| 1 | 202(D) 0184 |
UNCLASSIFIED BORROW | 462 | CY |
$8.00 |
$21.20 |
$15.90 |
$8.00 |
$20.00 |
$74.00 |
$10.00 |
| 2 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 54 | TON |
$29.00 |
$25.00 |
$30.10 |
$27.00 |
$40.00 |
$65.00 |
$30.00 |
| 3 | 407(B) 0250 |
TACK COAT | 7,561 | GAL |
$3.00 |
$3.40 |
$2.50 |
$3.00 |
$3.25 |
$3.00 |
$4.00 |
| 4 | 411(D) 5970 |
SUPERPAVE, TYPE S5(PG 70-28 OK) | 6,200 | TON |
$82.00 |
$70.17 |
$73.35 |
$84.00 |
$82.00 |
$86.00 |
$105.00 |
| 5 | 412 5267 |
COLD MILLING PAVEMENT | 1,520 | SY |
$21.00 |
$4.25 |
$5.65 |
$5.00 |
$5.00 |
$10.00 |
$16.00 |
| 6 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 147 | LF |
$4.00 |
$3.90 |
$2.25 |
$10.50 |
$12.00 |
$6.00 |
$5.00 |
| 7 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 400 | LF |
$19.00 |
$18.68 |
$18.20 |
$16.50 |
$17.00 |
$16.60 |
$23.00 |
| 8 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,200.00 |
$2,529.00 |
$2,205.00 |
$2,300.00 |
$2,400.00 |
$2,450.00 |
$3,000.00 |
| 9 | 623(H) 0940 |
GUARDRAIL BLOCKOUT REPLACEMENT | 662 | LF |
$2.40 |
$7.03 |
$6.30 |
$5.50 |
$6.00 |
$5.00 |
$8.00 |
| 10 | 623(I) 8695 |
GUARDRAIL BRIDGE CONN (D-BF RETROFIT) | 2 | EA |
$2,200.00 |
$2,489.00 |
$1,430.00 |
$1,200.00 |
$1,250.00 |
$1,660.00 |
$1,950.00 |
| 11 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,200.00 |
$2,572.00 |
$1,550.00 |
$1,650.00 |
$1,600.00 |
$2,105.00 |
$3,000.00 |
| 12 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 16 | EA |
$10.75 |
$11.07 |
$10.10 |
$11.00 |
$22.00 |
$13.00 |
$18.00 |
| 13 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 47,920 | LF |
$0.5500 |
$0.4200 |
$0.3900 |
$0.4000 |
$0.4000 |
$0.4500 |
$0.5500 |
| 14 | 855(A) 8814 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 1,625 | LF |
$2.00 |
$0.4400 |
$1.20 |
$1.25 |
$1.35 |
$1.30 |
$0.6500 |
| 15 | 855(A) 8818 |
TRAFFIC STRIPE(PLASTIC)(12" WIDE) | 150 | LF |
$3.00 |
$1.50 |
$5.05 |
$5.50 |
$6.00 |
$5.40 |
$1.85 |
| 16 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 2 | EA |
$85.00 |
$125.00 |
$75.00 |
$80.00 |
$100.00 |
$80.00 |
$175.00 |
| 17 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$9,000.00 |
$48,000.00 |
$43,600.00 |
$4,000.00 |
$12,000.00 |
$21,092.50 |
$20,500.00 |