Bid tab 170316

Let Apr 19, 2018 · Division 8 · Creek Sign up free

‹ Apr 2018 results

SAFETY IMPROVEMENT (HIGH FRICTION SURFACE TREATMENT ) US-HIGHWAYS /STATE HIGHWAYS : AT MULTIPLE LOCATIONS IN DIVISION I, II, III, AND VIII.

Let date
Thursday, April 19, 2018
Contract
170316
J/P numbers
33302(04)
District
Division 8
County
Creek
Highway
Limits
SAFETY IMPROVEMENT (HIGH FRICTION SURFACE TREATMENT ) US-HIGHWAYS /STATE HIGHWAYS : AT MULTIPLE LOCATIONS IN DIVISION I, II, III, AND VIII.
Project number
HSIPG-219F(057)TR

Bidders 4

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$1,227,344
1 ACTION SAFETY SUPPLY CO., LLC Low bidder $1,241,258 +1.1%
2 Direct Traffic Control, Inc. $1,318,048 +7.4% +6.2%
3 JLT Contracting, LLC $1,478,120 +20.4% +19.1%
4 TOTAL HIGHWAY MAINTENANCE, LLC $1,497,105 +22.0% +20.6%

Bid tab: unit prices 38 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 ACTION SAFETY S…#2 Direct Traffic …#3 JLT Contracting…#4 TOTAL HIGHWAY M…
1857(E) 8887 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-16,635EA $0.5000 $1.00 $1.00 $1.15 $1.00
2876(A) 8482 (PL)TRUCK MOUNTED ATTENUATOR90SD $23.00 $20.00 $50.00 $62.55 $21.00
3880(A) 8812 ARROW DISPLAY(TYPE C)90SD $5.00 $5.00 $10.00 $11.40 $5.50
4880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF900SD $0.3500 $0.0500 $2.00 $1.20 $0.1000
5880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF1,080SD $0.6500 $0.0500 $2.00 $2.35 $0.1000
6880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF1,890SD $1.20 $0.0500 $2.00 $2.85 $0.1000
7880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)540SD $1.00 $0.0500 $2.00 $2.35 $0.1000
8880(C) 8848 WING BARRICADES360SD $1.00 $5.00 $2.00 $2.35 $6.00
9880(E) 8860 WARNING LIGHTS(TYPE A)1,800SD $0.3000 $0.1000 $1.00 $1.20 $0.1500
10880(F) 8878 DRUMS2,340SD $0.3000 $0.0500 $1.00 $1.20 $0.1000
11880(G) 8890 CHANNELIZER CONES2,700SD $0.3000 $1.00 $1.00 $1.20 $1.00
12880(I) 8902 FLAGGER60SD $200.00 $500.00 $700.00 $790.00 $600.00
13882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN208SD $15.00 $28.00 $20.00 $28.50 $32.00
14404(I) 4910 (SP) HIGH FRICT. SURF. TREATMENT (CALC. BAUX.)20,592SY $28.00 $20.00 $18.54 $21.00 $22.35
15413(B) 4862 RUMBLE STRIP-METHOD HMA-CYC GROUP13EAGP $650.00 $865.00 $750.00 $1,135.00 $1,100.00
16805(A) 8722 (PL)REMOVAL OF EXISTING SIGNS1LSUM $1,500.00 $7,800.00 $11,000.00 $5,660.00 $12,500.00
17805(D) 8756 (PL)REMOVE & RESET EXISTING SIGNS13EA $300.00 $130.00 $250.00 $282.80 $225.00
18850(A) 8110 SHEET ALUMINUM SIGNS1,495SF $21.00 $23.00 $20.00 $40.00 $28.00
19851(C) 8324 2" SQUARE TUBE POST896LF $10.00 $6.00 $12.00 $15.85 $8.00
20851(C) 8330 2 1/2" SQUARE TUBE POST729.5LF $10.00 $6.00 $12.00 $15.85 $8.00
21856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)9,400LF $0.7500 $0.6000 $1.00 $1.15 $0.8000
22856(A) 8535 TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE)42,145LF $0.8000 $1.20 $1.10 $1.20 $1.00
23857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)51,545LF $0.2500 $0.2000 $0.2500 $0.3000 $0.6500
24858(A) 8914 PAVEMENT MARKERS CLASS A TYPE 2-D29EA $5.50 $15.00 $20.00 $22.65 $17.00
25890 7700 (PL)TRAFFIC ITEMS1LSUM $55,000.00 $34,500.00 $50,000.00 $50,905.00 $65,000.00
26201(B) 0181 SELECTIVE CLEARING1LSUM $3,000.00 $8,758.00 $10,000.00 $22,625.00 $9,800.00
27202(D) 0184 UNCLASSIFIED BORROW200CY $9.50 $75.00 $40.00 $75.00 $82.00
28209 0120 MACHINE GRADING8,462.5LF $8.00 $11.21 $10.50 $11.30 $13.25
29221(C) 2801 TEMPORARY SILT FENCE8,062.5LF $1.50 $2.99 $2.50 $3.40 $3.20
30230(A) 2806 SOLID SLAB SODDING4,709SY $1.30 $3.99 $6.50 $4.85 $4.45
31411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)934.88TON $90.00 $175.00 $150.00 $181.00 $192.00
32619(B) 4780 REMOVAL OF GUARDRAIL3,265LF $4.00 $3.36 $15.00 $2.25 $4.00
33619(C) 0924 SAWING PAVEMENT8,465LF $3.00 $0.8000 $3.00 $3.40 $1.69
34623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE4,262.5LF $18.00 $19.57 $25.00 $21.50 $21.75
35623(G) 8590 GUARDRAIL END TREATMENT (31")30EA $2,400.00 $3,785.00 $3,550.00 $2,350.00 $3,945.00
36853 9066 GUARDRAIL DELINEATORS(TYPE 1, CODE 1)114EA $11.00 $11.65 $20.00 $10.00 $14.35
37642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $8,000.00 $10,000.00 $16,500.00 $67,875.00 $16,500.00
38641 1552 MOBILIZATION1LSUM $81,873.55 $62,200.00 $65,000.00 $100,680.00 $125,000.00