| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$25,000.00 |
$20,000.00 |
$10,000.00 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,654 | CY |
$20.00 |
$25.00 |
$26.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$30,000.00 |
$25,000.00 |
$80,000.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 210 | LF |
$2.50 |
$3.00 |
$4.10 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 2,000 | SY |
$2.50 |
$3.00 |
$7.00 |
| 6 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 154 | TON |
$45.00 |
$50.00 |
$72.00 |
| 7 | 509(B) 0321 |
CLASS A CONCRETE | 612 | CY |
$775.00 |
$800.00 |
$510.00 |
| 8 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 298 | LF |
$850.00 |
$1,200.00 |
$300.00 |
| 9 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 1,014 | LF |
$35.00 |
$35.00 |
$53.00 |
| 10 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 14 | EA |
$1,750.00 |
$2,000.00 |
$1,630.00 |
| 11 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$15,000.00 |
$15,000.00 |
$10,000.00 |
| 12 | 619(B) 5190 |
REMOVAL OF CABLE BARRIER | 2,270 | LF |
$10.00 |
$5.00 |
$4.60 |
| 13 | 625(D) 1254 |
REMOVE AND RECONSTRUCT GUARDRAIL | 110 | LF |
$35.00 |
$20.00 |
$26.62 |
| 14 | 628 5180 |
INSTALLATION OF CABLE BARRIER SYSTEM | 2,503 | LF |
$15.00 |
$20.00 |
$4.60 |
| 15 | 628(B) 5125 |
HIGH-TENSION CABLE BARRIER(TL-4) | 233 | LF |
$25.00 |
$30.00 |
$49.57 |
| 16 | 628(C) 5110 |
END ANCHORS | 7 | EA |
$3,500.00 |
$4,000.00 |
$3,812.25 |
| 17 | 802(C) 8551 |
1 1/2" HIGH DENSITY PE PIPE - BORED | 1,500 | LF |
$23.00 |
$25.00 |
$25.00 |
| 18 | 802(C) 8553 |
3" HIGH DENSITY PE PIPE - BORED | 1,720 | LF |
$55.00 |
$50.00 |
$45.00 |
| 19 | 802(C) 8556 |
1 1/2" HIGH DENSITY PE PIPE - TRENCHED | 8,437 | LF |
$6.00 |
$5.00 |
$9.00 |
| 20 | 802(C) 8558 |
3" HIGH DENSITY PE PIPE - TRENCHED | 10,865 | LF |
$12.00 |
$10.00 |
$12.75 |
| 21 | 803(A) 8066 |
PULL BOX(SIZE II) | 36 | EA |
$500.00 |
$475.00 |
$660.00 |
| 22 | 803(B) 8105 |
GROUND BOX (R48) | 23 | EA |
$4,200.00 |
$3,750.00 |
$4,375.00 |
| 23 | 804(B) 2916 |
REINFORCING STEEL | 12,496 | LB |
$2.50 |
$1.50 |
$2.15 |
| 24 | 805(D) 8762 |
(PL)REMOVE & RESET G.E.T. GUARD RAIL END SECTION | 1 | EA |
$2,000.00 |
$2,500.00 |
$2,495.50 |
| 25 | 810(A) 3118 |
SERVICE POLE | 11 | EA |
$3,500.00 |
$5,000.00 |
$6,850.00 |
| 26 | 811 8032 |
1/C NO.0 ELECTRICAL CONDUCTOR | 34,580 | LF |
$5.00 |
$3.25 |
$4.65 |
| 27 | 815(A) 8615 |
(SP)CCTV CAMERA, WEB | 21 | EA |
$2,250.00 |
$2,000.00 |
$3,100.00 |
| 28 | 815(B) 8610 |
(SP)CCTV CAMERA, PAN-TILT-ZOOM | 14 | EA |
$6,000.00 |
$5,500.00 |
$7,650.00 |
| 29 | 816 8620 |
(SP)CCTV CAMERA POLE | 7 | EA |
$23,000.00 |
$21,250.00 |
$16,400.00 |
| 30 | 818(A) 8715 |
(SP)FIBER OPTIC CABLE, 24 SMF | 8,405 | LF |
$3.00 |
$7.10 |
$2.75 |
| 31 | 818(B) 8745 |
(SP)FIBER OPTIC PATCH PANEL, 24 PORT | 12 | EA |
$1,200.00 |
$1,250.00 |
$290.00 |
| 32 | 818(C) 8735 |
(SP)FIBER OPTIC CABLE SPLICE | 22 | EA |
$90.00 |
$75.00 |
$52.50 |
| 33 | 818(D) 8740 |
(SP)FIBER OPTIC CABLE TERMINATION | 44 | EA |
$80.00 |
$95.00 |
$45.50 |
| 34 | 818(F) 8370 |
(SP) SHIELD ISOLATION PEDESTAL | 12 | EA |
$975.00 |
$190.00 |
$90.00 |
| 35 | 818(G) 5570 |
(SP)FIBER OPTIC ROUTE SIGN & INSTALLATION | 12 | EA |
$175.00 |
$125.00 |
$110.00 |
| 36 | 819 8780 |
(PL)FIBER OPTIC & COMMUNICATION EQUIPMENT | 1 | LSUM |
$35,000.00 |
$49,156.00 |
$41,100.00 |
| 37 | 819(B) 5550 |
(SP)INSTALLATION OF COMMUNICATION CABLE | 480 | LF |
$30.00 |
$25.00 |
$34.50 |
| 38 | 824(C) 6551 |
(SP)CABINET | 14 | EA |
$10,500.00 |
$11,331.00 |
$8,000.00 |
| 39 | 852(H) 8603 |
OVERHEAD SIGN STRUCTURE WALKWAY & HANDRAIL-INTERNAL | 140 | LF |
$225.00 |
$125.00 |
$265.00 |
| 40 | 852A/B 9009 |
OVHD.SN.STR.TYPE D ALUM./G.STL. | 7 | EA |
$35,000.00 |
$31,000.00 |
$47,665.00 |
| 41 | 870(A) 8011 |
SAND FILLED IMPACT ATTENUATION MODULE | 247 | EA |
$350.00 |
$315.00 |
$327.75 |
| 42 | 887(A) 8540 |
(SP)LED DYNAMIC MESSAGE SIGN FIELD EQUIPMENT(18 INCH) | 14 | EA |
$95,000.00 |
$80,000.00 |
$79,310.00 |
| 43 | 887(C) 8500 |
(SP)LED D.M.S SYSTEM SUPPORT EQUIPMENT | 1 | LSUM |
$35,000.00 |
$13,800.00 |
$15,000.00 |
| 44 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$40,000.00 |
$17,500.00 |
$80,000.00 |
| 45 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$380,000.00 |
$20,000.00 |
$242,000.00 |