| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 532 | CY |
$15.00 |
$9.00 |
$10.00 |
$32.25 |
| 2 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 397 | CY |
$67.00 |
$35.00 |
$15.00 |
$49.95 |
| 3 | 325 5271 |
SEPARATOR FABRIC | 1,778 | SY |
$1.60 |
$1.00 |
$0.5000 |
$2.08 |
| 4 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,552 | TON |
$25.00 |
$35.00 |
$27.00 |
$23.74 |
| 5 | 407(B) 0250 |
TACK COAT | 478 | GAL |
$3.00 |
$1.00 |
$3.50 |
$2.78 |
| 6 | 408 5774 |
PRIME COAT | 1,016 | GAL |
$7.50 |
$1.00 |
$3.60 |
$5.42 |
| 7 | 409(A) 4242 |
FABRIC REINFORCEMENT | 75,783 | SY |
$3.10 |
$1.75 |
$1.80 |
$1.92 |
| 8 | 409(B) 4268 |
BITUMINOUS BINDER | 15,157 | GAL |
$3.70 |
$3.50 |
$6.35 |
$3.80 |
| 9 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 379 | TON |
$85.00 |
$59.00 |
$52.00 |
$76.61 |
| 10 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 13,314 | TON |
$80.00 |
$59.00 |
$62.00 |
$63.30 |
| 11 | 411(H) 6210 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 20 | TON |
$110.00 |
$80.00 |
$255.00 |
$278.55 |
| 12 | 411(I) 6310 |
SUPERPAVE, TYPE S4(PATCH)(PG64-22OK) | 20 | TON |
$140.00 |
$90.00 |
$255.00 |
$285.49 |
| 13 | 412 5267 |
COLD MILLING PAVEMENT | 267 | SY |
$1.50 |
$2.50 |
$20.00 |
$23.16 |
| 14 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 27 | SY |
$40.00 |
$30.00 |
$155.00 |
$137.00 |
| 15 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 6 | CY |
$110.00 |
$120.00 |
$220.00 |
$142.34 |
| 16 | 416 0100 |
DOWEL BAR RETROFIT | 58 | EA |
$25.00 |
$27.00 |
$55.00 |
$218.26 |
| 17 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$1,000.00 |
$550.00 |
$531.00 |
$545.64 |
| 18 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 341.9 | SF |
$12.00 |
$22.00 |
$21.00 |
$21.83 |
| 19 | 851(C) 8324 |
2" SQUARE TUBE POST | 821 | LF |
$7.60 |
$9.00 |
$8.50 |
$8.73 |
| 20 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 78,961 | LF |
$0.3000 |
$0.3600 |
$0.3500 |
$0.3600 |
| 21 | 856(B) 8525 |
TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) | 4 | EA |
$136.00 |
$275.00 |
$265.50 |
$272.82 |
| 22 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$15,000.00 |
$23,000.00 |
$4,300.00 |
$15,384.92 |
| 23 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$5,000.00 |
$5,500.00 |
$11,000.00 |
$5,456.43 |
| 24 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$90,000.00 |
$35,000.00 |
$22,088.30 |
$62,142.42 |