| 1 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 50.3 | TON |
$300.00 |
$521.24 |
$511.00 |
$511.50 |
| 2 | 504(A) 1304 |
APPROACH SLAB | 109.4 | SY |
$250.00 |
$229.36 |
$375.00 |
$388.00 |
| 3 | 504(B) 1305 |
SAW-CUT GROOVING | 109.4 | SY |
$20.00 |
$41.94 |
$18.00 |
$25.00 |
| 4 | 504(C) 6250 |
SEALED EXPANSION JOINT | 72 | LF |
$350.00 |
$353.87 |
$425.00 |
$295.00 |
| 5 | 504(E) 1381 |
CONCRETE PARAPET | 56 | LF |
$200.00 |
$511.15 |
$350.00 |
$200.00 |
| 6 | 505(A) 6065 |
BRIDGE DECK CONCRETE OVERLAY | 489 | SY |
$140.00 |
$137.62 |
$135.00 |
$222.00 |
| 7 | 505(E) 1000 |
HYDRODEMOLITION | 489 | SY |
$160.00 |
$31.98 |
$175.00 |
$177.00 |
| 8 | 509(A) 1326 |
CLASS AA CONCRETE | 9.8 | CY |
$3,000.00 |
$583.24 |
$2,500.00 |
$3,700.00 |
| 9 | 509(B) 1328 |
CLASS A CONCRETE | 7 | CY |
$4,000.00 |
$720.86 |
$3,500.00 |
$4,400.00 |
| 10 | 511(A) 1332 |
REINFORCING STEEL | 3,440 | LB |
$1.20 |
$1.22 |
$2.00 |
$2.22 |
| 11 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 50 | SY |
$150.00 |
$412.85 |
$150.00 |
$150.00 |
| 12 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 70 | SY |
$450.00 |
$524.26 |
$700.00 |
$400.00 |
| 13 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 41 | SY |
$10.00 |
$13.11 |
$15.00 |
$11.00 |
| 14 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 12 | SY |
$700.00 |
$642.22 |
$770.00 |
$770.00 |
| 15 | 523(A) 6550 |
SEALER CRACK PREPARATION | 180 | LF |
$5.00 |
$5.24 |
$5.00 |
$5.50 |
| 16 | 523(B) 6560 |
SEALER RESIN | 1.2 | GAL |
$100.00 |
$163.83 |
$75.00 |
$110.00 |
| 17 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 195 | SF |
$70.00 |
$41.94 |
$80.00 |
$75.35 |
| 18 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 37.1 | SY |
$45.00 |
$39.32 |
$50.00 |
$49.50 |
| 19 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 537.5 | LF |
$18.00 |
$19.66 |
$19.00 |
$18.15 |
| 20 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 2 | EA |
$550.00 |
$1,435.16 |
$850.00 |
$825.00 |
| 21 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 2 | EA |
$2,200.00 |
$2,745.81 |
$2,300.00 |
$2,227.50 |
| 22 | 623(I) 8690 |
GUARDRAIL BRIDGE CONN-TRAIL END (31") | 2 | EA |
$1,000.00 |
$2,391.93 |
$800.00 |
$786.50 |
| 23 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 2 | EA |
$1,800.00 |
$2,359.17 |
$1,900.00 |
$1,870.00 |
| 24 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 46.8 | TON |
$300.00 |
$521.24 |
$511.00 |
$511.50 |
| 25 | 501(G) 6309 |
CLSM BACKFILL | 1.6 | CY |
$500.00 |
$229.36 |
$1,000.00 |
$500.00 |
| 26 | 504(A) 1304 |
APPROACH SLAB | 106.2 | SY |
$250.00 |
$229.36 |
$375.00 |
$388.00 |
| 27 | 504(B) 1305 |
SAW-CUT GROOVING | 106.2 | SY |
$20.00 |
$43.20 |
$18.00 |
$25.00 |
| 28 | 504(C) 6250 |
SEALED EXPANSION JOINT | 72 | LF |
$350.00 |
$353.87 |
$425.00 |
$295.00 |
| 29 | 504(E) 1381 |
CONCRETE PARAPET | 56 | LF |
$200.00 |
$511.15 |
$350.00 |
$200.00 |
| 30 | 505(A) 6065 |
BRIDGE DECK CONCRETE OVERLAY | 543 | SY |
$140.00 |
$137.62 |
$135.00 |
$222.00 |
| 31 | 505(E) 1000 |
HYDRODEMOLITION | 543 | SY |
$160.00 |
$31.98 |
$175.00 |
$177.00 |
| 32 | 509 6152 |
SPECIAL CONCRETE FINISH | 99.4 | SY |
$40.00 |
$35.39 |
$80.00 |
$50.00 |
| 33 | 509(A) 1326 |
CLASS AA CONCRETE | 9.8 | CY |
$3,000.00 |
$583.24 |
$2,500.00 |
$3,700.00 |
| 34 | 509(B) 1328 |
CLASS A CONCRETE | 7.1 | CY |
$4,000.00 |
$1,802.14 |
$3,500.00 |
$4,400.00 |
| 35 | 511(A) 1332 |
REINFORCING STEEL | 3,040 | LB |
$1.20 |
$2.62 |
$2.00 |
$2.22 |
| 36 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 70 | SY |
$150.00 |
$517.71 |
$150.00 |
$150.00 |
| 37 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 20 | LF |
$35.00 |
$65.53 |
$39.00 |
$39.60 |
| 38 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 0.2 | GAL |
$150.00 |
$655.30 |
$150.00 |
$165.00 |
| 39 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 21 | SY |
$700.00 |
$1,308.03 |
$715.00 |
$715.00 |
| 40 | 523(A) 6550 |
SEALER CRACK PREPARATION | 180 | LF |
$5.00 |
$10.49 |
$5.00 |
$5.50 |
| 41 | 523(B) 6560 |
SEALER RESIN | 1.2 | GAL |
$100.00 |
$327.66 |
$75.00 |
$110.00 |
| 42 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 56.9 | SY |
$45.00 |
$39.32 |
$50.00 |
$49.50 |
| 43 | 540 4505 |
(PL)REPAIR BRIDGE ITEMS | 1 | EA |
$6,000.00 |
$3,931.94 |
$9,000.00 |
$5,300.00 |
| 44 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 500 | LF |
$18.00 |
$19.66 |
$19.00 |
$18.15 |
| 45 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 2 | EA |
$550.00 |
$1,435.16 |
$850.00 |
$825.00 |
| 46 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 2 | EA |
$2,200.00 |
$2,745.81 |
$2,300.00 |
$2,227.50 |
| 47 | 623(I) 8690 |
GUARDRAIL BRIDGE CONN-TRAIL END (31") | 2 | EA |
$1,000.00 |
$2,391.93 |
$800.00 |
$786.50 |
| 48 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 2 | EA |
$1,800.00 |
$2,359.17 |
$1,900.00 |
$1,870.00 |
| 49 | 823 8478 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 120 | SD |
$180.00 |
$327.66 |
$132.00 |
$137.50 |
| 50 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 1,750 | LF |
$0.6000 |
$2.62 |
$3.30 |
$3.30 |
| 51 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 4,244 | LF |
$0.7500 |
$1.31 |
$0.5500 |
$0.5500 |
| 52 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 500 | EA |
$0.6000 |
$0.6600 |
$1.10 |
$1.10 |
| 53 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 4,800 | LF |
$0.4000 |
$0.1300 |
$0.2800 |
$0.2800 |
| 54 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 240 | SD |
$12.50 |
$19.66 |
$5.50 |
$5.50 |
| 55 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 720 | LF |
$25.00 |
$44.56 |
$30.00 |
$27.50 |
| 56 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 720 | LF |
$7.50 |
$4.59 |
$5.00 |
$2.75 |
| 57 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,420 | SD |
$0.2500 |
$0.1300 |
$1.10 |
$1.10 |
| 58 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 540 | SD |
$0.6000 |
$2.62 |
$2.20 |
$2.20 |
| 59 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,080 | SD |
$1.10 |
$3.93 |
$3.30 |
$3.30 |
| 60 | 880(C) 8848 |
WING BARRICADES | 180 | SD |
$1.00 |
$2.62 |
$2.20 |
$2.20 |
| 61 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 1,800 | SD |
$0.2000 |
$0.4600 |
$1.10 |
$1.10 |
| 62 | 880(F) 8878 |
DRUMS | 2,340 | SD |
$0.2500 |
$0.7200 |
$0.2800 |
$0.2800 |
| 63 | 880(G) 8890 |
CHANNELIZER CONES | 1,800 | SD |
$0.2200 |
$0.7200 |
$0.2800 |
$0.2800 |
| 64 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 240 | SD |
$20.00 |
$45.87 |
$11.00 |
$11.00 |
| 65 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$70,000.00 |
$82,341.34 |
$68,801.00 |
$77,500.00 |