| 1 | 502(C) 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$25,000.00 |
$30,000.00 |
$45,000.00 |
| 2 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 348.4 | LF |
$25.00 |
$61.25 |
$29.00 |
| 3 | 506(A) 1322 |
STRUCTURAL STEEL | 3,350 | LB |
$8.00 |
$9.69 |
$3.00 |
| 4 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 5 | EA |
$2,000.00 |
$3,500.00 |
$2,100.00 |
| 5 | 509(B) 1328 |
CLASS A CONCRETE | 94.4 | CY |
$800.00 |
$975.00 |
$1,705.00 |
| 6 | 509(D) 1331 |
CLASS C CONCRETE | 9.5 | CY |
$450.00 |
$750.00 |
$1,275.00 |
| 7 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 9,760 | LB |
$1.20 |
$1.50 |
$3.30 |
| 8 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 33.8 | SY |
$400.00 |
$750.00 |
$320.00 |
| 9 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 64.3 | SY |
$650.00 |
$1,000.00 |
$720.00 |
| 10 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 110 | SY |
$5.00 |
$5.00 |
$4.50 |
| 11 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 70 | LF |
$1,500.00 |
$1,600.00 |
$1,475.00 |
| 12 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$5,000.00 |
$4,500.00 |
$8,000.00 |
| 13 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 20 | LF |
$50.00 |
$50.00 |
$23.00 |
| 14 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 2 | GAL |
$91.50 |
$100.00 |
$110.00 |
| 15 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 10.4 | SY |
$800.00 |
$1,637.50 |
$690.00 |
| 16 | 523(A) 6550 |
SEALER CRACK PREPARATION | 105.5 | LF |
$4.50 |
$5.00 |
$4.40 |
| 17 | 523(B) 6560 |
SEALER RESIN | 2 | GAL |
$150.00 |
$175.00 |
$165.00 |
| 18 | 535 6225 |
HAUL AND ERECT STEEL BEAMS | 1 | LSUM |
$80,000.00 |
$50,000.00 |
$112,500.00 |
| 19 | 542 4600 |
(PL)INSTALLATION OF BRIDGE ITEMS | 1 | LSUM |
$15,000.00 |
$15,500.00 |
$42,500.00 |
| 20 | 545 4805 |
(PL)REPLACE BRIDGE ITEMS | 10 | EA |
$150.00 |
$120.00 |
$385.00 |
| 21 | 601(A) 1351 |
TYPE I PLAIN RIPRAP | 261 | TON |
$60.00 |
$58.80 |
$113.00 |
| 22 | 619(B) 2510 |
REMOVAL OF BRIDGE ITEM (TYPE A) | 1 | LSUM |
$40,000.00 |
$30,000.00 |
$16,500.00 |
| 23 | 619(B) 2520 |
REMOVAL OF BRIDGE ITEM (TYPE B) | 1 | LSUM |
$20,000.00 |
$20,000.00 |
$6,600.00 |
| 24 | 823 8478 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 90 | SD |
$200.00 |
$156.25 |
$125.00 |
| 25 | 855(A) 8840 |
TRAFFIC STRIPE(PLASTIC)(THIN LINE)(4" WIDE) | 3,590 | LF |
$1.00 |
$1.88 |
$1.00 |
| 26 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 90 | SD |
$15.00 |
$37.50 |
$6.60 |
| 27 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 787.5 | LF |
$22.00 |
$45.00 |
$22.75 |
| 28 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 787.5 | LF |
$5.00 |
$6.00 |
$3.30 |
| 29 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$2,500.00 |
$12,000.00 |
$19,500.00 |
| 30 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$6,000.00 |
$6,000.00 |
$3,500.00 |
| 31 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$53,000.00 |
$52,500.00 |
$70,000.00 |