| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$8,000.00 |
$10,000.00 |
$20,000.00 |
$12,500.00 |
$35,000.00 |
$25,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 1,615 | CY |
$11.00 |
$15.00 |
$17.85 |
$20.00 |
$15.00 |
$15.00 |
| 30 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$8,000.00 |
$5,000.00 |
$5,000.00 |
$7,500.00 |
$8,500.00 |
$8,500.00 |
| 40 | 221(B)2300 |
TEMPORARY SILT FENCE | 1,446 | LF |
$3.00 |
$2.10 |
$1.60 |
$1.99 |
$2.00 |
$1.99 |
| 50 | 221(E)2600 |
TEMPORARY SILT DIKE | 259 | LF |
$10.00 |
$15.00 |
$7.25 |
$18.50 |
$19.00 |
$18.50 |
| 60 | 221(G)2800 |
TEMPORARY FIBER LOG | 80 | LF |
$20.00 |
$15.00 |
$5.25 |
$12.50 |
$15.00 |
$12.50 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 5,846 | SY |
$4.00 |
$3.00 |
$6.25 |
$4.95 |
$5.00 |
$5.25 |
| 80 | 233(A)0200 |
VEGETATIVE MULCHING | 1.57 | AC |
$1,000.00 |
$750.00 |
$1,700.00 |
$1,495.00 |
$1,000.00 |
$1,495.00 |
| 90 | 303(A)1200 |
AGGREGATE BASE TYPE A | 564 | CY |
$60.00 |
$55.00 |
$61.00 |
$57.46 |
$55.00 |
$55.00 |
| 100 | 325 0100 |
SEPARATOR FABRIC | 1,474 | SY |
$3.00 |
$6.50 |
$4.00 |
$3.50 |
$2.00 |
$2.00 |
| 110 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 160 | TON |
$40.00 |
$38.00 |
$34.00 |
$40.00 |
$25.00 |
$25.00 |
| 120 | 409(A)9200 |
FABRIC REINFORCEMENT | 1,454 | SY |
$5.00 |
$6.50 |
$5.00 |
$7.00 |
$2.00 |
$9.30 |
| 130 | 411(B)1320 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 204 | TON |
$110.00 |
$112.75 |
$135.00 |
$112.65 |
$82.00 |
$120.00 |
| 140 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 988 | TON |
$90.00 |
$95.00 |
$105.00 |
$101.75 |
$77.00 |
$104.00 |
| 150 | 411(C)1420 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 381 | TON |
$115.00 |
$125.00 |
$130.00 |
$123.35 |
$100.00 |
$131.00 |
| 160 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 245 | TON |
$110.00 |
$119.00 |
$131.00 |
$118.00 |
$96.00 |
$128.00 |
| 170 | 412 3100 |
COLD MILLING PAVEMENT | 1,454 | SY |
$7.00 |
$7.20 |
$10.00 |
$7.00 |
$5.00 |
$9.00 |
| 180 | 509(D)0500 |
CLASS C CONCRETE | 10 | CY |
$375.00 |
$250.00 |
$685.00 |
$300.00 |
$400.00 |
$300.00 |
| 190 | 609(B)4330 |
1'-8" COMB.CRB.& GUT.(6" BARRIER) | 150 | LF |
$35.00 |
$40.00 |
$29.00 |
$50.00 |
$50.00 |
$35.00 |
| 200 | 610(A)5210 |
5" CONCRETE SIDEWALK | 100 | SY |
$100.00 |
$75.00 |
$53.00 |
$50.00 |
$80.00 |
$70.00 |
| 210 | 611(G)0350 |
INLET (SMD-TYPE 1) | 2 | EA |
$3,100.00 |
$3,500.00 |
$3,600.00 |
$3,000.00 |
$4,500.00 |
$4,500.00 |
| 220 | 612(A)3200 |
MANHOLES ADJUST TO GRADE | 2 | EA |
$720.00 |
$1,500.00 |
$1,150.00 |
$2,500.00 |
$2,200.00 |
$700.00 |
| 230 | 613(A)5208 |
18" R.C.PIPE CLASS III | 57 | LF |
$55.00 |
$55.00 |
$64.00 |
$100.00 |
$100.00 |
$85.00 |
| 240 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 97 | LF |
$50.00 |
$50.00 |
$71.50 |
$73.62 |
$70.00 |
$75.00 |
| 250 | 613(B)5604 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 261 | LF |
$35.00 |
$55.00 |
$72.00 |
$63.62 |
$75.00 |
$75.00 |
| 260 | 613(M)6960 |
TYPE A4 CULVERT END TREATMENT | 13 | EA |
$1,200.00 |
$1,000.00 |
$1,750.00 |
$2,500.00 |
$800.00 |
$1,400.00 |
| 270 | 613(T)7800 |
STANDARD BEDDING MATERIAL, CLASS C | 16 | CY |
$40.00 |
$40.00 |
$40.00 |
$80.00 |
$25.00 |
$75.00 |
| 280 | 613(V)8000 |
TRENCH EXCAVATION | 27 | CY |
$30.00 |
$30.00 |
$20.00 |
$20.00 |
$20.00 |
$25.00 |
| 290 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$8,000.00 |
$8,000.00 |
$5,700.00 |
$7,500.00 |
$5,000.00 |
$6,000.00 |
| 300 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 2,361 | SY |
$6.00 |
$10.00 |
$8.75 |
$4.75 |
$7.00 |
$8.00 |
| 310 | 624(A)3200 |
FENCE-STYLE WWF | 44 | LF |
$8.00 |
$11.00 |
$28.50 |
$25.00 |
$25.00 |
$105.00 |
| 320 | 629(A)7200 |
MAILBOX INSTALLATION-SINGLE | 3 | EA |
$120.00 |
$50.00 |
$170.00 |
$240.00 |
$200.00 |
$150.00 |
| 330 | 629(C)7400 |
REMOVAL OF MAILBOX INSTALLATION | 3 | EA |
$30.00 |
$50.00 |
$28.50 |
$45.00 |
$30.00 |
$25.00 |
| 340 | 629(E)7600 |
MAILBOX | 3 | EA |
$50.00 |
$50.00 |
$55.00 |
$35.00 |
$100.00 |
$50.00 |
| 350 | 303(A)1200 |
AGGREGATE BASE TYPE A | 58 | CY |
$80.00 |
$60.00 |
$41.00 |
$60.00 |
$50.00 |
$80.00 |
| 360 | 509(B)0300 |
CLASS A CONCRETE | 13 | CY |
$700.00 |
$450.00 |
$340.00 |
$300.00 |
$360.00 |
$1,100.00 |
| 370 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 12 | TON |
$50.00 |
$50.00 |
$93.00 |
$80.00 |
$70.00 |
$50.00 |
| 380 | 611(A)7210 |
MANHOLE (4' DIA.) | 2 | EA |
$2,800.00 |
$3,200.00 |
$3,925.00 |
$3,000.00 |
$4,500.00 |
$3,500.00 |
| 390 | 613(T)7800 |
STANDARD BEDDING MATERIAL, CLASS C | 120 | CY |
$50.00 |
$50.00 |
$61.00 |
$60.00 |
$30.00 |
$100.00 |
| 400 | 613(V)8000 |
TRENCH EXCAVATION | 466 | CY |
$30.00 |
$30.00 |
$20.00 |
$15.00 |
$15.00 |
$21.00 |
| 410 | 616(B)2336 |
6" POLYVINYL CHLORIDE (PVC) PIPE | 1,125 | LF |
$35.00 |
$35.00 |
$45.00 |
$195.00 |
$70.00 |
$61.00 |
| 420 | 616(D)2646 |
6" GATE VALVE | 5 | EA |
$1,500.00 |
$1,400.00 |
$1,075.00 |
$900.00 |
$1,500.00 |
$1,400.00 |
| 430 | 616(D)2800 |
STANDARD VALVE BOX | 3 | EA |
$220.00 |
$300.00 |
$225.00 |
$120.00 |
$300.00 |
$240.00 |
| 440 | 616(D)2804 |
VALVE BOX EXTENSION | 2 | EA |
$150.00 |
$220.00 |
$80.00 |
$100.00 |
$100.00 |
$140.00 |
| 450 | 616(F)3030 |
METER INSTALLATION 3/4" | 7 | EA |
$300.00 |
$450.00 |
$180.00 |
$1,000.00 |
$550.00 |
$1,200.00 |
| 460 | 616(G)3110 |
FIRE HYDRANT AND ASSEMBLY | 1 | LSUM |
$5,500.00 |
$6,600.00 |
$4,945.00 |
$3,000.00 |
$6,500.00 |
$5,500.00 |
| 470 | 616(I)3327 |
18" STEEL CASING | 122 | LF |
$70.00 |
$165.00 |
$170.00 |
$110.00 |
$130.00 |
$190.00 |
| 480 | 616(N)3800 |
SERVICE CONNECTION (SHORT) | 6 | EA |
$1,300.00 |
$1,500.00 |
$975.00 |
$1,300.00 |
$1,000.00 |
$800.00 |
| 490 | 616(N)3805 |
SERVICE CONNECTION (LONG) | 1 | EA |
$2,000.00 |
$7,500.00 |
$1,765.00 |
$1,800.00 |
$2,000.00 |
$1,400.00 |
| 500 | 616(O)3905 |
FITTINGS | 3 | EA |
$5,500.00 |
$2,000.00 |
$2,700.00 |
$380.00 |
$1,500.00 |
$2,000.00 |
| 510 | 616(O)3975 |
6" 11 1/4 DEGREE FITTING | 6 | EA |
$520.00 |
$550.00 |
$570.00 |
$380.00 |
$300.00 |
$800.00 |
| 520 | 616(O)3985 |
6" 45 DEGREE FITTING | 17 | EA |
$520.00 |
$650.00 |
$569.00 |
$380.00 |
$300.00 |
$800.00 |
| 530 | 616(R)4324 |
6" X 4" REDUCER | 2 | EA |
$300.00 |
$500.00 |
$370.00 |
$380.00 |
$300.00 |
$800.00 |
| 540 | 616(T)4535 |
6" X 6" X 6" TEE | 2 | EA |
$700.00 |
$1,000.00 |
$825.00 |
$450.00 |
$600.00 |
$1,000.00 |
| 550 | 303(A)1200 |
AGGREGATE BASE TYPE A | 44 | CY |
$80.00 |
$65.00 |
$40.00 |
$60.00 |
$50.00 |
$85.00 |
| 560 | 501(G)1800 |
CLSM BACKFILL | 5 | CY |
$350.00 |
$200.00 |
$170.00 |
$150.00 |
$130.00 |
$200.00 |
| 570 | 509(B)0300 |
CLASS A CONCRETE | 10.4 | CY |
$700.00 |
$450.00 |
$425.00 |
$500.00 |
$800.00 |
$1,100.00 |
| 580 | 511(A)2200 |
REINFORCING STEEL | 94 | LB |
$2.00 |
$1.00 |
$3.25 |
$2.00 |
$2.00 |
$7.00 |
| 590 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 12 | TON |
$50.00 |
$50.00 |
$94.00 |
$80.00 |
$70.00 |
$55.00 |
| 600 | 611(A)7210 |
MANHOLE (4' DIA.) | 4 | EA |
$2,400.00 |
$3,500.00 |
$4,800.00 |
$4,000.00 |
$6,000.00 |
$5,500.00 |
| 610 | 611(B)7300 |
ADD'L.DEPTH IN MANHOLE (4' DIA.) | 16 | VF |
$450.00 |
$750.00 |
$75.00 |
$400.00 |
$350.00 |
$300.00 |
| 620 | 612(B)3310 |
CONNECT TO EXISTING MANHOLE | 1 | EA |
$1,300.00 |
$2,000.00 |
$20,000.00 |
$1,500.00 |
$5,000.00 |
$3,300.00 |
| 630 | 613(T)7800 |
STANDARD BEDDING MATERIAL, CLASS C | 101 | CY |
$50.00 |
$50.00 |
$52.00 |
$60.00 |
$30.00 |
$100.00 |
| 640 | 613(V)8000 |
TRENCH EXCAVATION | 354 | CY |
$30.00 |
$30.00 |
$26.00 |
$30.00 |
$15.00 |
$20.00 |
| 650 | 615(A)1232 |
14" POLYVINYL CHLORIDE (PVC) PIPE | 324 | LF |
$250.00 |
$250.00 |
$85.00 |
$540.00 |
$195.00 |
$175.00 |
| 660 | 615(A)1236 |
14" POLYVINYL CHLORIDE (AWWA-C900) PIPE | 71 | LF |
$270.00 |
$300.00 |
$124.00 |
$595.00 |
$450.00 |
$195.00 |
| 670 | 616(I)3333 |
24" STEEL CASING | 140 | LF |
$150.00 |
$250.00 |
$200.00 |
$150.00 |
$190.00 |
$225.00 |
| 680 | 619(B)6372 |
REMOVAL OF MANHOLES | 2 | EA |
$1,250.00 |
$2,000.00 |
$1,115.00 |
$2,500.00 |
$500.00 |
$1,500.00 |
| 690 | 619(B)6440 |
REMOVAL OF EXISTING PIPE | 145 | LF |
$22.00 |
$30.00 |
$20.00 |
$40.00 |
$10.00 |
$50.00 |
| 700 | 202(C)2400 |
ROCK EXCAVATION | 18 | CY |
$80.00 |
$150.00 |
$205.00 |
$250.00 |
$100.00 |
$300.00 |
| 710 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 400 | CY |
$25.00 |
$15.00 |
$22.00 |
$10.00 |
$50.00 |
$15.00 |
| 720 | 501(G)1800 |
CLSM BACKFILL | 72 | CY |
$194.00 |
$200.00 |
$130.00 |
$175.00 |
$130.00 |
$175.00 |
| 730 | 508 9110 |
PRECAST ARCH CULVERT | 46 | LF |
$8,000.00 |
$10,000.00 |
$10,800.00 |
$8,900.00 |
$8,500.00 |
$10,850.00 |
| 740 | 509(A)0210 |
CLASS AA CONCRETE | 3.6 | CY |
$800.00 |
$800.00 |
$720.00 |
$500.00 |
$700.00 |
$1,300.00 |
| 750 | 509(B)0320 |
CLASS A CONCRETE | 51.4 | CY |
$800.00 |
$750.00 |
$390.00 |
$500.00 |
$650.00 |
$600.00 |
| 760 | 510(A)1210 |
RETAINING WALL | 71.2 | SY |
$950.00 |
$1,100.00 |
$1,035.00 |
$500.00 |
$900.00 |
$1,300.00 |
| 770 | 511(A)2210 |
REINFORCING STEEL | 4,560 | LB |
$1.00 |
$1.00 |
$1.35 |
$5.00 |
$1.00 |
$1.75 |
| 780 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 434 | TON |
$45.00 |
$55.00 |
$55.00 |
$47.81 |
$70.00 |
$55.00 |
| 790 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 45 | TON |
$45.00 |
$50.00 |
$32.00 |
$40.00 |
$60.00 |
$48.00 |
| 800 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$8,000.00 |
$10,000.00 |
$4,500.00 |
$12,500.00 |
$121,910.00 |
$10,000.00 |
| 810 | 622(A)0220 |
2" PIPE RAILING | 83.6 | LF |
$120.00 |
$175.00 |
$250.00 |
$150.00 |
$150.00 |
$200.00 |
| 820 | 202(C)2400 |
ROCK EXCAVATION | 33 | CY |
$80.00 |
$150.00 |
$155.00 |
$250.00 |
$100.00 |
$300.00 |
| 830 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 330 | CY |
$25.00 |
$15.00 |
$40.00 |
$10.00 |
$50.00 |
$15.00 |
| 840 | 501(G)1800 |
CLSM BACKFILL | 80 | CY |
$194.00 |
$180.00 |
$115.00 |
$200.00 |
$130.00 |
$175.00 |
| 850 | 508 9110 |
PRECAST ARCH CULVERT | 73.5 | LF |
$8,000.00 |
$6,751.00 |
$7,725.00 |
$6,164.00 |
$6,000.00 |
$8,400.00 |
| 860 | 509(A)0210 |
CLASS AA CONCRETE | 4.4 | CY |
$800.00 |
$800.00 |
$805.00 |
$500.00 |
$700.00 |
$1,300.00 |
| 870 | 509(B)0320 |
CLASS A CONCRETE | 72 | CY |
$800.00 |
$800.00 |
$490.00 |
$500.00 |
$650.00 |
$600.00 |
| 880 | 510(A)1210 |
RETAINING WALL | 89.4 | SY |
$950.00 |
$800.00 |
$910.00 |
$400.00 |
$700.00 |
$1,200.00 |
| 890 | 511(A)2210 |
REINFORCING STEEL | 6,000 | LB |
$1.00 |
$1.10 |
$1.40 |
$5.00 |
$1.00 |
$1.75 |
| 900 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 518 | TON |
$45.00 |
$60.00 |
$55.00 |
$47.81 |
$70.00 |
$55.00 |
| 910 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 61 | TON |
$45.00 |
$50.00 |
$32.00 |
$40.00 |
$60.00 |
$48.00 |
| 920 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$12,000.00 |
$10,000.00 |
$4,500.00 |
$12,500.00 |
$96,000.00 |
$10,000.00 |
| 930 | 856(A)8200 |
TRAFFIC STRIPE(MULTI-POLY.)(4" WIDE) | 3,775 | LF |
$0.5000 |
$1.20 |
$1.30 |
$1.45 |
$2.00 |
$1.15 |
| 940 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 540 | SD |
$1.00 |
$1.00 |
$2.15 |
$0.2000 |
$3.00 |
$2.00 |
| 950 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,700 | SD |
$1.50 |
$1.50 |
$0.2700 |
$0.2000 |
$0.3000 |
$0.2500 |
| 960 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 540 | SD |
$2.00 |
$2.00 |
$2.15 |
$9.00 |
$3.00 |
$2.50 |
| 970 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 2,700 | SD |
$1.00 |
$1.00 |
$0.8000 |
$0.1500 |
$0.8000 |
$0.7500 |
| 980 | 880(C)6420 |
WING BARRICADES | 1,440 | SD |
$1.00 |
$1.00 |
$0.1100 |
$0.0200 |
$0.1500 |
$0.1000 |
| 990 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 6,840 | SD |
$0.2500 |
$0.2500 |
$0.1100 |
$0.0200 |
$0.1500 |
$0.1000 |
| 1,000 | 880(F)6700 |
DRUMS | 10,800 | SD |
$0.5000 |
$0.2500 |
$0.1600 |
$0.0200 |
$0.2000 |
$0.1500 |
| 1,010 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 180 | SD |
$20.00 |
$20.00 |
$17.00 |
$6.00 |
$16.00 |
$15.00 |
| 1,020 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$13,000.00 |
$3,500.00 |
$6,500.00 |
$35,000.00 |
$15,660.00 |
| 1,030 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,000.00 |
$5,000.00 |
$1,000.00 |
$1,000.00 |
$15,000.00 |
$1,375.00 |
| 1,040 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$115,000.00 |
$100,000.00 |
$61,061.35 |
$95,000.00 |
$145,000.00 |
$155,000.00 |