| 1 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$10,000.00 |
$25,840.00 |
$65,000.00 |
| 2 | 230(A) 2806 |
SOLID SLAB SODDING | 2,500 | SY |
$3.27 |
$6.50 |
$3.00 |
| 3 | 402(A) 0217 |
TRAFFIC BOUND SURFACE COURSE TYPE A | 1,266 | TON |
$36.13 |
$29.50 |
$29.50 |
| 4 | 407(D) 0401 |
(SP) NT TACK MATERIAL | 3,669 | GAL |
$3.45 |
$3.60 |
$2.50 |
| 5 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 2,728 | TON |
$93.67 |
$70.05 |
$65.00 |
| 6 | 411(D) 5975 |
SUPERPAVE, TYPE S5(PG 64-22 OK) | 2,046 | TON |
$107.02 |
$75.35 |
$70.00 |
| 7 | 412 5267 |
COLD MILLING PAVEMENT | 981.5 | SY |
$11.77 |
$13.60 |
$11.53 |
| 8 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 17.4 | CY |
$28.89 |
$21.20 |
$35.67 |
| 9 | 509(A) 0319 |
CLASS AA CONCRETE | 79.06 | CY |
$505.00 |
$715.50 |
$683.72 |
| 10 | 509(D) 0325 |
CLASS C CONCRETE | 22.7 | CY |
$309.75 |
$371.00 |
$255.65 |
| 11 | 511(A) 0332 |
REINFORCING STEEL | 16,972.4 | LB |
$1.13 |
$1.10 |
$1.07 |
| 12 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 151.2 | TON |
$49.29 |
$53.00 |
$58.18 |
| 13 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 64 | LF |
$69.72 |
$165.40 |
$90.48 |
| 14 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 6 | EA |
$967.67 |
$1,115.00 |
$631.38 |
| 15 | 613(S) 1186 |
STANDARD BEDDING MATERIAL, CLASS B | 31.71 | CY |
$69.64 |
$47.70 |
$62.32 |
| 16 | 613(V) 1180 |
TRENCH EXCAVATION | 46.61 | CY |
$15.14 |
$26.50 |
$35.67 |
| 17 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$2,000.00 |
$8,480.00 |
$15,000.00 |
| 18 | 619(B) 4791 |
REMOVAL OF CURB | 94.66 | LF |
$5.00 |
$116.90 |
$25.02 |
| 19 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 74.4 | CY |
$17.13 |
$26.50 |
$11.89 |
| 20 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 20.66 | CY |
$28.89 |
$26.50 |
$35.67 |
| 21 | 509(A) 0319 |
CLASS AA CONCRETE | 59.3 | CY |
$505.00 |
$690.00 |
$720.00 |
| 22 | 509(D) 0325 |
CLASS C CONCRETE | 7.4 | CY |
$309.75 |
$371.00 |
$356.72 |
| 23 | 511(A) 1332 |
REINFORCING STEEL | 13,141.4 | LB |
$1.09 |
$1.10 |
$1.07 |
| 24 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 50.4 | TON |
$49.29 |
$42.40 |
$57.54 |
| 25 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$6,000.00 |
$8,480.00 |
$8,918.11 |
| 26 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 56.26 | SF |
$19.81 |
$21.20 |
$23.78 |
| 27 | 851(C) 8324 |
2" SQUARE TUBE POST | 97.58 | LF |
$10.06 |
$10.60 |
$11.89 |
| 28 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 42,115.68 | LF |
$0.1500 |
$0.1500 |
$0.1300 |
| 29 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$6,708.20 |
$2,335.00 |
$4,161.79 |
| 30 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$17,000.00 |
$12,720.00 |
$11,296.27 |
| 31 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$58,687.81 |
$68,800.00 |
$100,000.00 |