| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$35,000.00 |
$50,000.00 |
$300,000.00 |
$35,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 21,420 | CY |
$10.00 |
$13.00 |
$7.00 |
$16.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 6,361 | CY |
$12.00 |
$22.68 |
$10.00 |
$12.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$60,000.00 |
$70,000.00 |
$175,000.00 |
$107,500.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 21,500 | LF |
$3.15 |
$2.58 |
$2.39 |
$2.58 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 3,870 | LF |
$9.00 |
$9.33 |
$10.00 |
$8.00 |
| 70 | 221(F)2700 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 8.2 | CY |
$170.00 |
$125.00 |
$453.76 |
$315.07 |
| 80 | 230(A)7200 |
SOLID SLAB SODDING | 200,000 | SY |
$3.00 |
$2.66 |
$2.39 |
$2.69 |
| 90 | 232(A)9200 |
SEEDING METHOD A | 33 | AC |
$1,000.00 |
$3,750.00 |
$4,495.00 |
$3,750.00 |
| 100 | 233(A)0200 |
VEGETATIVE MULCHING | 33 | AC |
$225.00 |
$600.00 |
$1,000.00 |
$588.00 |
| 110 | 241 3100 |
MOWING | 66 | AC |
$165.00 |
$100.00 |
$211.00 |
$115.00 |
| 120 | 303(B)1300 |
AGGREGATE BASE TYPE B | 766 | CY |
$80.00 |
$81.33 |
$65.00 |
$74.00 |
| 130 | 310(B)5300 |
SUBGRADE, METHOD B | 59,718 | SY |
$3.00 |
$0.8500 |
$1.75 |
$2.25 |
| 140 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 503 | TON |
$50.00 |
$36.86 |
$62.00 |
$55.00 |
| 150 | 407(B)7300 |
TACK COAT | 16,680 | GAL |
$4.00 |
$3.14 |
$3.00 |
$4.77 |
| 160 | 408 8100 |
PRIME COAT | 11,177 | GAL |
$4.00 |
$1.00 |
$6.00 |
$7.50 |
| 170 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 26,714 | TON |
$120.00 |
$117.65 |
$130.00 |
$126.24 |
| 180 | 411(C)1400 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 7,493 | TON |
$140.00 |
$130.73 |
$145.00 |
$149.20 |
| 190 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 6,224 | TON |
$150.00 |
$126.88 |
$150.00 |
$138.62 |
| 200 | 412 3100 |
COLD MILLING PAVEMENT | 69,112 | SY |
$3.00 |
$1.08 |
$1.00 |
$2.24 |
| 210 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 79 | CY |
$24.00 |
$40.00 |
$40.00 |
$40.00 |
| 220 | 509(A)0200 |
CLASS AA CONCRETE | 284 | CY |
$700.00 |
$700.00 |
$750.00 |
$1,850.00 |
| 230 | 509(B)0300 |
CLASS A CONCRETE | 179 | CY |
$750.00 |
$361.00 |
$375.00 |
$1,200.00 |
| 240 | 509(D)0500 |
CLASS C CONCRETE | 40 | CY |
$350.00 |
$300.00 |
$300.00 |
$750.00 |
| 250 | 511(A)2200 |
REINFORCING STEEL | 52,630 | LB |
$1.50 |
$1.50 |
$1.75 |
$1.75 |
| 260 | 613(A)5216 |
24" R.C.PIPE CLASS III | 58 | LF |
$90.00 |
$105.40 |
$105.40 |
$120.00 |
| 270 | 613(A)5404 |
19" X 30" R.C.PIPE ELL. CLASS HE-III | 140 | LF |
$160.00 |
$127.80 |
$127.80 |
$150.00 |
| 280 | 613(A)5408 |
24" X 38" R.C.PIPE ELL. CLASS HE-III | 110 | LF |
$185.00 |
$136.20 |
$136.20 |
$200.00 |
| 290 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 218 | LF |
$48.00 |
$64.10 |
$64.10 |
$75.00 |
| 300 | 613(B)5524 |
30" CORR. GALV. STEEL PIPE | 32 | LF |
$85.00 |
$87.70 |
$87.70 |
$125.00 |
| 310 | 613(B)5536 |
48" CORR. GALV. STEEL PIPE | 224 | LF |
$88.00 |
$126.70 |
$126.70 |
$135.00 |
| 320 | 613(B)5604 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 176 | LF |
$45.00 |
$66.10 |
$66.10 |
$75.00 |
| 330 | 613(M)6960 |
TYPE A4 CULVERT END TREATMENT | 18 | EA |
$1,300.00 |
$2,000.00 |
$2,000.00 |
$2,300.00 |
| 340 | 613(M)6964 |
TYPE B4 CULVERT END TREATMENT | 10 | EA |
$1,900.00 |
$2,900.00 |
$2,900.00 |
$2,850.00 |
| 350 | 613(M)6968 |
TYPE C4 CULVERT END TREATMENT | 2 | EA |
$3,000.00 |
$4,100.00 |
$4,100.00 |
$3,750.00 |
| 360 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$25,000.00 |
$41,410.75 |
$150,000.00 |
$35,000.00 |
| 370 | 619(B)6352 |
REMOVAL OF FENCE | 11,805 | LF |
$3.00 |
$1.00 |
$1.00 |
$1.00 |
| 380 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 11,447 | SY |
$7.00 |
$10.00 |
$7.00 |
$7.79 |
| 390 | 619(B)6384 |
REMOVAL OF ASPHALT DRIVEWAY | 1,420 | SY |
$8.75 |
$12.68 |
$9.00 |
$3.52 |
| 400 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 950 | LF |
$5.75 |
$9.00 |
$4.00 |
$1.80 |
| 410 | 619(C)6600 |
SAWING PAVEMENT | 42,406 | LF |
$4.00 |
$0.2500 |
$0.2500 |
$4.00 |
| 420 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,450 | LF |
$30.00 |
$25.00 |
$30.00 |
$30.00 |
| 430 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 6 | EA |
$2,750.00 |
$3,500.00 |
$3,550.00 |
$3,550.00 |
| 440 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 6 | EA |
$2,850.00 |
$3,500.00 |
$5,694.67 |
$3,550.00 |
| 450 | 624(C)3410 |
FENCE-STYLE SWF (6 BARBED WIRE) | 12,492 | LF |
$8.00 |
$6.75 |
$7.00 |
$7.00 |
| 460 | 629(A)7200 |
MAILBOX INSTALLATION-SINGLE | 1 | EA |
$165.00 |
$250.00 |
$500.00 |
$500.00 |
| 470 | 629(C)7400 |
REMOVAL OF MAILBOX INSTALLATION | 1 | EA |
$25.00 |
$65.00 |
$500.00 |
$500.00 |
| 480 | 629(E)7600 |
MAILBOX | 1 | EA |
$50.00 |
$45.00 |
$500.00 |
$500.00 |
| 490 | 853 5175 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 40 | EA |
$15.00 |
$13.85 |
$20.00 |
$20.00 |
| 500 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 90 | CY |
$30.00 |
$50.00 |
$50.00 |
$15.00 |
| 510 | 501(G)1800 |
CLSM BACKFILL | 84 | CY |
$250.00 |
$250.00 |
$250.00 |
$200.00 |
| 520 | 504(A)5200 |
APPROACH SLAB | 187.4 | SY |
$300.00 |
$300.00 |
$300.00 |
$375.00 |
| 530 | 504(B)5300 |
SAW-CUT GROOVING | 691.2 | SY |
$5.00 |
$5.20 |
$5.20 |
$5.20 |
| 540 | 504(D)5420 |
CONCRETE RAIL (TR4) | 311 | LF |
$100.00 |
$115.00 |
$115.00 |
$120.00 |
| 550 | 507(C)8400 |
ELASTOMERIC BEARING PADS | 2 | EA |
$4,000.00 |
$10,000.00 |
$10,000.00 |
$20,000.00 |
| 560 | 509(A)0210 |
CLASS AA CONCRETE | 386.7 | CY |
$750.00 |
$1,700.00 |
$1,700.00 |
$1,200.00 |
| 570 | 509(B)0320 |
CLASS A CONCRETE | 99.8 | CY |
$600.00 |
$1,250.00 |
$1,250.00 |
$1,500.00 |
| 580 | 509(D)0510 |
CLASS C CONCRETE | 11.3 | CY |
$800.00 |
$800.00 |
$800.00 |
$950.00 |
| 590 | 511(A)2210 |
REINFORCING STEEL | 240 | LB |
$1.50 |
$1.75 |
$1.75 |
$2.00 |
| 600 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 90,890 | LB |
$1.75 |
$2.00 |
$2.00 |
$2.00 |
| 610 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 530 | LF |
$45.00 |
$55.00 |
$55.00 |
$75.00 |
| 620 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 530 | LF |
$20.00 |
$18.00 |
$18.00 |
$17.50 |
| 630 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 640 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 369 | SY |
$5.00 |
$5.00 |
$5.00 |
$5.00 |
| 650 | 516(A)8240 |
DRILLED SHAFTS 60" DIAMETER | 240 | LF |
$1,200.00 |
$1,100.00 |
$1,100.00 |
$775.00 |
| 660 | 516(C)8400 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$6,000.00 |
$2,000.00 |
$2,000.00 |
$2,500.00 |
| 670 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 820 | TON |
$55.00 |
$65.00 |
$65.00 |
$75.00 |
| 680 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 135 | TON |
$55.00 |
$60.00 |
$60.00 |
$75.00 |
| 690 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 86 | LF |
$50.00 |
$55.00 |
$55.00 |
$60.00 |
| 700 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 80 | LF |
$50.00 |
$55.00 |
$55.00 |
$60.00 |
| 710 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$30,000.00 |
$40,000.00 |
$220,000.00 |
$300,000.00 |
| 720 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 1,110 | CY |
$24.00 |
$6.00 |
$12.35 |
$12.00 |
| 730 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 153 | CY |
$40.00 |
$40.00 |
$40.00 |
$55.00 |
| 740 | 502 3100 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$75,000.00 |
$30,000.00 |
$30,000.00 |
$125,000.00 |
| 750 | 509(A)0210 |
CLASS AA CONCRETE | 344.1 | CY |
$700.00 |
$500.00 |
$525.00 |
$900.00 |
| 760 | 511(A)2210 |
REINFORCING STEEL | 53,010 | LB |
$1.50 |
$1.50 |
$1.50 |
$2.00 |
| 770 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$15,000.00 |
$10,000.00 |
$85,000.00 |
$50,000.00 |
| 780 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 13 | SY |
$5.00 |
$10.00 |
$10.00 |
$10.00 |
| 790 | 540 8120 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 2 | EA |
$4,000.00 |
$4,800.00 |
$5,000.00 |
$25,000.00 |
| 800 | 823 6100 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 300 | SD |
$150.00 |
$1.00 |
$175.00 |
$175.00 |
| 810 | 857(A)9200 |
CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) | 58,876 | LF |
$0.1500 |
$0.4000 |
$0.2100 |
$0.2100 |
| 820 | 857(E)9620 |
(PL)CONST.ZONE PAV.MKRS(FLEX TAB)TYP.2-1 | 17,296 | EA |
$0.6000 |
$0.6500 |
$0.6000 |
$0.6000 |
| 830 | 858(A)0224 |
PAVE.MARKERS CLASS A TYPE 2-C | 376 | EA |
$2.00 |
$9.00 |
$10.00 |
$10.00 |
| 840 | 858(A)0228 |
PAVE.MARKERS CLASS A TYPE 2-D | 376 | EA |
$2.00 |
$9.00 |
$10.00 |
$10.00 |
| 850 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 7,600 | SD |
$7.04 |
$5.00 |
$2.00 |
$2.00 |
| 860 | 876(A)3210 |
(PL)TRUCK MOUNTED ATTENUATOR | 50 | SD |
$30.89 |
$8.00 |
$75.00 |
$75.00 |
| 870 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 600 | LF |
$25.00 |
$28.00 |
$60.00 |
$75.00 |
| 880 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 3,000 | LF |
$5.00 |
$6.00 |
$15.00 |
$7.00 |
| 890 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 8,100 | SD |
$0.3500 |
$0.0200 |
$0.5000 |
$0.5400 |
| 900 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 5,400 | SD |
$1.00 |
$3.00 |
$0.7500 |
$0.8100 |
| 910 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 9,990 | SD |
$1.20 |
$3.00 |
$1.50 |
$1.62 |
| 920 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 3,240 | SD |
$2.15 |
$5.00 |
$2.25 |
$2.44 |
| 930 | 880(C)6420 |
WING BARRICADES | 1,080 | SD |
$0.3500 |
$0.0200 |
$1.00 |
$1.08 |
| 940 | 880(D)6500 |
VERTICAL PANELS | 5,940 | SD |
$0.2500 |
$0.1000 |
$0.2000 |
$0.2200 |
| 950 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 2,160 | SD |
$0.6000 |
$0.1500 |
$5.00 |
$5.41 |
| 960 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 13,365 | SD |
$0.8800 |
$0.0200 |
$0.1000 |
$0.1100 |
| 970 | 880(E)6616 |
WARNING LIGHTS(TYPE D) | 7,560 | SD |
$1.00 |
$0.1500 |
$2.00 |
$2.16 |
| 980 | 880(F)6700 |
DRUMS | 24,840 | SD |
$0.1200 |
$0.1500 |
$0.5000 |
$0.5400 |
| 990 | 880(G)6805 |
CHANNELIZER CONES | 42,660 | SD |
$0.3500 |
$0.0200 |
$0.5000 |
$0.5400 |
| 1,000 | 880(I)7000 |
FLAGGER | 270 | SD |
$400.00 |
$1.00 |
$1.00 |
$482.00 |
| 1,010 | 880(L)7310 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BID) | 400 | HOUR |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
| 1,020 | 880(W)7700 |
PILOT CAR | 1 | LSUM |
$3,000.00 |
$20,000.00 |
$99,000.00 |
$34,400.92 |
| 1,030 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 400 | SD |
$14.00 |
$65.00 |
$25.00 |
$27.06 |
| 1,040 | 413(F)4700 |
SINUSOIDAL RUMBLE STRIP | 73,800 | LF |
$0.3900 |
$0.5400 |
$0.5000 |
$0.5100 |
| 1,050 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 15 | EA |
$60.00 |
$150.00 |
$300.00 |
$324.70 |
| 1,060 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 7 | EA |
$210.00 |
$325.00 |
$500.00 |
$541.17 |
| 1,070 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 545.56 | SF |
$28.00 |
$44.00 |
$35.00 |
$37.88 |
| 1,080 | 851(C)2415 |
2" SQUARE TUBE POST | 624 | LF |
$9.00 |
$7.00 |
$11.00 |
$11.91 |
| 1,090 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 66,104 | LF |
$0.5700 |
$0.8700 |
$0.6700 |
$0.7300 |
| 1,100 | 856(A)8216 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 292 | LF |
$7.26 |
$4.00 |
$10.00 |
$10.82 |
| 1,110 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 1,000 | LF |
$1.20 |
$4.44 |
$1.00 |
$1.08 |
| 1,120 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$30,000.00 |
$47,881.41 |
$95,000.00 |
$100,000.00 |
| 1,130 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,500.00 |
$1,065.35 |
$50,000.00 |
$7,500.00 |
| 1,140 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$455,000.00 |
$471,000.00 |
$532,000.00 |
$557,000.00 |