| 1 | 407(B) 0250 |
TACK COAT | 8,775 | GAL |
$3.00 |
$2.60 |
$3.00 |
$3.35 |
| 2 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 11,360 | TON |
$94.00 |
$92.00 |
$95.49 |
$112.45 |
| 3 | 411(I) 6310 |
SUPERPAVE, TYPE S4(PATCH)(PG64-22OK) | 250 | TON |
$125.00 |
$130.00 |
$95.49 |
$187.00 |
| 4 | 412 5267 |
COLD MILLING PAVEMENT | 2,700 | SY |
$6.00 |
$3.00 |
$6.00 |
$6.30 |
| 5 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 50,700 | LF |
$0.1000 |
$0.1300 |
$0.1500 |
$0.3700 |
| 6 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 112,500 | LF |
$0.7000 |
$0.2800 |
$0.2800 |
$0.2800 |
| 7 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$14,000.00 |
$11,650.00 |
$23,400.00 |
$70,000.00 |
| 8 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$110,000.00 |
$77,000.00 |
$118,200.00 |
$186,000.00 |
| 9 | 407(B) 0250 |
TACK COAT | 7,850 | GAL |
$3.00 |
$2.60 |
$3.00 |
$3.35 |
| 10 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 12,250 | TON |
$94.00 |
$92.00 |
$95.49 |
$114.30 |
| 11 | 411(I) 6310 |
SUPERPAVE, TYPE S4(PATCH)(PG64-22OK) | 250 | TON |
$125.00 |
$130.00 |
$95.49 |
$187.00 |
| 12 | 412 5267 |
COLD MILLING PAVEMENT | 8,700 | SY |
$6.00 |
$3.00 |
$6.00 |
$3.30 |
| 13 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 50,500 | LF |
$0.1000 |
$0.1300 |
$0.1500 |
$0.3500 |
| 14 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 90,300 | LF |
$0.7000 |
$0.2800 |
$0.2800 |
$0.2800 |
| 15 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 800 | LF |
$2.50 |
$10.00 |
$10.00 |
$10.00 |
| 16 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 6 | EA |
$60.00 |
$200.00 |
$200.00 |
$200.00 |