| 1 | 407(B) 0250 |
TACK COAT | 63 | GAL |
$5.00 |
$55.00 |
$55.00 |
$55.00 |
| 2 | 408 5774 |
PRIME COAT | 96 | GAL |
$20.00 |
$55.00 |
$55.00 |
$55.00 |
| 3 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 146 | TON |
$150.00 |
$385.00 |
$385.00 |
$375.00 |
| 4 | 509(D) 0325 |
CLASS C CONCRETE | 5 | CY |
$400.00 |
$1,000.00 |
$1,200.00 |
$1,500.00 |
| 5 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 335 | SY |
$10.00 |
$20.00 |
$59.00 |
$50.00 |
| 6 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 290 | LF |
$5.00 |
$3.00 |
$5.00 |
$4.00 |
| 7 | 623 0100 |
(PL)GUARDRAIL CURBING | 1 | EA |
$500.00 |
$800.00 |
$2,850.00 |
$1,400.00 |
| 8 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 513 | LF |
$20.00 |
$16.00 |
$15.79 |
$16.00 |
| 9 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 2 | EA |
$1,500.00 |
$550.00 |
$2,088.90 |
$535.00 |
| 10 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 2 | EA |
$2,500.00 |
$2,100.00 |
$1,463.00 |
$2,000.00 |
| 11 | 623(I) 8690 |
GUARDRAIL BRIDGE CONN-TRAIL END (31") | 2 | EA |
$2,000.00 |
$655.00 |
$550.00 |
$630.00 |
| 12 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 2 | EA |
$3,000.00 |
$1,500.00 |
$654.50 |
$1,400.00 |
| 13 | 853 9066 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 20 | EA |
$10.00 |
$20.00 |
$11.00 |
$10.50 |
| 14 | 501(G) 6309 |
CLSM BACKFILL | 8 | CY |
$200.00 |
$525.00 |
$175.00 |
$350.00 |
| 15 | 504(C) 6250 |
SEALED EXPANSION JOINT | 156 | LF |
$300.00 |
$300.00 |
$215.00 |
$220.00 |
| 16 | 504(E) 1381 |
CONCRETE PARAPET | 64 | LF |
$160.00 |
$200.00 |
$360.00 |
$285.00 |
| 17 | 509(A) 1326 |
CLASS AA CONCRETE | 40.4 | CY |
$800.00 |
$1,200.00 |
$2,500.00 |
$2,500.00 |
| 18 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 6,550 | LB |
$1.30 |
$1.50 |
$0.9000 |
$1.25 |
| 19 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 15 | SY |
$450.00 |
$300.00 |
$250.00 |
$560.00 |
| 20 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 60 | SY |
$5.00 |
$5.00 |
$6.60 |
$20.00 |
| 21 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 429 | LF |
$50.00 |
$20.00 |
$28.16 |
$35.00 |
| 22 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 34.2 | GAL |
$200.00 |
$80.00 |
$71.50 |
$60.00 |
| 23 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 55.9 | SY |
$750.00 |
$450.00 |
$590.56 |
$700.00 |
| 24 | 523(C) 6570 |
DECK AREA SEALED (FLOODCOATS) | 4,766 | SY |
$17.00 |
$12.00 |
$12.38 |
$17.00 |
| 25 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 704 | SF |
$35.00 |
$30.00 |
$42.10 |
$67.00 |
| 26 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$25,000.00 |
$7,000.00 |
$34,000.00 |
$60,000.00 |
| 27 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 7,620 | LF |
$1.25 |
$0.5500 |
$0.8900 |
$0.8100 |
| 28 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 2,290 | LF |
$0.6000 |
$1.00 |
$0.8300 |
$0.7500 |
| 29 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 5,020 | LF |
$0.3000 |
$0.3300 |
$0.3300 |
$0.3000 |
| 30 | 870(A) 8485 |
SAND FILLED IMPACT ATTENUATION MODULE | 1,500 | SD |
$1.50 |
$1.25 |
$0.5500 |
$0.5000 |
| 31 | 877(A) 8483 |
PORTABLE LONGITUDINAL BARRIER | 2,350 | LF |
$35.00 |
$30.00 |
$19.42 |
$18.00 |
| 32 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 2,350 | LF |
$10.00 |
$2.00 |
$2.20 |
$2.50 |
| 33 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 100 | SD |
$15.00 |
$6.00 |
$5.50 |
$5.00 |
| 34 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 13,800 | SD |
$0.4000 |
$0.5500 |
$0.3300 |
$0.3000 |
| 35 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,800 | SD |
$0.7000 |
$0.5500 |
$0.1100 |
$0.1000 |
| 36 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 400 | SD |
$2.30 |
$3.85 |
$4.95 |
$4.50 |
| 37 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 200 | SD |
$0.6000 |
$3.85 |
$2.20 |
$2.00 |
| 38 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 2,000 | SD |
$0.2000 |
$0.0600 |
$0.1100 |
$0.1000 |
| 39 | 880(F) 8878 |
DRUMS | 4,500 | SD |
$0.3000 |
$0.0600 |
$0.1100 |
$0.1000 |
| 40 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$50,000.00 |
$44,114.00 |
$67,000.00 |
$55,000.00 |