| 1 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$10,000.00 |
$10,000.00 |
$25,000.00 |
$52,300.00 |
| 2 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 150 | LF |
$35.00 |
$30.00 |
$46.00 |
$50.00 |
| 3 | 504(H) 6389 |
ELASTOMERIC MORTAR | 10 | CF |
$500.00 |
$825.00 |
$615.00 |
$800.00 |
| 4 | 505(C) 6075 |
MULTIPLE LAYER POLYMER CONCRETE OVERLAY | 835.1 | SY |
$40.00 |
$45.00 |
$45.00 |
$44.00 |
| 5 | 506(A) 1322 |
STRUCTURAL STEEL | 20 | LB |
$10.00 |
$30.00 |
$25.00 |
$225.00 |
| 6 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 1 | EA |
$3,000.00 |
$8,000.00 |
$5,500.00 |
$5,500.00 |
| 7 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 160 | SY |
$500.00 |
$300.00 |
$415.00 |
$475.00 |
| 8 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 10 | SY |
$1,000.00 |
$400.00 |
$680.00 |
$650.00 |
| 9 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 20 | LF |
$50.00 |
$38.00 |
$42.00 |
$50.00 |
| 10 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 2 | GAL |
$150.00 |
$90.00 |
$150.00 |
$200.00 |
| 11 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 73 | SY |
$850.00 |
$675.00 |
$715.00 |
$800.00 |
| 12 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 73 | SY |
$50.00 |
$32.00 |
$37.00 |
$50.00 |
| 13 | 545 4815 |
(PL)REPLACE BRIDGE ITEM (TYPE A) | 2 | EA |
$45,000.00 |
$40,000.00 |
$46,000.00 |
$24,750.00 |
| 14 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$60,000.00 |
$35,000.00 |
$25,000.00 |
$52,300.00 |
| 15 | 505(C) 6075 |
MULTIPLE LAYER POLYMER CONCRETE OVERLAY | 599.2 | SY |
$40.00 |
$45.00 |
$48.00 |
$44.00 |
| 16 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 12 | EA |
$2,000.00 |
$2,000.00 |
$2,500.00 |
$1,500.00 |
| 17 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 12 | EA |
$2,000.00 |
$2,000.00 |
$2,500.00 |
$2,175.00 |
| 18 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 150 | SY |
$500.00 |
$300.00 |
$415.00 |
$475.00 |
| 19 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 20 | LF |
$50.00 |
$38.00 |
$42.00 |
$50.00 |
| 20 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 2 | GAL |
$150.00 |
$90.00 |
$150.00 |
$200.00 |
| 21 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 75 | SY |
$850.00 |
$675.00 |
$715.00 |
$750.00 |
| 22 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 25 | SF |
$100.00 |
$35.00 |
$36.00 |
$80.00 |
| 23 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 75 | SY |
$50.00 |
$32.00 |
$36.00 |
$50.00 |
| 24 | 545 4815 |
(PL)REPLACE BRIDGE ITEM (TYPE A) | 2 | EA |
$30,000.00 |
$35,000.00 |
$34,000.00 |
$23,950.00 |
| 25 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$20,000.00 |
$15,000.00 |
$25,000.00 |
$52,300.00 |
| 26 | 505(C) 6075 |
MULTIPLE LAYER POLYMER CONCRETE OVERLAY | 866.9 | SY |
$40.00 |
$45.00 |
$45.00 |
$44.00 |
| 27 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 4 | EA |
$2,000.00 |
$2,000.00 |
$2,500.00 |
$1,500.00 |
| 28 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$20,000.00 |
$10,000.00 |
$20,000.00 |
$20,000.00 |
| 29 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$5,000.00 |
$500.00 |
$2,500.00 |
$2,000.00 |
| 30 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 20 | SY |
$500.00 |
$300.00 |
$415.00 |
$500.00 |
| 31 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 20 | LF |
$50.00 |
$38.00 |
$42.00 |
$55.00 |
| 32 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 2 | GAL |
$150.00 |
$90.00 |
$150.00 |
$200.00 |
| 33 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 15 | SY |
$850.00 |
$675.00 |
$715.00 |
$900.00 |
| 34 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 15 | SY |
$50.00 |
$32.00 |
$36.00 |
$85.00 |
| 35 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$60,000.00 |
$40,000.00 |
$30,000.00 |
$52,300.00 |
| 36 | 504(C) 1450 |
EXPANSION DEVICE | 91.5 | LF |
$140.00 |
$75.00 |
$150.00 |
$285.00 |
| 37 | 506(A) 1322 |
STRUCTURAL STEEL | 20 | LB |
$10.00 |
$30.00 |
$25.00 |
$250.00 |
| 38 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 9 | EA |
$2,000.00 |
$2,000.00 |
$2,500.00 |
$1,250.00 |
| 39 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$2,000.00 |
$2,000.00 |
$2,500.00 |
$1,500.00 |
| 40 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$10,000.00 |
$9,500.00 |
$20,000.00 |
$20,000.00 |
| 41 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$2,500.00 |
$500.00 |
$2,500.00 |
$2,000.00 |
| 42 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 10 | SY |
$500.00 |
$350.00 |
$425.00 |
$500.00 |
| 43 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 20 | LF |
$50.00 |
$38.00 |
$42.00 |
$50.00 |
| 44 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 2 | GAL |
$150.00 |
$90.00 |
$150.00 |
$200.00 |
| 45 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 48 | SY |
$850.00 |
$675.00 |
$715.00 |
$800.00 |
| 46 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 400 | SF |
$100.00 |
$35.00 |
$36.00 |
$62.50 |
| 47 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 48 | SY |
$50.00 |
$32.00 |
$36.00 |
$56.00 |
| 48 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$60,000.00 |
$35,000.00 |
$30,000.00 |
$52,300.00 |
| 49 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 48 | LF |
$35.00 |
$30.00 |
$52.00 |
$50.00 |
| 50 | 504(H) 6389 |
ELASTOMERIC MORTAR | 8 | CF |
$500.00 |
$850.00 |
$625.00 |
$800.00 |
| 51 | 505(C) 6075 |
MULTIPLE LAYER POLYMER CONCRETE OVERLAY | 866.9 | SY |
$40.00 |
$45.00 |
$45.00 |
$44.00 |
| 52 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 9 | EA |
$2,000.00 |
$2,000.00 |
$2,500.00 |
$1,250.00 |
| 53 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 9 | EA |
$2,000.00 |
$2,000.00 |
$2,500.00 |
$1,500.00 |
| 54 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$10,000.00 |
$6,000.00 |
$20,000.00 |
$20,000.00 |
| 55 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$2,500.00 |
$500.00 |
$2,500.00 |
$2,000.00 |
| 56 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 80 | SY |
$500.00 |
$300.00 |
$420.00 |
$500.00 |
| 57 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 20 | LF |
$50.00 |
$38.00 |
$42.00 |
$50.00 |
| 58 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 2 | GAL |
$150.00 |
$90.00 |
$150.00 |
$200.00 |
| 59 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 13.5 | SY |
$850.00 |
$675.00 |
$715.00 |
$900.00 |
| 60 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 25 | SF |
$100.00 |
$35.00 |
$36.00 |
$68.00 |
| 61 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 13.5 | SY |
$50.00 |
$32.00 |
$36.00 |
$65.00 |
| 62 | 535 6410 |
MASTIC ASPHALT JOINT MATERIAL | 6 | CF |
$500.00 |
$1,200.00 |
$800.00 |
$450.00 |
| 63 | 545 4815 |
(PL)REPLACE BRIDGE ITEM (TYPE A) | 2 | EA |
$35,000.00 |
$35,000.00 |
$37,500.00 |
$23,750.00 |
| 64 | 104 0955 |
(SP) RAILROAD FLAGGING(NON-BIDDABLE) | 20 | DAY |
$300.00 |
$300.00 |
$300.00 |
$300.00 |
| 65 | 823 8478 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 100 | SD |
$150.00 |
$165.00 |
$245.00 |
$200.00 |
| 66 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 13,965 | LF |
$0.9000 |
$0.9900 |
$1.56 |
$1.50 |
| 67 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 7,980 | LF |
$0.7000 |
$0.9300 |
$1.80 |
$1.58 |
| 68 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 13,965 | LF |
$0.2000 |
$0.2700 |
$0.7500 |
$0.7500 |
| 69 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 240 | SD |
$15.00 |
$22.00 |
$7.00 |
$6.00 |
| 70 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 2,025 | LF |
$30.00 |
$28.00 |
$24.00 |
$20.00 |
| 71 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 2,025 | LF |
$5.00 |
$15.00 |
$3.00 |
$3.00 |
| 72 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 40 | SD |
$6.00 |
$11.00 |
$1.20 |
$1.00 |
| 73 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 7,200 | SD |
$0.2000 |
$0.2700 |
$0.0300 |
$0.0200 |
| 74 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,450 | SD |
$0.5000 |
$1.10 |
$0.0300 |
$0.0200 |
| 75 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 5,700 | SD |
$0.7000 |
$0.8200 |
$0.0300 |
$0.0200 |
| 76 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,550 | SD |
$0.8000 |
$2.20 |
$0.0300 |
$0.0200 |
| 77 | 880(C) 8848 |
WING BARRICADES | 1,000 | SD |
$0.5000 |
$2.20 |
$0.0300 |
$0.0200 |
| 78 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 9,200 | SD |
$0.2000 |
$0.2700 |
$0.0300 |
$0.0200 |
| 79 | 880(F) 8878 |
DRUMS | 4,000 | SD |
$0.2000 |
$1.10 |
$0.1000 |
$0.0500 |
| 80 | 880(G) 8890 |
CHANNELIZER CONES | 200 | SD |
$0.6000 |
$1.10 |
$2.35 |
$3.00 |
| 81 | 880(I) 8902 |
FLAGGER | 10 | SD |
$50.00 |
$800.00 |
$250.00 |
$350.00 |
| 82 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$95,000.00 |
$88,911.00 |
$145,000.00 |
$370,910.00 |