| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$20,000.00 |
$17,500.00 |
$12,000.00 |
$10,500.00 |
$15,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 1,930 | CY |
$15.00 |
$14.50 |
$7.50 |
$7.00 |
$5.51 |
$15.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 14,375 | CY |
$15.00 |
$14.00 |
$8.45 |
$7.00 |
$12.60 |
$23.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,000.00 |
$12,000.00 |
$9,100.00 |
$6,500.00 |
$7,875.00 |
$20,000.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 2,300 | LF |
$3.50 |
$2.25 |
$2.50 |
$3.00 |
$2.36 |
$5.00 |
| 60 | 221(F)2700 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 39 | CY |
$120.00 |
$75.00 |
$70.00 |
$300.00 |
$157.50 |
$50.00 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 7,700 | SY |
$4.00 |
$4.95 |
$5.40 |
$3.00 |
$5.20 |
$7.00 |
| 80 | 303(A)1200 |
AGGREGATE BASE TYPE A | 665 | CY |
$65.00 |
$49.00 |
$51.70 |
$45.00 |
$47.25 |
$42.00 |
| 90 | 310(B)5300 |
SUBGRADE, METHOD B | 3,523 | SY |
$3.00 |
$4.00 |
$6.50 |
$1.00 |
$3.15 |
$2.00 |
| 100 | 325 0100 |
SEPARATOR FABRIC | 3,923 | SY |
$2.50 |
$3.00 |
$2.60 |
$1.50 |
$1.58 |
$1.20 |
| 110 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 199 | TON |
$45.00 |
$40.00 |
$27.50 |
$30.00 |
$31.50 |
$40.00 |
| 120 | 407(B)7300 |
TACK COAT | 369 | GAL |
$3.00 |
$5.00 |
$4.50 |
$2.00 |
$2.10 |
$3.00 |
| 130 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,040 | TON |
$95.00 |
$81.40 |
$75.60 |
$75.00 |
$78.75 |
$85.00 |
| 140 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 386 | TON |
$120.00 |
$104.94 |
$100.70 |
$85.00 |
$89.25 |
$110.00 |
| 150 | 509(D)0500 |
CLASS C CONCRETE | 10 | CY |
$500.00 |
$275.00 |
$300.00 |
$500.00 |
$630.00 |
$1,200.00 |
| 160 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$17,500.00 |
$12,500.00 |
$4,500.00 |
$1,439.80 |
$4,200.00 |
$15,000.00 |
| 170 | 619(B)6352 |
REMOVAL OF FENCE | 200 | LF |
$2.00 |
$10.00 |
$6.00 |
$3.00 |
$3.15 |
$10.00 |
| 180 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 2,077 | SY |
$5.00 |
$7.00 |
$8.20 |
$5.00 |
$4.99 |
$10.00 |
| 190 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 870 | LF |
$4.50 |
$3.00 |
$4.00 |
$3.00 |
$3.15 |
$10.00 |
| 200 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 225 | LF |
$25.00 |
$30.00 |
$34.00 |
$27.00 |
$31.50 |
$65.00 |
| 210 | 623(G)1800 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$3,000.00 |
$2,650.00 |
$2,950.00 |
$2,500.00 |
$2,782.50 |
$5,000.00 |
| 220 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,500.00 |
$2,500.00 |
$3,000.00 |
$2,000.00 |
$2,625.00 |
$5,000.00 |
| 230 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 45 | CY |
$30.00 |
$10.00 |
$25.00 |
$15.00 |
$31.50 |
$50.00 |
| 240 | 501(G)1800 |
CLSM BACKFILL | 100 | CY |
$200.00 |
$250.00 |
$168.50 |
$80.00 |
$217.23 |
$250.00 |
| 250 | 503(A)4240 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 1,197 | LF |
$275.00 |
$250.00 |
$258.73 |
$235.00 |
$274.43 |
$265.00 |
| 260 | 504(A)5200 |
APPROACH SLAB | 224.8 | SY |
$250.00 |
$220.00 |
$278.04 |
$215.00 |
$233.43 |
$100.00 |
| 270 | 504(B)5300 |
SAW-CUT GROOVING | 1,557.8 | SY |
$5.00 |
$8.00 |
$5.00 |
$4.00 |
$5.67 |
$20.00 |
| 280 | 504(D)5400 |
CONCRETE RAIL (TR1) | 697 | LF |
$90.00 |
$45.00 |
$79.00 |
$95.00 |
$91.27 |
$80.00 |
| 290 | 506(A)7205 |
STRUCTURAL STEEL M270 GR. HPS 50W | 1,050 | LB |
$2.50 |
$10.00 |
$3.65 |
$5.00 |
$3.75 |
$5.00 |
| 300 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$1,400.00 |
$600.00 |
$650.00 |
$500.00 |
$872.47 |
$1,305.00 |
| 310 | 507(B)8300 |
STAINLESS STEEL EXP. BEARING ASSEMBLY | 16 | EA |
$2,000.00 |
$500.00 |
$2,355.00 |
$2,500.00 |
$2,524.38 |
$1,430.00 |
| 320 | 507(C)8400 |
ELASTOMERIC BEARING PADS | 16 | EA |
$200.00 |
$500.00 |
$600.00 |
$400.00 |
$221.39 |
$2,500.00 |
| 330 | 509(A)0210 |
CLASS AA CONCRETE | 385.9 | CY |
$700.00 |
$500.00 |
$625.00 |
$900.00 |
$813.96 |
$650.00 |
| 340 | 509(B)0320 |
CLASS A CONCRETE | 111.7 | CY |
$600.00 |
$500.00 |
$650.00 |
$900.00 |
$813.96 |
$620.00 |
| 350 | 509(D)0510 |
CLASS C CONCRETE | 8.5 | CY |
$400.00 |
$250.00 |
$300.00 |
$500.00 |
$735.00 |
$620.00 |
| 360 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 104,820 | LB |
$1.50 |
$1.93 |
$1.36 |
$1.25 |
$1.54 |
$0.9500 |
| 370 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 620 | LF |
$50.00 |
$45.00 |
$44.55 |
$55.00 |
$46.26 |
$120.00 |
| 380 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 620 | LF |
$20.00 |
$8.00 |
$14.00 |
$10.00 |
$15.75 |
$50.00 |
| 390 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 400 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,283 | SY |
$4.50 |
$5.00 |
$4.50 |
$4.00 |
$4.20 |
$10.00 |
| 410 | 516(A)8240 |
DRILLED SHAFTS 60" DIAMETER | 244 | LF |
$1,000.00 |
$750.00 |
$1,041.30 |
$890.00 |
$813.69 |
$980.00 |
| 420 | 516(C)8400 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$2,200.00 |
$8,000.00 |
$2,800.00 |
$4,500.00 |
$2,730.00 |
$3,250.00 |
| 430 | 523(A)3200 |
SEALER CRACK PREPARATION | 169 | LF |
$4.00 |
$5.00 |
$6.70 |
$5.50 |
$5.25 |
$30.00 |
| 440 | 523(B)3300 |
SEALER RESIN | 2 | GAL |
$100.00 |
$150.00 |
$270.00 |
$220.00 |
$210.00 |
$650.00 |
| 450 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 1,910 | TON |
$45.00 |
$44.00 |
$44.00 |
$35.00 |
$46.31 |
$50.00 |
| 460 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 365 | TON |
$40.00 |
$27.74 |
$39.00 |
$20.00 |
$34.43 |
$50.00 |
| 470 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 42 | LF |
$20.00 |
$65.00 |
$25.00 |
$10.00 |
$31.50 |
$30.00 |
| 480 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 20 | LF |
$15.00 |
$65.00 |
$25.00 |
$10.00 |
$31.50 |
$30.00 |
| 490 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$40,000.00 |
$30,000.00 |
$85,000.00 |
$167,000.00 |
$32,189.06 |
$65,000.00 |
| 500 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 17 | SF |
$23.00 |
$35.00 |
$38.00 |
$30.00 |
$36.75 |
$40.00 |
| 510 | 851(C)2420 |
2 1/4" SQUARE TUBE POST | 25 | LF |
$10.00 |
$15.00 |
$16.00 |
$10.00 |
$15.75 |
$18.00 |
| 520 | 853 5115 |
DELINEATORS(TYPE 2, CODE 1) | 10 | EA |
$20.00 |
$30.00 |
$35.00 |
$25.00 |
$31.50 |
$50.00 |
| 530 | 856(A)8200 |
TRAFFIC STRIPE(MULTI-POLY.)(4" WIDE) | 4,200 | LF |
$1.25 |
$1.75 |
$1.79 |
$1.50 |
$1.84 |
$2.00 |
| 540 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,440 | SD |
$1.75 |
$1.00 |
$1.06 |
$1.00 |
$1.05 |
$1.30 |
| 550 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 360 | SD |
$2.15 |
$2.00 |
$2.15 |
$1.00 |
$2.10 |
$2.30 |
| 560 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 1,440 | SD |
$1.25 |
$1.00 |
$1.05 |
$1.00 |
$1.05 |
$1.30 |
| 570 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 3,240 | SD |
$0.4500 |
$0.2500 |
$0.2900 |
$0.2500 |
$0.2600 |
$0.5000 |
| 580 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 28 | SD |
$37.00 |
$25.00 |
$30.00 |
$25.00 |
$26.25 |
$30.00 |
| 590 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$25,000.00 |
$6,500.00 |
$8,000.00 |
$15,000.00 |
$8,190.00 |
$15,000.00 |
| 600 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,000.00 |
$1,000.00 |
$3,000.00 |
$5,000.00 |
$2,625.00 |
$20,000.00 |
| 610 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$133,000.00 |
$80,000.00 |
$130,000.00 |
$125,000.00 |
$119,115.23 |
$120,000.00 |