| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$27,650.00 |
$50,000.00 |
$62,709.15 |
$72,810.50 |
$22,500.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 23,212 | CY |
$8.00 |
$13.00 |
$7.46 |
$14.50 |
$8.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 25,429 | CY |
$8.00 |
$14.00 |
$12.89 |
$14.50 |
$16.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$31,147.00 |
$20,000.00 |
$60,364.50 |
$15,000.00 |
$20,000.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 8,837 | LF |
$3.00 |
$2.05 |
$2.09 |
$2.00 |
$1.99 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 231 | LF |
$15.00 |
$9.25 |
$9.40 |
$10.00 |
$8.95 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 22,426 | SY |
$3.00 |
$2.35 |
$2.35 |
$2.25 |
$2.24 |
| 80 | 232(B)9300 |
SEEDING METHOD B | 4.64 | AC |
$1,500.00 |
$1,025.00 |
$1,044.75 |
$1,000.00 |
$995.00 |
| 90 | 233(A)0200 |
VEGETATIVE MULCHING | 27.84 | AC |
$700.00 |
$820.00 |
$834.75 |
$800.00 |
$795.00 |
| 100 | 241 3100 |
MOWING | 15.8 | AC |
$200.00 |
$308.00 |
$313.95 |
$300.00 |
$299.00 |
| 110 | 303(A)1200 |
AGGREGATE BASE TYPE A | 3,453 | CY |
$60.00 |
$50.00 |
$44.68 |
$50.00 |
$55.00 |
| 120 | 307(K)4200 |
STABILIZED SUBGRADE | 17,304 | SY |
$8.00 |
$10.50 |
$8.51 |
$7.00 |
$12.00 |
| 130 | 326(A)1200 |
GEOTEXTILE REINFORCEMENT | 18,018 | SY |
$5.00 |
$4.70 |
$6.34 |
$6.00 |
$5.90 |
| 140 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,636 | TON |
$25.00 |
$27.50 |
$23.12 |
$19.00 |
$35.00 |
| 150 | 407(B)7300 |
TACK COAT | 1,968 | GAL |
$4.00 |
$5.20 |
$3.15 |
$3.00 |
$5.05 |
| 160 | 408 8100 |
PRIME COAT | 3,743 | GAL |
$5.00 |
$4.60 |
$2.10 |
$1.00 |
$4.40 |
| 170 | 411(B)1300 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 469 | TON |
$90.00 |
$90.00 |
$78.75 |
$75.00 |
$87.20 |
| 180 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 3,522 | TON |
$85.00 |
$72.00 |
$78.75 |
$75.00 |
$69.75 |
| 190 | 411(C)1400 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 309 | TON |
$105.00 |
$99.00 |
$1,039.50 |
$90.00 |
$96.30 |
| 200 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,381 | TON |
$95.00 |
$76.50 |
$94.50 |
$90.00 |
$74.10 |
| 210 | 610(B)5310 |
6" CONCRETE DRIVEWAY | 588 | SY |
$70.00 |
$48.00 |
$80.27 |
$80.00 |
$85.00 |
| 220 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 198 | LF |
$50.00 |
$60.00 |
$42.48 |
$85.00 |
$50.00 |
| 230 | 613(B)5544 |
60" CORR. GALV. STEEL PIPE | 164 | LF |
$150.00 |
$215.00 |
$186.53 |
$175.00 |
$200.00 |
| 240 | 613(B)5604 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 42 | LF |
$40.00 |
$70.00 |
$44.10 |
$120.00 |
$110.00 |
| 250 | 613(L)6708 |
18" PREFAB. CULVERT END SEC., ROUND | 4 | EA |
$450.00 |
$510.00 |
$286.65 |
$500.00 |
$450.00 |
| 260 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$17,314.50 |
$23,000.00 |
$15,000.00 |
| 270 | 619(B)6352 |
REMOVAL OF FENCE | 3,026 | LF |
$2.50 |
$2.50 |
$2.10 |
$3.00 |
$5.00 |
| 280 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 10,511 | SY |
$5.00 |
$4.70 |
$5.25 |
$5.00 |
$10.00 |
| 290 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 106 | LF |
$4.00 |
$3.50 |
$3.15 |
$5.00 |
$10.00 |
| 300 | 619(C)6600 |
SAWING PAVEMENT | 2,112 | LF |
$5.00 |
$5.70 |
$5.25 |
$3.00 |
$10.00 |
| 310 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 637.5 | LF |
$20.00 |
$31.00 |
$33.60 |
$30.00 |
$25.00 |
| 320 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,750.00 |
$3,610.00 |
$3,150.00 |
$3,300.00 |
$3,000.00 |
| 330 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,900.00 |
$2,840.00 |
$2,782.50 |
$3,000.00 |
$2,800.00 |
| 340 | 624(A)3200 |
FENCE-STYLE WWF | 92 | LF |
$13.00 |
$9.50 |
$9.66 |
$15.00 |
$11.50 |
| 350 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 2,270 | LF |
$7.00 |
$8.65 |
$8.82 |
$9.00 |
$10.15 |
| 360 | 624(C)3410 |
FENCE-STYLE SWF (6 BARBED WIRE) | 567 | LF |
$6.00 |
$9.10 |
$9.24 |
$10.00 |
$10.90 |
| 370 | 629(D)7500 |
REMOVE AND RESET MAILBOX | 1 | EA |
$250.00 |
$105.00 |
$52.50 |
$100.00 |
$50.00 |
| 380 | 853 5175 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 20 | EA |
$20.00 |
$26.00 |
$24.15 |
$30.00 |
$30.00 |
| 390 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 4,769 | CY |
$15.00 |
$13.00 |
$7.45 |
$30.00 |
$20.00 |
| 400 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 314 | CY |
$25.00 |
$35.00 |
$36.75 |
$30.00 |
$85.00 |
| 410 | 502 3100 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$20,000.00 |
$55,000.00 |
$5,250.00 |
$15,000.00 |
$15,000.00 |
| 420 | 509(A)0210 |
CLASS AA CONCRETE | 912.88 | CY |
$800.00 |
$600.00 |
$693.21 |
$500.00 |
$720.00 |
| 430 | 511(A)2210 |
REINFORCING STEEL | 146,854.97 | LB |
$1.20 |
$1.10 |
$1.45 |
$2.00 |
$1.23 |
| 440 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$30,000.00 |
$30,000.00 |
$23,100.00 |
$76,437.56 |
$35,000.00 |
| 450 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 100 | CY |
$25.00 |
$35.00 |
$31.50 |
$30.00 |
$25.00 |
| 460 | 501(G)1800 |
CLSM BACKFILL | 208.2 | CY |
$250.00 |
$180.00 |
$105.00 |
$130.00 |
$250.00 |
| 470 | 503(A)4240 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 373.34 | LF |
$400.00 |
$275.00 |
$250.93 |
$300.00 |
$400.00 |
| 480 | 504(A)5200 |
APPROACH SLAB | 248 | SY |
$325.00 |
$230.00 |
$304.54 |
$225.00 |
$325.00 |
| 490 | 504(B)5300 |
SAW-CUT GROOVING | 606 | SY |
$5.00 |
$5.35 |
$6.51 |
$5.00 |
$5.20 |
| 500 | 504(D)5420 |
CONCRETE RAIL (TR4) | 247 | LF |
$100.00 |
$110.00 |
$101.31 |
$135.00 |
$125.00 |
| 510 | 506(A)7200 |
STRUCTURAL STEEL | 180 | LB |
$10.00 |
$3.50 |
$2.76 |
$15.00 |
$10.00 |
| 520 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$1,000.00 |
$1,300.00 |
$866.78 |
$1,500.00 |
$600.00 |
| 530 | 509(A)0210 |
CLASS AA CONCRETE | 139.9 | CY |
$800.00 |
$900.00 |
$871.71 |
$750.00 |
$800.00 |
| 540 | 509(B)0320 |
CLASS A CONCRETE | 63.9 | CY |
$800.00 |
$1,300.00 |
$871.71 |
$700.00 |
$800.00 |
| 550 | 509(D)0510 |
CLASS C CONCRETE | 10.2 | CY |
$800.00 |
$760.00 |
$561.75 |
$500.00 |
$750.00 |
| 560 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 40,770 | LB |
$1.50 |
$1.35 |
$1.54 |
$2.00 |
$1.50 |
| 570 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 249 | LF |
$45.00 |
$65.00 |
$51.27 |
$80.00 |
$30.00 |
| 580 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 249 | LF |
$20.00 |
$40.00 |
$21.00 |
$10.00 |
$15.00 |
| 590 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 600 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 377 | SY |
$5.00 |
$4.10 |
$4.20 |
$5.00 |
$4.00 |
| 610 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 1,159 | TON |
$60.00 |
$31.00 |
$39.18 |
$45.00 |
$45.00 |
| 620 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 241 | TON |
$60.00 |
$30.00 |
$30.73 |
$45.00 |
$40.00 |
| 630 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 92 | LF |
$35.00 |
$30.00 |
$31.50 |
$10.00 |
$60.00 |
| 640 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 64 | LF |
$30.00 |
$30.00 |
$31.50 |
$10.00 |
$50.00 |
| 650 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$50,000.00 |
$35,000.00 |
$42,000.00 |
$97,000.00 |
$50,000.00 |
| 660 | 857(A)9200 |
CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) | 7,220 | LF |
$0.2000 |
$0.3600 |
$0.1900 |
$0.2000 |
$0.1800 |
| 670 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 3,200 | LF |
$0.3000 |
$0.5200 |
$0.1600 |
$0.1500 |
$0.1500 |
| 680 | 858(A)0216 |
PAVE.MARKERS CLASS A TYPE 2-A | 450 | EA |
$6.75 |
$4.10 |
$2.10 |
$3.00 |
$2.00 |
| 690 | 858(A)0228 |
PAVE.MARKERS CLASS A TYPE 2-D | 450 | EA |
$4.75 |
$4.10 |
$2.10 |
$3.00 |
$2.00 |
| 700 | 876(A)3210 |
(PL)TRUCK MOUNTED ATTENUATOR | 100 | SD |
$19.50 |
$25.75 |
$26.25 |
$30.00 |
$25.00 |
| 710 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 4,500 | SD |
$0.4000 |
$0.5200 |
$0.1100 |
$0.1000 |
$0.1000 |
| 720 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 5,780 | SD |
$0.7000 |
$0.7700 |
$0.3600 |
$0.4000 |
$0.3500 |
| 730 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 6,140 | SD |
$1.50 |
$2.05 |
$2.10 |
$2.00 |
$2.00 |
| 740 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 2,700 | SD |
$0.8000 |
$1.03 |
$2.10 |
$2.25 |
$2.00 |
| 750 | 880(D)6500 |
VERTICAL PANELS | 5,400 | SD |
$0.1500 |
$0.2600 |
$0.2600 |
$0.3500 |
$0.2500 |
| 770 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 17,100 | SD |
$0.3500 |
$0.2600 |
$0.0200 |
$0.0500 |
$0.0200 |
| 780 | 880(E)6610 |
WARNING LIGHTS(TYPE C) | 19,980 | SD |
$0.1000 |
$0.2600 |
$0.0200 |
$0.0500 |
$0.0200 |
| 790 | 880(F)6700 |
DRUMS | 7,380 | SD |
$0.2000 |
$0.2600 |
$0.3100 |
$0.4000 |
$0.3000 |
| 800 | 880(G)6805 |
CHANNELIZER CONES | 14,580 | SD |
$0.4500 |
$0.2600 |
$0.3100 |
$0.4000 |
$0.3000 |
| 810 | 880(I)7000 |
FLAGGER | 30 | SD |
$175.00 |
$1,080.00 |
$105.00 |
$200.00 |
$625.00 |
| 820 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 776 | SD |
$11.50 |
$15.50 |
$15.75 |
$20.00 |
$15.00 |
| 830 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 18.75 | SF |
$23.00 |
$25.75 |
$15.75 |
$16.00 |
$15.00 |
| 840 | 851(C)2415 |
2" SQUARE TUBE POST | 56 | LF |
$10.00 |
$14.42 |
$5.25 |
$10.00 |
$5.00 |
| 850 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 9,900 | LF |
$0.6500 |
$0.8800 |
$0.6800 |
$0.7500 |
$0.6500 |
| 860 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$62,000.00 |
$25,000.00 |
$26,250.00 |
$35,000.00 |
$14,500.00 |
| 870 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$10,000.00 |
$2,625.00 |
$7,500.00 |
$7,500.00 |
| 880 | 640(A)1200 |
FIELD OFFICE | 1 | EA |
$20,000.00 |
$11,000.00 |
$2,500.00 |
$5,000.00 |
$12,500.00 |
| 890 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$230,000.00 |
$206,800.00 |
$227,946.29 |
$227,000.00 |
$192,550.00 |