| 1 | 202(D) 0184 |
UNCLASSIFIED BORROW | 275 | CY |
$25.00 |
$10.52 |
$15.00 |
$11.03 |
$18.00 |
| 2 | 221(F) 0100 |
TEMPORARY SILT DIKE | 56 | LF |
$11.00 |
$5.26 |
$20.45 |
$5.52 |
$22.00 |
| 3 | 230(A) 2806 |
SOLID SLAB SODDING | 780 | SY |
$1.60 |
$4.37 |
$3.20 |
$2.48 |
$6.00 |
| 4 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 515 | CY |
$42.00 |
$60.50 |
$47.25 |
$37.75 |
$29.90 |
| 5 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,949 | TON |
$25.00 |
$24.20 |
$19.70 |
$25.37 |
$25.00 |
| 6 | 407(B) 0250 |
TACK COAT | 3,129 | GAL |
$2.60 |
$1.05 |
$2.15 |
$1.10 |
$1.50 |
| 7 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 4,714 | TON |
$75.00 |
$51.55 |
$56.95 |
$57.36 |
$65.00 |
| 8 | 412 5267 |
COLD MILLING PAVEMENT | 42,253 | SY |
$2.50 |
$1.84 |
$1.84 |
$1.93 |
$2.00 |
| 9 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 38,565 | LF |
$0.1500 |
$0.1500 |
$0.1000 |
$0.2400 |
$0.1800 |
| 10 | 414(E) 0225 |
FULL DEPTH P.C. CONCRETE PATCHING(PLACEMENT ONLY) | 6,034 | SY |
$55.00 |
$54.50 |
$69.25 |
$85.00 |
$83.35 |
| 11 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 1,509 | CY |
$120.00 |
$166.80 |
$211.75 |
$160.00 |
$190.00 |
| 12 | 415 6300 |
CONCRETE JOINT SEALING | 72,061 | LF |
$5.00 |
$1.95 |
$1.78 |
$2.00 |
$2.00 |
| 13 | 416 0100 |
DOWEL BAR RETROFIT | 16,925 | EA |
$30.00 |
$34.40 |
$36.80 |
$29.00 |
$34.91 |
| 14 | 425 5195 |
DIAMOND GRINDING CONCRETE PAVEMENT | 67,417 | SY |
$4.00 |
$3.70 |
$3.63 |
$4.25 |
$2.91 |
| 15 | 610(C) 0609 |
6" CONCRETE DIVIDING STRIP | 34 | SY |
$40.00 |
$136.77 |
$114.00 |
$143.41 |
$150.00 |
| 16 | 611(G) 5335 |
INLET GPI TYPE 2 (DES. 9) | 1 | EA |
$3,500.00 |
$13,745.78 |
$5,215.00 |
$14,413.17 |
$14,000.00 |
| 17 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 88 | LF |
$150.00 |
$210.42 |
$249.00 |
$220.63 |
$210.00 |
| 18 | 613(M) 7198 |
TYPE C6 CULVERT END TREATMENT | 1 | EA |
$2,400.00 |
$1,578.13 |
$2,100.00 |
$1,654.75 |
$1,800.00 |
| 19 | 104 0955 |
(SP) RAILROAD FLAGGING(NON-BIDDABLE) | 6 | DAY |
$300.00 |
$300.00 |
$300.00 |
$300.00 |
$300.00 |
| 20 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 85,300 | LF |
$0.9000 |
$0.5300 |
$0.5700 |
$0.4300 |
$0.6000 |
| 21 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 1,795 | LF |
$6.65 |
$1.32 |
$1.08 |
$0.6600 |
$1.00 |
| 22 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 283 | LF |
$9.80 |
$10.52 |
$10.80 |
$3.31 |
$10.00 |
| 23 | 856(B) 8525 |
TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) | 2 | EA |
$180.00 |
$789.07 |
$810.00 |
$1,654.76 |
$750.00 |
| 24 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 30 | EA |
$110.00 |
$136.77 |
$108.00 |
$275.79 |
$100.00 |
| 25 | 857(F) 8820 |
PAVEMENT MARKING REMOVAL (HYDROBLASTING) | 14,500 | LF |
$0.7000 |
$0.3200 |
$0.7000 |
$0.2300 |
$0.7500 |
| 26 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$50,000.00 |
$113,000.00 |
$13,100.00 |
$185,000.00 |
$105,000.00 |
| 27 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 194 | SD |
$20.00 |
$21.04 |
$21.60 |
$8.83 |
$30.00 |
| 28 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$50,000.00 |
$200,000.00 |
$126,000.00 |
$95,000.00 |
$165,000.00 |