 613(B)5516 |
24" CORR. GALV. STEEL PIPE | 246 | LF |
$50.00 |
$35.13 |
$237.59 |
| 290 | 613(B)5528 |
36" CORR. GALV. STEEL PIPE | 156 | LF |
$70.00 |
$51.74 |
$329.19 |
| 300 | 613(H)6200 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 500 | LF |
$20.00 |
$53.70 |
$46.76 |
| 310 | 613(I)6305 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 100 | LF |
$21.00 |
$50.33 |
$69.70 |
| 320 | 613(L)6728 |
36" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$2,500.00 |
$2,107.92 |
$6,693.57 |
| 330 | 613(M)6964 |
TYPE B4 CULVERT END TREATMENT | 9 | EA |
$1,500.00 |
$2,305.92 |
$2,000.00 |
| 340 | 613(M)6984 |
TYPE BB4 CULVERT END TREATMENT | 3 | EA |
$2,900.00 |
$3,553.23 |
$3,000.00 |
| 350 | 613(M)6988 |
TYPE CC4 CULVERT END TREATMENT | 2 | EA |
$3,000.00 |
$4,198.45 |
$3,800.00 |
| 360 | 613(M)6992 |
TYPE DD4 CULVERT END TREATMENT | 1 | EA |
$3,500.00 |
$5,142.17 |
$3,900.00 |
| 370 | 613(M)7008 |
TYPE B6 CULVERT END TREATMENT | 9 | EA |
$2,000.00 |
$2,878.54 |
$2,800.00 |
| 380 | 613(M)7028 |
TYPE BB6 CULVERT END TREATMENT | 3 | EA |
$3,000.00 |
$4,412.89 |
$3,750.00 |
| 390 | 613(M)7036 |
TYPE DD6 CULVERT END TREATMENT | 1 | EA |
$3,300.00 |
$7,784.72 |
$5,500.00 |
| 400 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$15,900.00 |
$100,000.00 |
| 410 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 19,571 | SY |
$5.00 |
$4.93 |
$5.08 |
| 420 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 622 | LF |
$4.50 |
$4.24 |
$15.00 |
| 430 | 619(C)6600 |
SAWING PAVEMENT | 190 | LF |
$10.00 |
$14.14 |
$5.12 |
| 440 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,116 | LF |
$30.00 |
$37.10 |
$35.00 |
| 450 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 8 | EA |
$2,800.00 |
$3,392.00 |
$3,200.00 |
| 460 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 12 | EA |
$2,200.00 |
$2,968.00 |
$5,520.01 |
| 470 | 624(C)3400 |
FENCE-STYLE SWF (4 BARBED WIRE) | 152 | LF |
$8.00 |
$7.26 |
$7.35 |
| 480 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 5,432 | LF |
$9.00 |
$9.01 |
$7.55 |
| 490 | 624(C)3410 |
FENCE-STYLE SWF (6 BARBED WIRE) | 9,073 | LF |
$9.00 |
$9.54 |
$7.75 |
| 500 | 853 5175 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 24 | EA |
$18.00 |
$15.90 |
$15.00 |
| 510 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$30,000.00 |
$61,834.17 |
$100,000.00 |
| 520 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 80 | CY |
$35.00 |
$37.85 |
$29.59 |
| 530 | 501(G)1800 |
CLSM BACKFILL | 134 | CY |
$200.00 |
$333.62 |
$217.70 |
| 540 | 504(A)5200 |
APPROACH SLAB | 187.4 | SY |
$300.00 |
$377.00 |
$361.50 |
| 550 | 504(B)5300 |
SAW-CUT GROOVING | 988.9 | SY |
$5.00 |
$5.19 |
$4.90 |
| 560 | 504(D)5420 |
CONCRETE RAIL (TR4) | 441 | LF |
$125.00 |
$160.74 |
$107.14 |
| 570 | 506(A)7200 |
STRUCTURAL STEEL | 128,210 | LB |
$3.00 |
$2.94 |
$2.92 |
| 580 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$1,000.00 |
$651.65 |
$1,151.53 |
| 590 | 507(B)8300 |
STAINLESS STEEL EXP. BEARING ASSEMBLY | 16 | EA |
$3,500.00 |
$2,443.27 |
$2,346.94 |
| 600 | 507(C)8400 |
ELASTOMERIC BEARING PADS | 16 | EA |
$700.00 |
$676.45 |
$581.63 |
| 610 | 509(A)0210 |
CLASS AA CONCRETE | 221.8 | CY |
$700.00 |
$937.02 |
$816.33 |
| 620 | 509(B)0320 |
CLASS A CONCRETE | 111.6 | CY |
$750.00 |
$1,163.20 |
$785.71 |
| 630 | 509(D)0510 |
CLASS C CONCRETE | 25 | CY |
$500.00 |
$967.46 |
$484.69 |
| 640 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 64,530 | LB |
$1.75 |
$1.75 |
$1.51 |
| 650 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 714 | LF |
$50.00 |
$43.00 |
$43.52 |
| 660 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 714 | LF |
$25.00 |
$33.93 |
$23.47 |
| 670 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
| 680 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 596 | SY |
$5.00 |
$4.88 |
$4.60 |
| 690 | 516(A)8230 |
DRILLED SHAFTS 48" DIAMETER | 176 | LF |
$1,000.00 |
$1,175.01 |
$1,029.37 |
| 700 | 516(C)8400 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$5,000.00 |
$2,756.00 |
$3,571.43 |
| 710 | 523(A)3200 |
SEALER CRACK PREPARATION | 163 | LF |
$5.00 |
$5.30 |
$5.00 |
| 720 | 523(B)3300 |
SEALER RESIN | 1.8 | GAL |
$150.00 |
$254.40 |
$240.00 |
| 730 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 1,150 | TON |
$60.00 |
$63.26 |
$158.14 |
| 740 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 190 | TON |
$50.00 |
$92.81 |
$141.61 |
| 750 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$35.00 |
$47.85 |
$35.71 |
| 760 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 70 | LF |
$35.00 |
$33.50 |
$30.61 |
| 770 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$30,000.00 |
$204,000.00 |
$100,000.00 |
| 780 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$5,000.00 |
$61,834.17 |
$100,000.00 |
| 790 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 80 | CY |
$35.00 |
$30.28 |
$29.59 |
| 800 | 501(G)1800 |
CLSM BACKFILL | 122 | CY |
$200.00 |
$297.33 |
$221.43 |
| 810 | 503(A)4220 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 537 | LF |
$275.00 |
$279.25 |
$279.29 |
| 820 | 504(A)5200 |
APPROACH SLAB | 187.4 | SY |
$300.00 |
$441.62 |
$361.50 |
| 830 | 504(B)5300 |
SAW-CUT GROOVING | 789 | SY |
$5.00 |
$5.19 |
$4.90 |
| 840 | 504(D)5420 |
CONCRETE RAIL (TR4) | 351 | LF |
$125.00 |
$189.00 |
$110.20 |
| 850 | 506(A)7200 |
STRUCTURAL STEEL | 1,050 | LB |
$3.00 |
$7.22 |
$4.23 |
| 860 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$1,000.00 |
$662.94 |
$1,162.66 |
| 870 | 507(B)8300 |
STAINLESS STEEL EXP. BEARING ASSEMBLY | 16 | EA |
$3,500.00 |
$2,195.95 |
$2,244.90 |
| 880 | 507(C)8400 |
ELASTOMERIC BEARING PADS | 16 | EA |
$700.00 |
$381.73 |
$581.63 |
| 890 | 509(A)0210 |
CLASS AA CONCRETE | 183 | CY |
$700.00 |
$1,247.12 |
$831.63 |
| 900 | 509(B)0320 |
CLASS A CONCRETE | 107.6 | CY |
$750.00 |
$1,478.83 |
$790.82 |
| 910 | 509(D)0510 |
CLASS C CONCRETE | 25 | CY |
$500.00 |
$1,209.64 |
$484.69 |
| 920 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 54,310 | LB |
$1.75 |
$1.73 |
$1.54 |
| 930 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 702 | LF |
$50.00 |
$45.51 |
$43.52 |
| 940 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 702 | LF |
$25.00 |
$34.49 |
$20.41 |
| 950 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
| 960 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 627 | SY |
$5.00 |
$4.88 |
$4.60 |
| 970 | 516(A)8230 |
DRILLED SHAFTS 48" DIAMETER | 232 | LF |
$1,000.00 |
$952.55 |
$923.88 |
| 980 | 516(C)8400 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$5,000.00 |
$2,756.00 |
$3,571.43 |
| 990 | 523(A)3200 |
SEALER CRACK PREPARATION | 163 | LF |
$5.00 |
$5.30 |
$5.00 |
| 1,000 | 523(B)3300 |
SEALER RESIN | 1.8 | GAL |
$150.00 |
$254.40 |
$240.00 |
| 1,010 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 1,230 | TON |
$60.00 |
$54.01 |
$155.35 |
| 1,020 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 235 | TON |
$50.00 |
$54.86 |
$131.65 |
| 1,030 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$35.00 |
$55.06 |
$35.71 |
| 1,040 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 70 | LF |
$35.00 |
$42.16 |
$30.61 |
| 1,050 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$30,000.00 |
$188,000.00 |
$96,000.00 |
| 1,060 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 80 | CY |
$35.00 |
$30.28 |
$27.55 |
| 1,070 | 501(G)1800 |
CLSM BACKFILL | 122 | CY |
$200.00 |
$346.95 |
$221.43 |
| 1,080 | 503(A)4220 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 537 | LF |
$275.00 |
$279.25 |
$279.29 |
| 1,090 | 504(A)5200 |
APPROACH SLAB | 187.4 | SY |
$300.00 |
$441.62 |
$361.50 |
| 1,100 | 504(B)5300 |
SAW-CUT GROOVING | 789 | SY |
$5.00 |
$5.19 |
$4.90 |
| 1,110 | 504(D)5420 |
CONCRETE RAIL (TR4) | 351 | LF |
$125.00 |
$189.00 |
$110.20 |
| 1,120 | 506(A)7200 |
STRUCTURAL STEEL | 1,050 | LB |
$3.00 |
$7.22 |
$4.23 |
| 1,130 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$1,000.00 |
$511.58 |
$1,162.66 |
| 1,140 | 507(B)8300 |
STAINLESS STEEL EXP. BEARING ASSEMBLY | 16 | EA |
$3,500.00 |
$2,195.95 |
$2,244.90 |
| 1,150 | 507(C)8400 |
ELASTOMERIC BEARING PADS | 16 | EA |
$700.00 |
$381.73 |
$581.63 |
| 1,160 | 509(A)0210 |
CLASS AA CONCRETE | 183 | CY |
$700.00 |
$982.43 |
$831.63 |
| 1,170 | 509(B)0320 |
CLASS A CONCRETE | 107.6 | CY |
$750.00 |
$1,366.31 |
$790.82 |
| 1,180 | 509(D)0510 |
CLASS C CONCRETE | 25 | CY |
$500.00 |
$967.46 |
$484.69 |
| 1,190 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 54,310 | LB |
$1.75 |
$1.75 |
$1.56 |
| 1,200 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 672 | LF |
$50.00 |
$42.30 |
$44.54 |
| 1,210 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 672 | LF |
$25.00 |
$36.05 |
$21.43 |
| 1,220 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
| 1,230 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 627 | SY |
$5.00 |
$4.88 |
$4.60 |
| 1,240 | 516(A)8230 |
DRILLED SHAFTS 48" DIAMETER | 236 | LF |
$1,000.00 |
$1,071.68 |
$923.11 |
| 1,250 | 516(C)8400 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$5,000.00 |
$2,438.00 |
$3,571.43 |
| 1,260 | 523(A)3200 |
SEALER CRACK PREPARATION | 163 | LF |
$5.00 |
$5.30 |
$5.00 |
| 1,270 | 523(B)3300 |
SEALER RESIN | 1.8 | GAL |
$150.00 |
$254.40 |
$240.00 |
| 1,280 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 1,430 | TON |
$60.00 |
$57.43 |
$156.64 |
| 1,290 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 245 | TON |
$50.00 |
$48.86 |
$129.93 |
| 1,300 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$35.00 |
$83.89 |
$35.71 |
| 1,310 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 70 | LF |
$35.00 |
$42.16 |
$30.61 |
| 1,320 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$30,000.00 |
$201,384.00 |
$100,000.00 |
| 1,330 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 25,992 | SD |
$0.4000 |
$1.06 |
$1.00 |
| 1,340 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 5,076 | SD |
$0.6000 |
$0.8000 |
$0.7500 |
| 1,350 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,680 | SD |
$1.40 |
$2.12 |
$2.00 |
| 1,360 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 9,360 | SD |
$0.7500 |
$1.06 |
$1.00 |
| 1,370 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 18,720 | SD |
$0.3500 |
$0.5300 |
$0.5000 |
| 1,380 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 628 | SD |
$11.50 |
$21.20 |
$20.00 |
| 1,390 | 413(F)4700 |
SINUSOIDAL RUMBLE STRIP | 34,200 | LF |
$0.2500 |
$0.3500 |
$0.4800 |
| 1,400 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 12 | EA |
$100.00 |
$291.50 |
$275.00 |
| 1,410 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 70 | SF |
$22.85 |
$37.10 |
$35.00 |
| 1,420 | 851(C)2430 |
2 1/2" SQUARE TUBE POST | 140 | LF |
$10.00 |
$12.72 |
$12.00 |
| 1,430 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 41,600 | LF |
$0.6500 |
$0.6700 |
$0.6300 |
| 1,440 | 856(A)8216 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 28 | LF |
$4.10 |
$26.50 |
$25.00 |
| 1,450 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$90,000.00 |
$117,209.50 |
$150,000.00 |
| 1,460 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$8,000.00 |
$7,597.97 |
$37,000.00 |
| 1,470 | 640(A)1210 |
FIELD OFFICE | 1 | EA |
$20,000.00 |
$9,010.00 |
$50,000.00 |
| 1,480 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$532,000.00 |
$556,160.80 |
$610,000.00 |