| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$35,000.00 |
$10,000.00 |
$77,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 448 | CY |
$30.00 |
$12.00 |
$32.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 5,741 | CY |
$18.00 |
$16.00 |
$27.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$10,000.00 |
$15,000.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 1,600 | LF |
$3.50 |
$3.00 |
$2.55 |
| 60 | 230(A)7200 |
SOLID SLAB SODDING | 11,606 | SY |
$5.00 |
$3.25 |
$2.86 |
| 70 | 230(F)7700 |
WATERING | 465 | KGAL |
$13.00 |
$12.00 |
$10.49 |
| 80 | 233(A)0200 |
VEGETATIVE MULCHING | 2.4 | AC |
$1,000.00 |
$500.00 |
$4,148.18 |
| 90 | 234(A)1200 |
FERTILIZING (10-20-10) | 1.16 | TON |
$1,500.00 |
$2,800.00 |
$1,538.93 |
| 100 | 241 3100 |
MOWING | 4.8 | AC |
$500.00 |
$50.00 |
$423.87 |
| 110 | 303(A)1200 |
AGGREGATE BASE TYPE A | 961 | CY |
$80.00 |
$74.00 |
$96.00 |
| 115 | 311(C)6400 |
PROCESS EXISTING BASE & SURFACE,METHOD C | 7,980 | LF |
$9.50 |
$14.10 |
$42.60 |
| 120 | 326(A)1200 |
GEOTEXTILE REINFORCEMENT | 3,214 | SY |
$6.00 |
$6.15 |
$6.40 |
| 130 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,208 | TON |
$60.00 |
$58.00 |
$64.00 |
| 140 | 407(B)7300 |
TACK COAT | 3,365 | GAL |
$4.00 |
$6.50 |
$5.73 |
| 150 | 408 8100 |
PRIME COAT | 1,969 | GAL |
$6.00 |
$7.00 |
$7.50 |
| 160 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 730 | TON |
$150.00 |
$163.20 |
$156.34 |
| 170 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 5,244 | TON |
$175.00 |
$171.50 |
$164.13 |
| 180 | 613(H)6210 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 45 | LF |
$20.00 |
$30.00 |
$22.00 |
| 190 | 613(I)6315 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 15 | LF |
$20.00 |
$30.00 |
$22.00 |
| 200 | 613(Q)7500 |
OUTLET LATERAL HEADWALL | 1 | EA |
$500.00 |
$500.00 |
$535.00 |
| 210 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$10,000.00 |
$18,000.00 |
| 220 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 1,700 | SY |
$14.00 |
$10.00 |
$14.91 |
| 230 | 619(C)6600 |
SAWING PAVEMENT | 44 | LF |
$7.00 |
$20.00 |
$7.46 |
| 240 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 375 | LF |
$30.00 |
$35.00 |
$32.75 |
| 250 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$3,000.00 |
$3,300.00 |
$4,260.00 |
| 260 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$3,200.00 |
$3,400.00 |
$3,195.00 |
| 270 | 624(A)3200 |
FENCE-STYLE WWF | 785 | LF |
$9.00 |
$15.00 |
$9.32 |
| 280 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 908 | LF |
$9.00 |
$11.00 |
$8.52 |
| 290 | 853 5175 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 12 | EA |
$20.00 |
$24.00 |
$21.30 |
| 300 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 80 | CY |
$25.00 |
$18.00 |
$112.72 |
| 310 | 501(G)1800 |
CLSM BACKFILL | 111.4 | CY |
$240.00 |
$186.00 |
$227.99 |
| 320 | 504(A)5200 |
APPROACH SLAB | 187.6 | SY |
$300.00 |
$219.00 |
$396.01 |
| 330 | 504(B)5300 |
SAW-CUT GROOVING | 678.6 | SY |
$5.50 |
$6.00 |
$5.33 |
| 340 | 504(D)5420 |
CONCRETE RAIL (TR4) | 411 | LF |
$110.00 |
$109.00 |
$187.25 |
| 350 | 506(A)7225 |
STRUCTURAL STEEL M270 GRADE 50W | 141,990 | LB |
$3.00 |
$2.30 |
$3.00 |
| 360 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$1,600.00 |
$620.00 |
$1,500.00 |
| 370 | 507(B)8300 |
STAINLESS STEEL EXP. BEARING ASSEMBLY | 20 | EA |
$3,500.00 |
$2,500.00 |
$3,000.00 |
| 380 | 507(C)8400 |
ELASTOMERIC BEARING PADS | 20 | EA |
$550.00 |
$500.00 |
$800.00 |
| 390 | 509(A)0210 |
CLASS AA CONCRETE | 196 | CY |
$1,400.00 |
$2,800.00 |
$2,500.00 |
| 400 | 509(B)0320 |
CLASS A CONCRETE | 145.6 | CY |
$800.00 |
$760.00 |
$2,100.00 |
| 410 | 509(D)0510 |
CLASS C CONCRETE | 10.5 | CY |
$1,000.00 |
$350.00 |
$2,000.00 |
| 420 | 509(F)0700 |
ULTRA HIGH PERFORMANCE CONCRETE | 32.2 | CY |
$4,000.00 |
$4,250.00 |
$8,270.00 |
| 430 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 77,500 | LB |
$1.75 |
$1.55 |
$2.00 |
| 440 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 480 | LF |
$50.00 |
$60.00 |
$50.00 |
| 450 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 480 | LF |
$27.00 |
$15.00 |
$37.00 |
| 460 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
| 470 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 588 | SY |
$6.00 |
$6.00 |
$5.33 |
| 480 | 516(A)8240 |
DRILLED SHAFTS 60" DIAMETER | 128 | LF |
$1,250.00 |
$1,400.00 |
$1,200.00 |
| 490 | 516(C)8400 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$3,000.00 |
$2,000.00 |
$1,704.00 |
| 500 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 370 | TON |
$50.00 |
$58.00 |
$89.71 |
| 510 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 60 | TON |
$50.00 |
$49.00 |
$105.14 |
| 520 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 86 | LF |
$35.00 |
$24.00 |
$41.62 |
| 530 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 22 | LF |
$30.00 |
$24.00 |
$48.07 |
| 540 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$115,000.00 |
$75,000.00 |
$111,863.49 |
| 550 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,100 | SD |
$0.4000 |
$2.41 |
$2.13 |
| 560 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,100 | SD |
$0.7000 |
$0.3000 |
$0.2700 |
| 570 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,360 | SD |
$1.50 |
$1.20 |
$1.07 |
| 580 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 840 | SD |
$0.8000 |
$2.40 |
$2.13 |
| 590 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 8,820 | SD |
$1.00 |
$0.2000 |
$0.1600 |
| 600 | 880(F)6700 |
DRUMS | 4,200 | SD |
$0.5000 |
$0.1500 |
$0.1100 |
| 610 | 880(G)6805 |
CHANNELIZER CONES | 5,040 | SD |
$0.3000 |
$0.1200 |
$0.1100 |
| 620 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 896 | SD |
$15.00 |
$6.00 |
$5.33 |
| 630 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 6 | EA |
$100.00 |
$300.00 |
$319.50 |
| 640 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 38 | SF |
$24.00 |
$54.00 |
$47.93 |
| 650 | 851(C)2430 |
2 1/2" SQUARE TUBE POST | 56 | LF |
$11.80 |
$24.00 |
$21.30 |
| 660 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 4,375 | LF |
$0.6000 |
$1.50 |
$1.33 |
| 670 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$35,000.00 |
$8,500.00 |
$13,455.00 |
| 680 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,250.00 |
$7,100.00 |
| 690 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$185,000.00 |
$72,000.00 |
$247,116.00 |