| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 165 | CY |
$10.00 |
$8.00 |
$40.00 |
$39.11 |
$43.00 |
$72.85 |
| 2 | 202(C) 0184 |
UNCLASSIFIED BORROW | 92 | CY |
$10.00 |
$8.00 |
$22.00 |
$50.55 |
$40.00 |
$25.75 |
| 3 | 310(B) 0149 |
SUBGRADE, METHOD B | 415 | SY |
$5.00 |
$2.00 |
$2.00 |
$1.69 |
$5.50 |
$22.50 |
| 4 | 407 0250 |
TACK COAT | 350 | GAL |
$7.00 |
$3.00 |
$3.25 |
$2.42 |
$3.48 |
$5.85 |
| 5 | 411(S4) 5955 |
(SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) | 799 | TON |
$85.00 |
$75.00 |
$70.00 |
$81.27 |
$86.00 |
$82.50 |
| 6 | 414(B) 0288 |
6" H.E.S. CONCRETE PAVEMENT | 348 | SY |
$60.00 |
$55.00 |
$58.00 |
$49.70 |
$70.00 |
$64.50 |
| 7 | 414(B) 0290 |
8" H.E.S. CONCRETE PAVEMENT | 67 | SY |
$120.00 |
$75.00 |
$72.00 |
$123.57 |
$115.50 |
$99.50 |
| 8 | 417 4267 |
COLD MILLING BITUMINOUS PAVEMENT | 9,862 | SY |
$3.00 |
$1.50 |
$1.43 |
$1.60 |
$0.7300 |
$2.35 |
| 9 | 613(B) 4519 |
14" X 23" R.C.PIPE ELLIPTICAL CLASS HE-IV | 25 | LF |
$75.00 |
$50.00 |
$300.00 |
$186.76 |
$66.59 |
$115.86 |
| 10 | 613(M) 4504 |
21" X 15" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$500.00 |
$1,000.00 |
$1,500.00 |
$1,157.44 |
$995.71 |
$1,500.00 |
| 11 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 4,400 | LF |
$0.7500 |
$0.7500 |
$1.10 |
$0.7700 |
$1.65 |
$0.9500 |
| 12 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$2,500.00 |
$4,500.00 |
$2,636.73 |
$7,000.00 |
$1,770.00 |
| 13 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$11,600.00 |
$10,000.00 |
$10,000.00 |
$6,622.17 |
$15,000.00 |
$15,000.00 |