| 1 | 202(D) 4781 |
UNCLASSIFIED BORROW (TOPSOIL) | 3,000 | CY |
$15.00 |
$20.00 |
| 2 | 407(D) 0401 |
(SP) NT TACK MATERIAL | 22,000 | GAL |
$3.50 |
$3.80 |
| 3 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 10,600 | TON |
$85.00 |
$81.85 |
| 4 | 411(E) 5990 |
SUPERPAVE, TYPE S6(PG 64-22 OK) | 4,500 | TON |
$90.00 |
$80.50 |
| 5 | 411(H) 6210 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 800 | TON |
$100.00 |
$130.00 |
| 6 | 412 5267 |
COLD MILLING PAVEMENT | 800 | SY |
$2.50 |
$16.10 |
| 7 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 400 | SY |
$50.00 |
$35.00 |
| 8 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 1,200 | SY |
$80.00 |
$59.25 |
| 9 | 619(C) 0924 |
SAWING PAVEMENT | 3,400 | LF |
$7.00 |
$6.15 |
| 10 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 135,000 | LF |
$0.4500 |
$0.4700 |
| 11 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 1,000 | LF |
$2.00 |
$0.6500 |
| 12 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 50 | LF |
$4.00 |
$10.00 |
| 13 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$11,230.00 |