| 1 | 201 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$10,000.00 |
$10,000.00 |
$12,000.00 |
| 2 | 202(C) 0184 |
UNCLASSIFIED BORROW | 3,960 | CY |
$15.00 |
$8.00 |
$15.00 |
$36.00 |
| 3 | 205 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$7,500.00 |
$2,000.00 |
$5,000.00 |
$12,000.00 |
| 4 | 223 2801 |
TEMPORARY SILT FENCE | 880 | LF |
$3.00 |
$3.00 |
$5.00 |
$2.00 |
| 5 | 227 0100 |
TEMPORARY SILT DIKE | 60 | LF |
$8.00 |
$6.00 |
$25.00 |
$7.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 2,540 | SY |
$3.00 |
$2.50 |
$7.00 |
$3.00 |
| 7 | 303 0192 |
AGGREGATE BASE | 220 | CY |
$42.00 |
$75.00 |
$50.00 |
$85.00 |
| 8 | 408 5774 |
PRIME COAT | 340 | GAL |
$7.00 |
$8.00 |
$10.00 |
$10.00 |
| 9 | 411(S3) 5945 |
(SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) | 130 | TON |
$150.00 |
$150.00 |
$150.00 |
$200.00 |
| 10 | 411(S4) 5960 |
(SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | 242 | TON |
$150.00 |
$150.00 |
$150.00 |
$200.00 |
| 11 | 417 5267 |
COLD MILLING PAVEMENT | 536 | SY |
$8.00 |
$10.00 |
$15.00 |
$16.00 |
| 12 | 509(D) 0325 |
CLASS C CONCRETE | 5 | CY |
$500.00 |
$500.00 |
$400.00 |
$1,400.00 |
| 13 | 613(D) 0690 |
24" CORR. GALV. STEEL PIPE | 30 | LF |
$30.00 |
$30.00 |
$50.00 |
$50.00 |
| 14 | 613(M) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$600.00 |
$250.00 |
$2,000.00 |
$300.00 |
| 15 | 623(A) 0932 |
BEAM GUARD RAIL-W-BEAM-SINGLE | 200 | LF |
$20.00 |
$20.00 |
$25.00 |
$17.00 |
| 16 | 623(E) 7114 |
THRIE BEAM BRIDGE CONNECTION-TYPE A | 4 | EA |
$2,000.00 |
$2,000.00 |
$2,500.00 |
$1,800.00 |
| 17 | 623(H) 8571 |
(SP)G.E.T. GUARD RAIL END SECTION | 4 | EA |
$2,500.00 |
$2,500.00 |
$2,500.00 |
$2,500.00 |
| 18 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 60 | CY |
$20.00 |
$10.00 |
$15.00 |
$50.00 |
| 19 | 501(G) 6309 |
CLSM BACKFILL | 42 | CY |
$150.00 |
$150.00 |
$250.00 |
$230.00 |
| 20 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$10,000.00 |
$10,000.00 |
$20,000.00 |
$34,000.00 |
| 21 | 504(A) 1304 |
APPROACH SLAB | 187.4 | SY |
$165.00 |
$170.00 |
$75.00 |
$225.00 |
| 22 | 504(C) 6250 |
SEALED EXPANSION JOINT | 43.2 | LF |
$250.00 |
$300.00 |
$100.00 |
$300.00 |
| 23 | 504(E) 6245 |
CONCRETE RAIL (TR4) | 282.4 | LF |
$80.00 |
$75.00 |
$125.00 |
$135.00 |
| 24 | 506(A) 1322 |
STRUCTURAL STEEL | 25,580 | LB |
$2.50 |
$2.40 |
$3.00 |
$3.10 |
| 25 | 509(A) 1326 |
CLASS AA CONCRETE | 115.1 | CY |
$650.00 |
$800.00 |
$800.00 |
$1,200.00 |
| 26 | 509(B) 1328 |
CLASS A CONCRETE | 51.4 | CY |
$700.00 |
$850.00 |
$800.00 |
$1,200.00 |
| 27 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 33,350 | LB |
$0.9500 |
$1.40 |
$2.00 |
$1.40 |
| 28 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$15,000.00 |
$15,000.00 |
$35,000.00 |
$15,000.00 |
| 29 | 514(A) 6012 |
PILES, FURNISHED (HP 14X73) | 250 | LF |
$40.00 |
$65.00 |
$50.00 |
$40.00 |
| 30 | 514(B) 6296 |
PILES, DRIVEN (HP 14X73) | 250 | LF |
$30.00 |
$15.00 |
$50.00 |
$105.00 |
| 31 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 356 | SY |
$4.00 |
$5.00 |
$5.00 |
$5.00 |
| 32 | 523(A) 6550 |
(SP) SEALER CRACK PREPARATION | 142 | LF |
$6.00 |
$7.00 |
$10.00 |
$6.00 |
| 33 | 523(B) 6560 |
(SP) SEALER RESIN | 3 | GAL |
$250.00 |
$300.00 |
$350.00 |
$220.00 |
| 34 | 535 6164 |
(PL)FIXED BEARING ASSEMBLY | 14 | EA |
$1,000.00 |
$1,400.00 |
$1,500.00 |
$2,000.00 |
| 35 | 535 6165 |
(PL)EXPANSION BEARING ASSEMBLY | 28 | EA |
$1,000.00 |
$1,600.00 |
$1,500.00 |
$2,000.00 |
| 36 | 601(A) 1351 |
TYPE I PLAIN RIPRAP | 260 | TON |
$60.00 |
$65.00 |
$75.00 |
$110.00 |
| 37 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$25,000.00 |
$50,000.00 |
$50,000.00 |
$95,000.00 |
| 38 | 627(G) 4316 |
RELOCATION OF PORTABLE TYPE PRECAST CONCRETE MEDIAN BARRIER | 750 | LF |
$5.00 |
$7.00 |
$10.00 |
$15.00 |
| 39 | 627(H) 5856 |
DELIVER PORTABLE TYPE PRECAST CONCRETE MEDIAN BARRIER | 1,500 | LF |
$15.00 |
$10.00 |
$28.00 |
$20.00 |
| 40 | 823 8478 |
(PL)PORTABLE TRAFFIC SIGNAL SYSTEM | 150 | SD |
$200.00 |
$120.00 |
$125.00 |
$110.00 |
| 41 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 1,850 | LF |
$1.00 |
$2.50 |
$2.00 |
$3.00 |
| 42 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$30,000.00 |
$35,000.00 |
$35,000.00 |
| 43 | 642 0098 |
STAKING | 1 | LSUM |
$15,000.00 |
$10,000.00 |
$10,000.00 |
$5,000.00 |
| 44 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$31,000.00 |
$30,000.00 |
$45,000.00 |
$46,000.00 |