| 1 | 411(S4) 5960 |
(SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | 350 | TON |
$80.00 |
$85.00 |
$87.00 |
$140.00 |
$92.00 |
$225.00 |
| 2 | 417 5267 |
COLD MILLING PAVEMENT | 3,721 | SY |
$15.00 |
$10.00 |
$6.80 |
$13.00 |
$10.00 |
$4.50 |
| 3 | 619(B) 4780 |
REMOVAL OF GUARD RAIL | 160 | LF |
$5.00 |
$6.00 |
$3.00 |
$5.00 |
$4.00 |
$5.00 |
| 4 | 623(A) 0932 |
BEAM GUARD RAIL-W-BEAM-SINGLE | 400 | LF |
$15.00 |
$18.00 |
$14.00 |
$15.00 |
$14.00 |
$24.75 |
| 5 | 623(F) 5686 |
GUARD RAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,000.00 |
$1,300.00 |
$1,500.00 |
$1,600.00 |
$1,500.00 |
$2,590.00 |
| 6 | 623(H) 8571 |
(SP)G.E.T. GUARD RAIL END SECTION | 4 | EA |
$2,000.00 |
$1,800.00 |
$2,200.00 |
$2,300.00 |
$2,200.00 |
$2,590.00 |
| 7 | 501(G) 6309 |
CLSM BACKFILL | 20 | CY |
$225.00 |
$300.00 |
$485.00 |
$300.00 |
$270.00 |
$250.00 |
| 8 | 504(H) 6390 |
RAPID CURE JOINT SEALANT | 152 | LF |
$35.00 |
$30.00 |
$66.00 |
$40.00 |
$40.00 |
$28.00 |
| 9 | 504(I) 6389 |
ELASTOMERIC MORTAR | 25 | CF |
$800.00 |
$550.00 |
$326.00 |
$650.00 |
$705.00 |
$410.00 |
| 10 | 505(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 40 | SY |
$400.00 |
$200.00 |
$310.00 |
$115.00 |
$75.00 |
$320.00 |
| 11 | 505(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 25 | SY |
$500.00 |
$225.00 |
$5.00 |
$525.00 |
$200.00 |
$475.00 |
| 12 | 505(D) 6087 |
LATEX MODIFIED BRIDGE DECK OVERLAY | 410 | SY |
$90.00 |
$80.00 |
$89.88 |
$80.00 |
$115.00 |
$122.00 |
| 13 | 505(G) 1000 |
HYDRODEMOLITION | 410 | SY |
$70.00 |
$75.00 |
$112.00 |
$60.00 |
$83.00 |
$125.00 |
| 14 | 509(A) 1326 |
CLASS AA CONCRETE | 5 | CY |
$700.00 |
$2,000.00 |
$1,866.00 |
$1,800.00 |
$645.00 |
$900.00 |
| 15 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 950 | LB |
$1.25 |
$2.00 |
$2.26 |
$2.00 |
$2.50 |
$1.11 |
| 16 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$5,000.00 |
$10,000.00 |
$12,000.00 |
$14,000.00 |
$6,150.00 |
$10,000.00 |
| 17 | 512(B) 6303 |
COLLECTION & HANDLING OF WASTE | 1 | LSUM |
$5,000.00 |
$500.00 |
$3,800.00 |
$6,000.00 |
$8,750.00 |
$10,000.00 |
| 18 | 520(A) 6058 |
PREPARATION OF CRACKS ABOVE WATER | 100 | LF |
$50.00 |
$34.00 |
$30.00 |
$70.00 |
$33.10 |
$37.25 |
| 19 | 520(C) 6060 |
EPOXY RESIN ABOVE WATER | 1 | GAL |
$150.00 |
$80.00 |
$718.00 |
$100.00 |
$80.00 |
$90.00 |
| 20 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 20 | SY |
$450.00 |
$525.00 |
$138.00 |
$650.00 |
$522.30 |
$587.50 |
| 21 | 535 6386 |
(PL)SILICONE CONSTRUCTION JOINT | 131.5 | LF |
$20.00 |
$12.00 |
$48.00 |
$30.00 |
$6.70 |
$22.00 |
| 22 | 619(B) 2500 |
(PL)REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$15,000.00 |
$6,500.00 |
$3,670.00 |
$8,000.00 |
$9,750.00 |
$11,500.00 |
| 23 | 501(G) 6309 |
CLSM BACKFILL | 20 | CY |
$225.00 |
$300.00 |
$485.00 |
$300.00 |
$270.00 |
$250.00 |
| 24 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$25,000.00 |
$3,000.00 |
$6,680.00 |
$14,000.00 |
$32,500.00 |
$20,000.00 |
| 25 | 504(H) 6390 |
RAPID CURE JOINT SEALANT | 152 | LF |
$35.00 |
$30.00 |
$66.00 |
$40.00 |
$40.00 |
$30.00 |
| 26 | 504(I) 6389 |
ELASTOMERIC MORTAR | 25 | CF |
$800.00 |
$550.00 |
$326.00 |
$650.00 |
$705.00 |
$410.00 |
| 27 | 505(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 40 | SY |
$400.00 |
$200.00 |
$310.00 |
$115.00 |
$75.00 |
$320.00 |
| 28 | 505(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 30 | SY |
$500.00 |
$225.00 |
$5.00 |
$525.00 |
$200.00 |
$475.00 |
| 29 | 505(D) 6087 |
LATEX MODIFIED BRIDGE DECK OVERLAY | 475 | SY |
$90.00 |
$80.00 |
$89.88 |
$80.00 |
$110.00 |
$122.00 |
| 30 | 505(G) 1000 |
HYDRODEMOLITION | 475 | SY |
$70.00 |
$75.00 |
$112.00 |
$60.00 |
$77.00 |
$125.00 |
| 31 | 509(A) 1326 |
CLASS AA CONCRETE | 5 | CY |
$700.00 |
$2,000.00 |
$1,866.00 |
$1,800.00 |
$645.00 |
$1,250.00 |
| 32 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 950 | LB |
$1.25 |
$2.00 |
$2.26 |
$2.00 |
$2.50 |
$1.11 |
| 33 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$5,000.00 |
$10,000.00 |
$12,000.00 |
$14,000.00 |
$6,150.00 |
$10,000.00 |
| 34 | 512(B) 6303 |
COLLECTION & HANDLING OF WASTE | 1 | LSUM |
$5,000.00 |
$500.00 |
$3,800.00 |
$6,000.00 |
$8,750.00 |
$10,000.00 |
| 35 | 520(A) 6058 |
PREPARATION OF CRACKS ABOVE WATER | 100 | LF |
$50.00 |
$34.00 |
$30.00 |
$70.00 |
$33.10 |
$37.25 |
| 36 | 520(C) 6060 |
EPOXY RESIN ABOVE WATER | 1 | GAL |
$150.00 |
$80.00 |
$718.00 |
$100.00 |
$80.00 |
$90.00 |
| 37 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 20 | SY |
$450.00 |
$525.00 |
$138.00 |
$650.00 |
$522.30 |
$587.50 |
| 38 | 535 6165 |
(PL)EXPANSION BEARING ASSEMBLY | 2 | EA |
$1,000.00 |
$2,000.00 |
$2,415.00 |
$3,000.00 |
$1,800.00 |
$2,500.00 |
| 39 | 535 6386 |
(PL)SILICONE CONSTRUCTION JOINT | 151.5 | LF |
$20.00 |
$12.00 |
$48.00 |
$30.00 |
$6.60 |
$22.00 |
| 40 | 619(B) 2500 |
(PL)REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$15,000.00 |
$6,500.00 |
$3,800.00 |
$9,000.00 |
$9,750.00 |
$12,500.00 |
| 41 | 627(O) 4410 |
RELOCATION OF RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN BARRIER | 480 | LF |
$5.00 |
$5.00 |
$5.16 |
$10.00 |
$4.00 |
$7.50 |
| 42 | 627(P) 4425 |
RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN BARRIER | 480 | LF |
$30.00 |
$30.00 |
$38.70 |
$40.00 |
$35.00 |
$20.00 |
| 43 | 823 8478 |
(PL)PORTABLE TRAFFIC SIGNAL SYSTEM | 90 | SD |
$400.00 |
$100.00 |
$38.70 |
$110.00 |
$53.00 |
$122.50 |
| 44 | 855(A) 8815 |
TRAFFIC STRIPE(PLASTIC)(THIN-LINE)(4" WIDE) | 1,200 | LF |
$0.9000 |
$2.00 |
$1.50 |
$3.00 |
$1.50 |
$2.55 |
| 45 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$31,627.00 |
$8,154.00 |
$27,000.00 |
$35,728.00 |
$18,800.00 |
| 46 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$23,600.00 |
$25,000.00 |
$41,135.00 |
$28,000.00 |
$70,000.00 |
$22,000.00 |