| 1 | 202(D) 4781 |
UNCLASSIFIED BORROW (TOPSOIL) | 1,500 | CY |
$5.00 |
$14.50 |
$13.50 |
$1.00 |
| 2 | 407(C) 0300 |
POLYMER MODIFIED CATIONIC RAPID SET - 1 | 25,500 | GAL |
$3.00 |
$3.20 |
$2.75 |
$2.50 |
| 3 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 9,300 | TON |
$62.00 |
$66.25 |
$71.25 |
$85.00 |
| 4 | 411(E) 5990 |
SUPERPAVE, TYPE S6(PG 64-22 OK) | 400 | TON |
$85.00 |
$70.00 |
$77.25 |
$92.50 |
| 5 | 412 5267 |
COLD MILLING PAVEMENT | 2,800 | SY |
$3.00 |
$2.05 |
$2.35 |
$5.00 |
| 6 | 413(B) 4862 |
RUMBLE STRIP-METHOD HMA-CYC GROUP | 8 | EAGP |
$500.00 |
$892.50 |
$1,200.00 |
$1,850.00 |
| 7 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 600 | LF |
$2.00 |
$1.60 |
$1.60 |
$1.50 |
| 8 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 50 | LF |
$15.00 |
$16.30 |
$15.75 |
$15.50 |
| 9 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 8 | EA |
$2,200.00 |
$2,094.75 |
$2,000.00 |
$1,995.00 |
| 10 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 56 | LF |
$25.00 |
$36.75 |
$38.00 |
$35.00 |
| 11 | 504(H) 6389 |
ELASTOMERIC MORTAR | 4.1 | CF |
$500.00 |
$840.00 |
$850.00 |
$800.00 |
| 12 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 20 | SY |
$300.00 |
$351.75 |
$300.00 |
$335.00 |
| 13 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 1 | SY |
$500.00 |
$1,064.70 |
$1,000.00 |
$2,000.00 |
| 14 | 623(H) 0940 |
GUARDRAIL BLOCKOUT REPLACEMENT | 450 | LF |
$4.00 |
$3.15 |
$3.25 |
$3.00 |
| 15 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 62 | EA |
$12.00 |
$6.30 |
$6.50 |
$6.00 |
| 16 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 88,000 | LF |
$0.5500 |
$0.7500 |
$0.7100 |
$0.7000 |
| 17 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 100 | LF |
$5.00 |
$10.50 |
$10.50 |
$10.00 |
| 18 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$7,906.00 |
$6,000.00 |
$50,000.00 |
| 19 | 202(D) 4781 |
UNCLASSIFIED BORROW (TOPSOIL) | 1,000 | CY |
$5.00 |
$14.50 |
$13.50 |
$1.00 |
| 20 | 407(C) 0300 |
POLYMER MODIFIED CATIONIC RAPID SET - 1 | 20,500 | GAL |
$3.00 |
$3.20 |
$2.75 |
$2.50 |
| 21 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 8,000 | TON |
$62.00 |
$66.25 |
$71.25 |
$85.00 |
| 22 | 412 5267 |
COLD MILLING PAVEMENT | 600 | SY |
$2.00 |
$2.05 |
$2.35 |
$5.00 |
| 23 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 300 | LF |
$2.00 |
$1.60 |
$1.60 |
$1.50 |
| 24 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 75 | LF |
$15.00 |
$16.30 |
$15.75 |
$15.50 |
| 25 | 623(C) 5202 |
BEAM GUARDRAIL THRIE-BEAM SINGLE | 62.5 | LF |
$30.00 |
$47.00 |
$50.00 |
$45.00 |
| 26 | 623(D) 5203 |
BEAM GUARDRAIL THRIE-BEAM DOUBLE | 50 | LF |
$50.00 |
$47.00 |
$50.00 |
$45.00 |
| 27 | 623(E) 7113 |
BEAM GUARDRAIL TRANSITION SECTION | 4 | EA |
$1,500.00 |
$204.75 |
$200.00 |
$195.00 |
| 28 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,200.00 |
$2,094.75 |
$2,000.00 |
$1,995.00 |
| 29 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 20 | EA |
$12.00 |
$6.30 |
$6.50 |
$6.00 |
| 30 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 98,000 | LF |
$0.5000 |
$0.7500 |
$0.7100 |
$0.7000 |
| 31 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$7,906.00 |
$6,000.00 |
$50,000.00 |
| 32 | 202(D) 4781 |
UNCLASSIFIED BORROW (TOPSOIL) | 1,000 | CY |
$5.00 |
$14.50 |
$13.50 |
$1.00 |
| 33 | 407(C) 0300 |
POLYMER MODIFIED CATIONIC RAPID SET - 1 | 22,800 | GAL |
$3.00 |
$3.20 |
$2.75 |
$2.50 |
| 34 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 8,900 | TON |
$62.00 |
$66.25 |
$71.25 |
$84.75 |
| 35 | 412 5267 |
COLD MILLING PAVEMENT | 9,500 | SY |
$2.00 |
$2.05 |
$2.35 |
$5.00 |
| 36 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,850 | LF |
$2.00 |
$1.60 |
$1.60 |
$1.50 |
| 37 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 200 | LF |
$15.00 |
$16.30 |
$15.75 |
$15.50 |
| 38 | 623(C) 5202 |
BEAM GUARDRAIL THRIE-BEAM SINGLE | 250 | LF |
$30.00 |
$47.00 |
$50.00 |
$45.00 |
| 39 | 623(D) 5203 |
BEAM GUARDRAIL THRIE-BEAM DOUBLE | 100 | LF |
$50.00 |
$47.00 |
$50.00 |
$45.00 |
| 40 | 623(E) 7113 |
BEAM GUARDRAIL TRANSITION SECTION | 8 | EA |
$1,500.00 |
$204.75 |
$200.00 |
$195.00 |
| 41 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 8 | EA |
$2,200.00 |
$2,094.75 |
$2,000.00 |
$1,995.00 |
| 42 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 46 | EA |
$12.00 |
$6.30 |
$6.50 |
$6.00 |
| 43 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 100,000 | LF |
$0.5000 |
$0.7500 |
$0.7100 |
$0.7000 |
| 44 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 60 | LF |
$5.00 |
$10.50 |
$10.50 |
$10.00 |
| 45 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$7,906.00 |
$6,000.00 |
$50,000.00 |