| 1 | 407(C) 0301 |
(SP) POLYMER MODIFIED CATIONIC RAPID SET - 1S | 37,547 | GAL |
$3.25 |
$2.58 |
$2.35 |
| 2 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 23,934 | TON |
$80.00 |
$79.82 |
$95.44 |
| 3 | 412 5267 |
COLD MILLING PAVEMENT | 2,668 | SY |
$6.00 |
$3.35 |
$2.82 |
| 4 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,750 | LF |
$10.00 |
$2.49 |
$2.00 |
| 5 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 750 | LF |
$25.00 |
$22.66 |
$19.75 |
| 6 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 20 | EA |
$3,000.00 |
$2,435.90 |
$2,180.00 |
| 7 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 139,845 | LF |
$0.6500 |
$0.2900 |
$0.2600 |
| 8 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 1,200 | LF |
$1.80 |
$2.27 |
$2.00 |
| 9 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 40 | LF |
$5.00 |
$22.66 |
$20.00 |
| 10 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 2 | EA |
$160.00 |
$254.92 |
$225.00 |
| 11 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$4,500.00 |
$10,349.71 |
$10,550.60 |