Bid tab 220301

Let Sep 15, 2022 · Division 1 · Sequoyah Sign up free

‹ Sep 2022 results

BRIDGE AND APPROACHES SH-101: OVER BIG SKIN BAYOU , 7.6 MILES EAST OF THE US -59 JUNCTION NEAR SALLISAW . PROJECT LENGTH = 0.527 MILE

Let date
Thursday, September 15, 2022
Contract
220301
J/P numbers
29780(04)
District
Division 1
County
Sequoyah
Highway
Limits
BRIDGE AND APPROACHES SH-101: OVER BIG SKIN BAYOU , 7.6 MILES EAST OF THE US -59 JUNCTION NEAR SALLISAW . PROJECT LENGTH = 0.527 MILE
Project number
STP-268C(084)PM

Bidders 4

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$4,363,021
1 Treas Construction Inc Low bidder $3,927,508 -10.0%
2 L & N BRIDGE, LLC $3,945,190 -9.6% +0.5%
3 C3 Construction, Inc. $4,401,833 +0.9% +12.1%
4 Wyatt Contracting, Inc./Central Bridge Company JV $4,538,124 +4.0% +15.5%

Bid tab: unit prices 95 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Treas Construct…#2 L & N BRIDGE, L…#3 C3 Construction…#4 Wyatt Contracti…
10201(A)1200 CLEARING AND GRUBBING1LSUM $44,363.36 $76,500.00 $55,000.00 $50,921.47 $45,000.00
20202(A)2200 UNCLASSIFIED EXCAVATION20,558CY $10.00 $10.20 $9.00 $9.31 $9.00
30202(D)2500 UNCLASSIFIED BORROW24,903CY $12.00 $11.47 $9.00 $12.42 $12.50
40205(A)6200 TYPE A-SALVAGED TOPSOIL1LSUM $38,800.00 $25,500.00 $35,000.00 $43,469.55 $26,000.00
50221(B)2300 TEMPORARY SILT FENCE550LF $3.00 $2.19 $4.39 $5.45 $4.39
60221(E)2600 TEMPORARY SILT DIKE182LF $15.00 $18.36 $18.98 $23.57 $18.98
70232(B)9300 SEEDING METHOD B6AC $1,000.00 $2,034.90 $1,995.00 $2,477.77 $1,995.00
80233(A)0200 VEGETATIVE MULCHING6AC $1,750.00 $2,034.90 $1,995.00 $2,477.77 $1,995.00
90241 3100 MOWING10.5AC $600.00 $467.16 $458.00 $568.83 $458.00
100303(A)1200 AGGREGATE BASE TYPE A3,918CY $65.00 $59.16 $80.00 $48.49 $78.00
120326(A)1200 GEOTEXTILE REINFORCEMENT15,491SY $5.75 $2.55 $5.00 $1.32 $5.00
130402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E2,423TON $40.00 $32.64 $32.00 $22.38 $38.75
140407(B)7300 TACK COAT2,044GAL $2.75 $3.77 $3.70 $3.74 $3.70
150408 8100 PRIME COAT4,338GAL $3.50 $5.12 $5.02 $5.07 $5.02
160409(A)9200 FABRIC REINFORCEMENT267SY $2.50 $4.38 $4.30 $4.34 $4.30
170411(B)1330 SUPERPAVE, TYPE S3(PG 64-22 OK)3,304TON $140.00 $104.80 $102.75 $103.78 $102.75
180411(C)1430 SUPERPAVE, TYPE S4(PG 64-22 OK)1,361TON $150.00 $122.29 $119.90 $121.10 $119.80
190412 3100 COLD MILLING PAVEMENT687SY $9.00 $17.52 $17.18 $22.98 $16.86
200501(A)1200 STRUCTURAL EXCAVATION UNCLASSIFIED6CY $25.00 $102.00 $25.00 $43.47 $40.00
210509(A)0200 CLASS AA CONCRETE74CY $650.00 $499.80 $850.00 $892.74 $885.00
220509(D)0500 CLASS C CONCRETE109CY $400.00 $396.78 $425.00 $409.70 $415.00
230511(A)2200 REINFORCING STEEL10,256LB $1.50 $1.31 $1.50 $1.45 $1.50
240613(B)5516 24" CORR. GALV. STEEL PIPE100LF $75.00 $62.22 $55.00 $98.60 $78.00
250613(B)5524 30" CORR. GALV. STEEL PIPE50LF $92.00 $81.60 $55.00 $128.48 $95.00
260613(B)5532 42" CORR. GALV. STEEL PIPE32LF $77.00 $104.04 $75.00 $98.87 $121.00
270613(B)5604 21" X 15" CORR. GALV. STEEL PIPE ARCH36LF $75.00 $68.34 $45.00 $118.75 $68.00
280613(H)6210 8" PERFORATED PIPE UNDERDRAIN ROUND177LF $19.50 $20.40 $35.00 $16.77 $20.00
290613(I)6315 8" NON-PERF.PIPE UNDERDRAIN RND.59LF $25.00 $20.40 $28.00 $16.77 $25.00
300613(M)7004 TYPE A6 CULVERT END TREATMENT4EA $1,450.00 $1,938.00 $2,100.00 $2,842.26 $2,580.00
310613(M)7008 TYPE B6 CULVERT END TREATMENT4EA $1,700.00 $2,346.00 $2,200.00 $3,177.04 $3,333.00
320613(M)7012 TYPE C6 CULVERT END TREATMENT2EA $2,210.00 $2,856.00 $3,800.00 $3,394.59 $4,439.00
330619(A)6200 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $23,000.00 $15,300.00 $15,000.00 $17,387.82 $23,000.00
340619(B)6300 REMOVAL OF HEADWALL2EA $1,350.00 $3,060.00 $900.00 $931.49 $1,000.00
350619(B)6364 REMOVAL OF ASPHALT PAVEMENT8,853SY $8.00 $6.63 $5.75 $8.07 $9.94
360619(B)6396 REMOVAL OF GUARDRAIL705LF $5.00 $4.08 $4.00 $4.97 $8.50
370619(C)6600 SAWING PAVEMENT2,401LF $2.50 $2.80 $2.00 $3.10 $6.00
380623(A)1200 BEAM GUARDRAIL W-BEAM SINGLE788LF $30.00 $32.64 $32.00 $39.74 $25.00
390623(G)1820 GUARDRAIL END TREATMENT (31")4EA $3,500.00 $3,570.00 $3,500.00 $4,346.96 $3,500.00
400623(I)2050 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")4EA $2,900.00 $3,060.00 $3,000.00 $3,725.96 $3,500.00
410624(C)3405 FENCE-STYLE SWF (5 BARBED WIRE)790LF $10.00 $5.35 $10.00 $27.52 $30.00
420629(A)7200 MAILBOX INSTALLATION-SINGLE3EA $135.00 $255.00 $250.00 $310.50 $325.00
430629(C)7400 REMOVAL OF MAILBOX INSTALLATION3EA $45.00 $51.00 $50.00 $62.10 $65.00
440629(E)7600 MAILBOX3EA $50.00 $51.00 $50.00 $62.10 $45.00
450501(B)1300 SUBSTRUCTURE EXCAVATION COMMON170CY $25.00 $40.80 $15.00 $19.87 $25.00
460501(G)1800 CLSM BACKFILL178.4CY $200.00 $271.21 $220.00 $242.32 $225.00
470504(A)5200 APPROACH SLAB281SY $250.00 $249.63 $250.00 $255.47 $250.00
480504(B)5300 SAW-CUT GROOVING1,120.5SY $5.00 $6.32 $5.22 $6.46 $5.20
490504(D)5420 CONCRETE RAIL (TR4)573.8LF $100.00 $98.48 $105.00 $109.17 $110.00
500506(A)7225 STRUCTURAL STEEL M270 GRADE 50W314,070LB $3.00 $2.47 $2.40 $2.89 $3.25
510507(A)8200 STAINLESS STEEL FIXED BEARING ASSEMBLY10EA $2,250.00 $2,972.86 $3,000.00 $2,938.84 $2,500.00
520507(B)8300 STAINLESS STEEL EXP. BEARING ASSEMBLY20EA $2,250.00 $2,972.86 $3,000.00 $2,938.84 $2,500.00
530509(A)0210 CLASS AA CONCRETE251CY $650.00 $822.27 $850.00 $757.76 $850.00
540509(B)0320 CLASS A CONCRETE178.8CY $650.00 $822.27 $725.00 $886.75 $900.00
550509(D)0510 CLASS C CONCRETE6.1CY $400.00 $902.13 $1,500.00 $676.79 $750.00
560511(B)2310 EPOXY COATED REINFORCING STEEL95,820LB $1.75 $1.56 $1.75 $1.89 $1.95
570514(A)5210 PILES, FURNISHED (HP 10X42)96LF $35.00 $52.54 $48.00 $57.51 $55.00
580514(A)5220 PILES, FURNISHED (HP 12X53)294LF $45.00 $63.32 $61.00 $81.35 $75.00
590514(B)5310 PILES, DRIVEN (HP 10X42)96LF $18.00 $20.40 $20.60 $39.78 $16.00
600514(B)5320 PILES, DRIVEN (HP 12X53)294LF $20.00 $20.40 $26.25 $27.97 $20.00
610514(L)6300 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $500.00 $500.00 $500.00 $500.00 $500.00
620515(A)7200 WATER REPELLENT (VISUALLY INSPECTED)716SY $4.50 $4.59 $4.50 $5.59 $4.50
630516(A)8240 DRILLED SHAFTS 60" DIAMETER102LF $1,200.00 $1,325.10 $1,315.67 $1,582.52 $1,150.00
640516(C)8400 CROSSHOLE SONIC LOGGING4EA $3,000.00 $2,652.00 $1,600.00 $1,987.18 $2,000.00
650518(B)0300 SEALED EXPANSION JOINTS43.2LF $300.00 $362.62 $375.00 $378.50 $350.00
660523(A)3200 SEALER CRACK PREPARATION43LF $5.00 $10.20 $10.00 $12.42 $10.00
670523(B)3300 SEALER RESIN0.3GAL $200.00 $306.00 $300.00 $372.60 $300.00
680601(B)1230 TYPE I-A PLAIN RIPRAP450TON $60.00 $72.42 $50.00 $63.88 $80.00
690601(C)1310 TYPE I-A FILTER BLANKET80TON $50.00 $62.22 $35.00 $50.25 $60.00
700613(H)6205 6" PERFORATED PIPE UNDERDRAIN ROUND86LF $14.00 $40.80 $35.00 $13.14 $25.00
710613(I)6310 6" NON-PERF.PIPE UNDERDRAIN RND.42LF $14.00 $40.80 $35.00 $19.08 $25.00
720619(D)6700 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $130,000.00 $25,586.70 $20,000.00 $110,919.95 $125,000.00
730854(A)6200 TRAFFIC STRIPE(PAINT)(4" WIDE)13,042LF $0.2500 $0.2500 $0.2500 $0.3100 $0.3800
740857(C)9400 REMOVABLE PAVEMENT MARKING TAPE(4" WIDE)1,162LF $1.50 $0.2000 $0.2000 $0.2500 $3.50
750857(F)9700 PAVEMENT MRKNG.REMOVAL(TRAF.STRP)4,680LF $0.7500 $0.5100 $0.5000 $0.6200 $1.50
760858(A)0224 PAVE.MARKERS CLASS A TYPE 2-C665EA $5.50 $4.08 $4.00 $4.97 $7.75
770858(A)0228 PAVE.MARKERS CLASS A TYPE 2-D662EA $5.50 $4.08 $4.00 $4.97 $7.75
780880(B)6300 CONSTRUCTION SIGNS 0 TO 6.25 SF3,780SD $0.5000 $0.7600 $0.7500 $0.9300 $0.0200
790880(B)6310 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF4,140SD $1.00 $0.7600 $0.7500 $0.9300 $0.0200
800880(B)6320 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF5,400SD $1.50 $0.5100 $0.5000 $0.6200 $0.0200
810880(C)6410 CONSTRUCTION BARRICADES(TYPE III)3,420SD $0.7500 $0.5100 $0.5000 $0.6200 $0.0500
820880(E)6600 WARNING LIGHTS(TYPE A)3,960SD $0.5000 $1.02 $1.00 $1.24 $2.00
830880(F)6700 DRUMS7,200SD $0.2500 $0.3100 $0.3100 $0.3900 $0.0200
840880(G)6805 CHANNELIZER CONES16,380SD $0.2500 $0.2000 $0.2000 $0.2500 $0.7500
850880(I)7000 FLAGGER30SD $150.00 $127.50 $155.00 $248.40 $350.00
860413(A)4200 RUMBLE STRIP-METHOD HMA-CON3,264LF $0.5000 $0.4000 $0.9000 $0.5000 $0.8800
870413(A)4210 RUMBLE STRIP-CENTERLINE HMA-CON5,440LF $0.2500 $0.4000 $0.9000 $0.5000 $1.10
880805(A)3252 (PL)REMOVAL OF EXISTING SIGNS13EA $95.00 $51.00 $50.00 $62.10 $85.00
890850(A)1200 SHEET ALUMINUM SIGNS31SF $55.50 $35.70 $35.00 $43.47 $75.00
900850(D)1500 SPECIAL SIGNS14SF $75.00 $35.70 $35.00 $43.47 $35.00
910851(C)2415 2" SQUARE TUBE POST28.5LF $13.00 $15.30 $15.00 $18.63 $7.00
920851(C)2430 2 1/2" SQUARE TUBE POST124.5LF $15.00 $15.30 $15.00 $18.63 $9.00
930856(A)8204 TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE)13,460LF $0.6000 $0.9100 $0.9000 $1.12 $1.46
940642(B)3300 CONSTRUCTION STAKING LEVEL II1LSUM $50,000.00 $27,203.40 $25,000.00 $37,383.81 $21,000.00
950220 1100 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $3,060.00 $3,000.00 $3,104.97 $5,000.00
960641 2100 MOBILIZATION1LSUM $215,000.00 $190,908.23 $220,000.00 $364,615.45 $215,000.00