| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 1,700 | CY |
$5.00 |
$9.00 |
$8.50 |
$11.65 |
| 2 | 202(E) 0186 |
SELECT BORROW | 2,000 | CY |
$10.00 |
$4.00 |
$8.50 |
$19.70 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$7,500.00 |
$5,000.00 |
$10,000.00 |
$17,400.00 |
| 4 | 232(A) 2813 |
SEEDING METHOD A | 3.5 | AC |
$1,250.00 |
$2,400.00 |
$2,450.00 |
$1,465.00 |
| 5 | 402(D) 0223 |
TRAFFIC BOUND SURFACE COURSE TYPE D | 2,883 | TON |
$19.00 |
$21.00 |
$24.00 |
$32.50 |
| 6 | 408 5774 |
PRIME COAT | 5,400 | GAL |
$5.00 |
$0.5000 |
$4.25 |
$4.70 |
| 7 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 4,033 | TON |
$80.00 |
$73.00 |
$83.50 |
$84.00 |
| 8 | 412 5267 |
COLD MILLING PAVEMENT | 31,306 | SY |
$1.25 |
$0.9500 |
$1.40 |
$1.25 |
| 9 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 400 | LF |
$3.00 |
$6.00 |
$3.00 |
$3.10 |
| 10 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 600 | LF |
$16.00 |
$17.00 |
$17.25 |
$16.20 |
| 11 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 12 | EA |
$1,900.00 |
$2,400.00 |
$2,400.00 |
$2,300.00 |
| 12 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 22 | EA |
$85.00 |
$110.00 |
$110.00 |
$102.75 |
| 13 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 3 | EA |
$200.00 |
$155.00 |
$165.00 |
$154.10 |
| 14 | 629(C) 4960 |
MAILBOX | 28 | EA |
$40.00 |
$26.00 |
$27.00 |
$25.70 |
| 15 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 27 | EA |
$25.00 |
$39.00 |
$55.00 |
$102.75 |
| 16 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 20 | SF |
$35.00 |
$21.00 |
$22.00 |
$20.55 |
| 17 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 48 | LF |
$10.00 |
$11.00 |
$11.00 |
$10.30 |
| 18 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 20 | EA |
$19.00 |
$15.00 |
$15.00 |
$14.40 |
| 19 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 50,437 | LF |
$0.1300 |
$0.1100 |
$0.1200 |
$0.1100 |
| 20 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 16 | LF |
$12.00 |
$29.00 |
$27.00 |
$25.70 |
| 21 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$8,000.00 |
$1,700.00 |
$1,650.00 |
$11,150.00 |
| 22 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$5,000.00 |
$7,000.00 |
$8,000.00 |
$7,700.00 |
| 23 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$35,000.00 |
$12,000.00 |
$10,000.00 |
$37,000.00 |