Bid tab 150340

Let May 19, 2016 · · Beckham, Bryan, Choctaw, Cotton, Kay, Love, Oklahoma, Sequoy Sign up free

‹ May 2016 results

SAFETY IMPROVEMENT (DYNAMIC MESSAGE SIGN AND CCTV PROJECT ) I-35/I-40/I-44/US-69/US-271: AT MULTIPLE LOCATIONS ON THE OKLAHOMA STATE LINE.

Let date
Thursday, May 19, 2016
Contract
150340
J/P numbers
25909(48)
District
County
Beckham, Bryan, Choctaw, Cotton, Kay, Love, Oklahoma, Sequoy
Highway
Limits
SAFETY IMPROVEMENT (DYNAMIC MESSAGE SIGN AND CCTV PROJECT ) I-35/I-40/I-44/US-69/US-271: AT MULTIPLE LOCATIONS ON THE OKLAHOMA STATE LINE.
Project number
HSIPG-255F(180)IT

Bidders 2

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate—
1 Midstate Traffic Control, Inc. Low bidder $3,771,715
2 TRAFFIC & LIGHTING SYSTEMS, LLC $3,843,270 +1.9%

Bid tab: unit prices 45 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Midstate Traffi…#2 TRAFFIC & LIGHT…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $25,000.00 $20,000.00 $10,000.00
2202(D) 0184 UNCLASSIFIED BORROW2,654CY $20.00 $25.00 $26.00
3205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $30,000.00 $25,000.00 $80,000.00
4221(C) 2801 TEMPORARY SILT FENCE210LF $2.50 $3.00 $4.10
5230(A) 2806 SOLID SLAB SODDING2,000SY $2.50 $3.00 $7.00
6402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E154TON $45.00 $50.00 $72.00
7509(B) 0321 CLASS A CONCRETE612CY $775.00 $800.00 $510.00
8516(A) 6094 DRILLED SHAFTS 48" DIAMETER298LF $850.00 $1,200.00 $300.00
9613(B) 4527 21" X 15" CORR. GALV. STEEL PIPE ARCH1,014LF $35.00 $35.00 $53.00
10613(M) 7196 TYPE A6 CULVERT END TREATMENT14EA $1,750.00 $2,000.00 $1,630.00
11619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $15,000.00 $15,000.00 $10,000.00
12619(B) 5190 REMOVAL OF CABLE BARRIER2,270LF $10.00 $5.00 $4.60
13625(D) 1254 REMOVE AND RECONSTRUCT GUARDRAIL110LF $35.00 $20.00 $26.62
14628 5180 INSTALLATION OF CABLE BARRIER SYSTEM2,503LF $15.00 $20.00 $4.60
15628(B) 5125 HIGH-TENSION CABLE BARRIER(TL-4)233LF $25.00 $30.00 $49.57
16628(C) 5110 END ANCHORS7EA $3,500.00 $4,000.00 $3,812.25
17802(C) 8551 1 1/2" HIGH DENSITY PE PIPE - BORED1,500LF $23.00 $25.00 $25.00
18802(C) 8553 3" HIGH DENSITY PE PIPE - BORED1,720LF $55.00 $50.00 $45.00
19802(C) 8556 1 1/2" HIGH DENSITY PE PIPE - TRENCHED8,437LF $6.00 $5.00 $9.00
20802(C) 8558 3" HIGH DENSITY PE PIPE - TRENCHED10,865LF $12.00 $10.00 $12.75
21803(A) 8066 PULL BOX(SIZE II)36EA $500.00 $475.00 $660.00
22803(B) 8105 GROUND BOX (R48)23EA $4,200.00 $3,750.00 $4,375.00
23804(B) 2916 REINFORCING STEEL12,496LB $2.50 $1.50 $2.15
24805(D) 8762 (PL)REMOVE & RESET G.E.T. GUARD RAIL END SECTION1EA $2,000.00 $2,500.00 $2,495.50
25810(A) 3118 SERVICE POLE11EA $3,500.00 $5,000.00 $6,850.00
26811 8032 1/C NO.0 ELECTRICAL CONDUCTOR34,580LF $5.00 $3.25 $4.65
27815(A) 8615 (SP)CCTV CAMERA, WEB21EA $2,250.00 $2,000.00 $3,100.00
28815(B) 8610 (SP)CCTV CAMERA, PAN-TILT-ZOOM14EA $6,000.00 $5,500.00 $7,650.00
29816 8620 (SP)CCTV CAMERA POLE7EA $23,000.00 $21,250.00 $16,400.00
30818(A) 8715 (SP)FIBER OPTIC CABLE, 24 SMF8,405LF $3.00 $7.10 $2.75
31818(B) 8745 (SP)FIBER OPTIC PATCH PANEL, 24 PORT12EA $1,200.00 $1,250.00 $290.00
32818(C) 8735 (SP)FIBER OPTIC CABLE SPLICE22EA $90.00 $75.00 $52.50
33818(D) 8740 (SP)FIBER OPTIC CABLE TERMINATION44EA $80.00 $95.00 $45.50
34818(F) 8370 (SP) SHIELD ISOLATION PEDESTAL12EA $975.00 $190.00 $90.00
35818(G) 5570 (SP)FIBER OPTIC ROUTE SIGN & INSTALLATION12EA $175.00 $125.00 $110.00
36819 8780 (PL)FIBER OPTIC & COMMUNICATION EQUIPMENT1LSUM $35,000.00 $49,156.00 $41,100.00
37819(B) 5550 (SP)INSTALLATION OF COMMUNICATION CABLE480LF $30.00 $25.00 $34.50
38824(C) 6551 (SP)CABINET14EA $10,500.00 $11,331.00 $8,000.00
39852(H) 8603 OVERHEAD SIGN STRUCTURE WALKWAY & HANDRAIL-INTERNAL140LF $225.00 $125.00 $265.00
40852A/B 9009 OVHD.SN.STR.TYPE D ALUM./G.STL.7EA $35,000.00 $31,000.00 $47,665.00
41870(A) 8011 SAND FILLED IMPACT ATTENUATION MODULE247EA $350.00 $315.00 $327.75
42887(A) 8540 (SP)LED DYNAMIC MESSAGE SIGN FIELD EQUIPMENT(18 INCH)14EA $95,000.00 $80,000.00 $79,310.00
43887(C) 8500 (SP)LED D.M.S SYSTEM SUPPORT EQUIPMENT1LSUM $35,000.00 $13,800.00 $15,000.00
44880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $40,000.00 $17,500.00 $80,000.00
45641 1552 MOBILIZATION1LSUM $380,000.00 $20,000.00 $242,000.00