BRIDGE REHABILITATION SH -10: OVER THE ILLINOIS RIVER AND DEEP BRANCH CREEK, 1.9 AND 2.2 MILES EAST OF THE MUSKOGEE COUNTY LINE .

Let date
Thursday, September 15, 2011
Contract
110449
J/P numbers
27993(04)
District
Division 1
County
Sequoyah
Highway
Limits
BRIDGE REHABILITATION SH -10: OVER THE ILLINOIS RIVER AND DEEP BRANCH CREEK, 1.9 AND 2.2 MILES EAST OF THE MUSKOGEE COUNTY LINE .
Project number
SBR-168C(210)SB

Bidders 2

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$1,895,035
1 WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES Low bidder $2,489,578 +31.4%
2 SCR CONSTRUCTION CO., INC. $3,163,789 +67.0% +27.1%

Bid tab: unit prices 81 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 WILDCAT CONSTRU…#2 SCR CONSTRUCTIO…
1303(A) 2100 AGGREGATE BASE TYPE A82CY $75.00 $190.00 $250.00
2411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)64TON $150.00 $300.00 $270.00
3412 5267 COLD MILLING PAVEMENT188SY $12.00 $20.00 $20.00
4414(B) 5725 DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT )1,468SY $25.00 $38.00 $75.00
5414(G) 5275 P.C. CONCRETE FOR PAVEMENT368CY $175.00 $195.00 $180.00
6619(B) 4727 REMOVAL OF CONCRETE PAVEMENT1,468SY $6.00 $22.00 $40.00
7619(B) 4780 REMOVAL OF GUARDRAIL700LF $5.00 $3.00 $5.00
8623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE550LF $20.00 $15.00 $25.00
9623(G) 8571 GUARDRAIL END TREATMENT (GET)4EA $2,500.00 $2,100.00 $2,500.00
10623(I) 8675 GUARDRAIL BRIDGE CONNECTION-TYPE A4EA $2,000.00 $1,300.00 $2,000.00
11303(A) 2100 AGGREGATE BASE TYPE A52CY $75.00 $190.00 $250.00
12411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)48TON $150.00 $300.00 $270.00
13412 5267 COLD MILLING PAVEMENT294SY $12.00 $20.00 $20.00
14414(B) 5725 DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT )1,468SY $25.00 $38.00 $75.00
15414(G) 5275 P.C. CONCRETE FOR PAVEMENT368CY $175.00 $195.00 $180.00
16619(B) 4727 REMOVAL OF CONCRETE PAVEMENT1,468SY $6.00 $22.00 $40.00
17619(B) 4780 REMOVAL OF GUARDRAIL700LF $5.00 $3.00 $5.00
18623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE550LF $20.00 $15.00 $25.00
19623(G) 8571 GUARDRAIL END TREATMENT (GET)4EA $2,500.00 $2,100.00 $2,500.00
20623(I) 8675 GUARDRAIL BRIDGE CONNECTION-TYPE A4EA $2,000.00 $1,300.00 $2,000.00
21501(G) 6309 CLSM BACKFILL14CY $150.00 $205.00 $300.00
22504(A) 1304 APPROACH SLAB215.6SY $175.00 $215.00 $200.00
23504(B) 1305 SAW-CUT GROOVING1,953.7SY $5.00 $3.60 $10.00
24504(C) 6250 SEALED EXPANSION JOINT66.8LF $250.00 $345.00 $300.00
25504(D) 6245 CONCRETE RAIL (TR4)1,165.8LF $75.00 $125.00 $120.00
26506(A) 1322 STRUCTURAL STEEL10,271LB $3.00 $5.10 $6.00
27509(A) 1326 CLASS AA CONCRETE436.8CY $700.00 $885.00 $1,200.00
28511(B) 6010 EPOXY COATED REINFORCING STEEL119,693LB $1.00 $1.30 $1.30
29512(A) 1323 PAINTING EXISTING STRUCTURES1LSUM $63,000.00 $56,000.00 $62,000.00
30512(B) 6303 COLLECTION AND HANDLING OF WASTE1LSUM $7,000.00 $3,300.00 $4,000.00
31515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)990SY $4.00 $3.00 $3.35
32520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER12LF $35.00 $45.00 $47.00
33520(C) 6060 EPOXY RESIN, ABOVE WATER0.4GAL $90.00 $100.00 $105.00
34521(A) 6210 PNEUMATICALLY PLACED MORTAR2.2SY $500.00 $575.00 $800.00
35523(A) 6550 SEALER CRACK PREPARATION194.1LF $5.00 $4.00 $4.50
36523(B) 6560 SEALER RESIN1.8GAL $175.00 $100.00 $210.00
37540 4515 (PL)REPAIR BRIDGE ITEM (TYPE A)2EA $15,000.00 $9,800.00 $11,000.00
38540 4535 (PL)REPAIR BRIDGE ITEM (TYPE C)5EA $1,500.00 $345.00 $500.00
39601(A) 1351 TYPE I PLAIN RIPRAP40TON $40.00 $71.00 $300.00
40619(B) 2500 REMOVAL OF BRIDGE ITEMS1LSUM $200,000.00 $250,000.00 $430,000.00
41501(G) 6309 CLSM BACKFILL12CY $150.00 $205.00 $300.00
42504(A) 1304 APPROACH SLAB215.6SY $175.00 $215.00 $200.00
43504(B) 1305 SAW-CUT GROOVING1,010.2SY $5.00 $3.60 $10.00
44504(C) 6250 SEALED EXPANSION JOINT100.2LF $250.00 $345.00 $300.00
45504(D) 6245 CONCRETE RAIL (TR4)603.2LF $75.00 $125.00 $120.00
46506(A) 1322 STRUCTURAL STEEL3,227LB $3.00 $4.40 $6.00
47507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY1EA $2,500.00 $1,300.00 $1,500.00
48507(B) 6176 WEATHERING STEEL EXPANSION BEARING ASSEMBLY7EA $2,500.00 $1,300.00 $1,500.00
49509(A) 1326 CLASS AA CONCRETE199CY $700.00 $885.00 $1,200.00
50511(B) 6010 EPOXY COATED REINFORCING STEEL48,281LB $1.00 $1.30 $1.00
51512(A) 1323 PAINTING EXISTING STRUCTURES1LSUM $29,000.00 $24,500.00 $28,000.00
52512(B) 6303 COLLECTION AND HANDLING OF WASTE1LSUM $4,000.00 $2,550.00 $4,000.00
53515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)488SY $4.00 $3.00 $3.20
54520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER14.4LF $35.00 $45.00 $46.00
55520(C) 6060 EPOXY RESIN, ABOVE WATER0.5GAL $100.00 $100.00 $105.00
56521(A) 6210 PNEUMATICALLY PLACED MORTAR2SY $500.00 $575.00 $800.00
57540 4525 (PL)REPAIR BRIDGE ITEM (TYPE B)7EA $1,000.00 $205.00 $210.00
58601(A) 1351 TYPE I PLAIN RIPRAP40TON $40.00 $71.00 $300.00
59619(B) 2500 REMOVAL OF BRIDGE ITEMS1LSUM $95,000.00 $150,000.00 $280,000.00
60877(A) 8483 PORTABLE LONGITUDINAL BARRIER38LF $35.00 $39.00 $40.00
61877(C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER38LF $5.00 $0.00 $40.00
62880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF10,920SD $0.5000 $0.3500 $0.5000
63880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF720SD $1.50 $0.7500 $1.00
64880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF600SD $3.00 $1.30 $1.50
65880(B) 8827 CONSTRUCTION SIGNS 33.0 SF & OVER300SD $4.00 $5.00 $5.40
66880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)600SD $1.00 $1.00 $1.10
67880(E) 8860 WARNING LIGHTS(TYPE A)1,800SD $0.2500 $0.3000 $0.3500
68882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN120SD $10.00 $18.00 $20.00
69877(A) 8483 PORTABLE LONGITUDINAL BARRIER38LF $35.00 $39.00 $40.00
70877(C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER38LF $5.00 $3.00 $40.00
71880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF10,920SD $0.5000 $0.3500 $0.5000
72880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF720SD $1.50 $0.7500 $1.00
73880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF600SD $3.00 $1.30 $1.50
74880(B) 8827 CONSTRUCTION SIGNS 33.0 SF & OVER300SD $4.00 $5.00 $5.40
75880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)600SD $1.00 $1.00 $1.10
76880(E) 8860 WARNING LIGHTS(TYPE A)1,800SD $0.2500 $0.3000 $0.3500
77882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN120SD $10.00 $18.00 $20.00
78855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)4,092LF $1.25 $0.9000 $1.00
79855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)2,168LF $1.25 $0.9000 $1.00
80642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $30,000.00 $5,350.00 $15,000.00
81641 1399 MOBILIZATION1LSUM $115,000.00 $250,000.00 $183,000.00