| 1 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 17 | EA |
$340.00 |
$85.00 |
$100.00 |
| 2 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 120 | SD |
$20.00 |
$10.00 |
$5.00 |
| 3 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 120 | SD |
$5.00 |
$1.50 |
$5.00 |
| 4 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,360 | SD |
$0.4000 |
$2.10 |
$0.2500 |
| 5 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,680 | SD |
$0.6000 |
$2.10 |
$0.5000 |
| 6 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,000 | SD |
$1.35 |
$2.10 |
$3.00 |
| 7 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 480 | SD |
$0.8000 |
$0.0500 |
$2.00 |
| 8 | 880(C) 8848 |
WING BARRICADES | 480 | SD |
$1.65 |
$2.10 |
$5.00 |
| 9 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 3,360 | SD |
$0.4000 |
$0.1000 |
$0.1000 |
| 10 | 880(F) 8878 |
DRUMS | 3,600 | SD |
$0.2500 |
$0.1000 |
$0.1000 |
| 11 | 880(G) 8890 |
CHANNELIZER CONES | 33,600 | SD |
$0.3500 |
$0.1000 |
$0.1000 |
| 12 | 880(L) 8920 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BIDDABLE) | 500 | HOUR |
$69.00 |
$69.00 |
$69.00 |
| 13 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 284 | SD |
$13.00 |
$6.00 |
$25.00 |
| 14 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 200 | LF |
$0.4000 |
$4.00 |
$17.00 |
| 15 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 4,400 | CY |
$6.25 |
$16.92 |
$8.00 |
| 16 | 202(D) 0184 |
UNCLASSIFIED BORROW | 3,500 | CY |
$7.80 |
$35.79 |
$2.00 |
| 17 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,000 | LF |
$1.90 |
$1.65 |
$2.00 |
| 18 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 18 | EA |
$240.00 |
$225.00 |
$200.00 |
| 19 | 221(F) 0100 |
TEMPORARY SILT DIKE | 746 | LF |
$8.40 |
$11.50 |
$8.00 |
| 20 | 230(A) 2806 |
SOLID SLAB SODDING | 14,300 | SY |
$1.60 |
$1.25 |
$1.40 |
| 21 | 241 2832 |
MOWING | 40 | AC |
$88.20 |
$125.00 |
$125.00 |
| 22 | 408 5774 |
PRIME COAT | 16,451.3 | GAL |
$2.15 |
$5.00 |
$7.59 |
| 23 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 6,915.12 | TON |
$70.00 |
$76.90 |
$94.00 |
| 24 | 509(A) 0319 |
CLASS AA CONCRETE | 451.85 | CY |
$428.00 |
$140.00 |
$300.00 |
| 25 | 612(C) 0645 |
INLET ADJUST TO GRADE | 2 | EA |
$1,622.00 |
$2,800.00 |
$1,500.00 |
| 26 | 628(B) 5125 |
HIGH-TENSION CABLE BARRIER(TL-4) | 34,730 | LF |
$11.00 |
$8.65 |
$11.75 |
| 27 | 628(C) 5110 |
END ANCHORS | 42 | EA |
$2,320.00 |
$4,000.00 |
$1,370.00 |
| 28 | 628(E) 5175 |
CABLE BARRIER TENSION METER | 1 | EA |
$3,850.00 |
$3,200.00 |
$2,000.00 |
| 29 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$1,500.00 |
$2,450.00 |
$500.00 |
| 30 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$2,500.00 |
$3,000.00 |
$2,500.00 |
| 31 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$89,875.00 |
$103,114.00 |
$59,875.00 |