| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 88.74 | CY |
$12.00 |
$18.00 |
$31.64 |
$36.32 |
$25.00 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 180 | CY |
$14.00 |
$25.00 |
$54.33 |
$31.59 |
$50.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$2,000.00 |
$4,500.00 |
$3,035.18 |
$8,179.69 |
$1,800.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,953.9 | LF |
$2.00 |
$1.50 |
$4.32 |
$2.32 |
$7.50 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 897.25 | SY |
$3.35 |
$2.70 |
$6.17 |
$6.79 |
$9.00 |
| 6 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 26.15 | TON |
$40.00 |
$75.00 |
$89.63 |
$78.07 |
$115.00 |
| 7 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 13.08 | TON |
$35.00 |
$62.00 |
$73.45 |
$105.49 |
$110.00 |
| 8 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 911 | SY |
$50.00 |
$50.00 |
$50.28 |
$40.00 |
$58.00 |
| 9 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 52 | LF |
$45.00 |
$100.00 |
$62.88 |
$67.78 |
$60.00 |
| 10 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$800.00 |
$440.00 |
$403.73 |
$256.69 |
$500.00 |
| 11 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,500.00 |
$6,000.00 |
$3,305.91 |
$12,500.00 |
$7,250.00 |
| 12 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,500.00 |
$2,500.00 |
$1,734.66 |
$1,200.00 |
$6,500.00 |
| 13 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$10,000.00 |
$20,000.00 |
$23,818.82 |
$45,000.00 |
$35,000.00 |
| 24 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 70.39 | CY |
$12.00 |
$18.00 |
$39.89 |
$36.62 |
$25.00 |
| 25 | 202(D) 0184 |
UNCLASSIFIED BORROW | 48 | CY |
$14.00 |
$25.00 |
$78.01 |
$83.22 |
$50.00 |
| 26 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$2,000.00 |
$2,500.00 |
$1,707.37 |
$4,100.00 |
$2,000.00 |
| 27 | 221(C) 2801 |
TEMPORARY SILT FENCE | 789.9 | LF |
$2.00 |
$1.50 |
$4.32 |
$2.43 |
$7.50 |
| 28 | 230(A) 2806 |
SOLID SLAB SODDING | 547.14 | SY |
$3.35 |
$2.70 |
$6.17 |
$6.79 |
$9.00 |
| 29 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 7.9 | TON |
$100.00 |
$200.00 |
$370.63 |
$455.63 |
$350.00 |
| 30 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 562 | SY |
$50.00 |
$50.00 |
$64.95 |
$40.00 |
$58.00 |
| 31 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 55.68 | SF |
$50.00 |
$50.00 |
$29.96 |
$35.83 |
$35.00 |
| 32 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 10 | LF |
$45.00 |
$100.00 |
$61.66 |
$52.03 |
$60.00 |
| 33 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$800.00 |
$440.00 |
$400.40 |
$482.35 |
$500.00 |
| 34 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 58.78 | SY |
$25.00 |
$15.00 |
$13.09 |
$34.55 |
$15.00 |
| 35 | 619(C) 0924 |
SAWING PAVEMENT | 17.33 | LF |
$25.00 |
$6.00 |
$6.00 |
$33.75 |
$5.00 |
| 36 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 120.07 | LF |
$8.50 |
$15.00 |
$13.13 |
$15.19 |
$32.00 |
| 37 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 65.88 | LF |
$0.5000 |
$12.00 |
$5.25 |
$12.66 |
$20.00 |
| 38 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$2,500.00 |
$5,000.00 |
$1,181.25 |
$2,911.96 |
$6,500.00 |