2020-001-B
- Let date
- Friday, January 20, 2023
- Contract
- 62K77 · job page
- District
- District 1
- County
- Dupage
- Highway
- Limits
- (1,254-Ft) Deck replacement, replacement of exterior beams, structural repairs to existing beams and substructure, guardrail replacement, and resurfacing from Woodland Ave. and Meadow Lane. The project includes a flush 5 ft sidewalk on both sides and traffic signal interconnect fiber will be replaced from St Charles Road to IL 64 (North Ave.)
Bidders 3
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Herlihy Mid-Continent Company Low bidder | $3,360,385 | ||
| 2 | Dunnet Bay Construction Company | $3,364,827 | +0.1% | |
| 3 | Areatha Construction Co., Inc. | $3,695,260 | +10.0% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Herlihy Mid-Con… | #2 Dunnet Bay Cons… | #3 Areatha Constru… |
|---|---|---|---|---|---|---|---|---|
| 1 | A2002816 | T-CATALPA SPEC 2 | 2 | EACH | $400.00 | $423.00 | $500.00 | |
| 2 | A2002916 | T-CELTIS OCCID 2 | 2 | EACH | $465.00 | $386.00 | $500.00 | |
| 3 | A2006616 | T-QUERCUS IMBR 2 | 2 | EACH | $465.00 | $460.00 | $500.00 | |
| 4 | B2001166 | T-CERCIS CAN CL 6' | 4 | EACH | $410.00 | $349.00 | $525.00 | |
| 5 | C2012448 | S-VIBURN LENT 4' | 4 | EACH | $90.00 | $289.00 | $65.00 | |
| 6 | K0029629 | WEED CONT BROADLF TRF | 0.5 | POUND | $500.00 | $25.00 | $100.00 | |
| 7 | X0324599 | ROD AND CLEAN EX COND | 3,675 | FOOT | $5.58 | $5.58 | $5.60 | |
| 8 | X0325938 | TEMP WIR INTERCON COM | 1 | L SUM | $17,348.30 | $17,348.30 | $17,348.30 | |
| 9 | X2010100 | TREE LIMB REM 4-10 | 1 | EACH | $350.00 | $350.00 | $50.00 | |
| 10 | X2100002 | PRUN SAFETY/EQUIP CLR | 1 | UNIT | $200.00 | $200.00 | $1,200.00 | |
| 11 | X2501820 | SEEDING CL 5 MOD | 0.1 | ACRE | $6,500.00 | $3,258.00 | $13,000.00 | |
| 12 | X2502014 | SEEDING CL 4A MOD | 0.1 | ACRE | $6,500.00 | $1,450.00 | $13,000.00 | |
| 13 | X2503110 | MOWING SPL | 5 | ACRE | $1,500.00 | $450.00 | $1,500.00 | |
| 14 | X2503315 | INTERSEED CL 4A MOD | 0.2 | ACRE | $4,500.00 | $1,392.00 | $4,840.00 | |
| 15 | X2503321 | INTERSEED CL 5 MOD | 0.2 | ACRE | $4,500.00 | $3,235.00 | $4,840.00 | |
| 16 | X2511630 | EROS CONT BLANKET SPL | 4,183 | SQ YD | $1.15 | $1.60 | $1.50 | |
| 17 | X6700410 | ENGR FLD OFF A SPL | 12 | CAL MO | $7,000.00 | $4,250.00 | $2,500.00 | |
| 18 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $48,500.00 | $48,500.00 | $31,975.00 | |
| 19 | X8710024 | FOCC62.5/125 MM12SM24 | 6,400 | FOOT | $6.60 | $6.60 | $6.60 | |
| 20 | X8950510 | REM FOC FR CONDUIT | 6,235 | FOOT | $1.20 | $1.20 | $1.20 | |
| 21 | Z0001903 | STRUCT STEEL REMOV | 33,600 | POUND | $0.0100 | $3.00 | $4.15 | |
| 22 | Z0001905 | STRUCT STEEL REPAIR | 6,040 | POUND | $21.38 | $25.00 | $21.85 | |
| 23 | Z0004552 | APPROACH SLAB REM | 281 | SQ YD | $40.00 | $40.00 | $87.00 | |
| 24 | Z0007101 | C&D LEAD PT CL RS N1 | 1 | L SUM | $7,100.00 | $7,100.00 | $7,100.00 | |
| 25 | Z0010400 | CLEANING BRIDGE SEATS | 164 | SQ FT | $12.00 | $12.00 | $12.00 | |
| 26 | Z0010501 | CLEAN & PT STL BR N1 | 1 | L SUM | $89,900.00 | $64,000.00 | $64,000.00 | |
| 27 | Z0012754 | STR REP CON DP = < 5 | 83 | SQ FT | $234.00 | $260.00 | $227.15 | |
| 28 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $37,200.00 | $5,000.00 | $24,995.00 | |
| 29 | Z0018002 | DRAINAGE SCUPPR DS-11 | 2 | EACH | $1,300.00 | $1,325.00 | $1,370.96 | |
| 30 | Z0030850 | TEMP INFO SIGNING | 51.4 | SQ FT | $18.00 | $25.00 | $16.50 | |
| 31 | Z0064800 | SELECTIVE CLEARING | 12 | UNIT | $225.00 | $225.00 | $700.00 | |
| 32 | Z0076600 | TRAINEES | 500 | HOUR | $0.8000 | $0.8000 | $0.8000 | |
| 33 | Z0076604 | TRAINEES TPG | 500 | HOUR | $15.00 | $15.00 | $15.00 | |
| 34 | 20100110 | TREE REMOV 6-15 | 100 | UNIT | $28.00 | $28.00 | $35.00 | |
| 35 | 20100500 | TREE REMOV ACRES | 0.25 | ACRE | $8,000.00 | $8,000.00 | $28,000.00 | |
| 36 | 20101000 | TEMPORARY FENCE | 1,257 | FOOT | $3.00 | $3.00 | $3.75 | |
| 37 | 20101400 | NITROGEN FERT NUTR | 40 | POUND | $4.00 | $3.00 | $1.00 | |
| 38 | 20101600 | POTASSIUM FERT NUTR | 40 | POUND | $4.00 | $3.00 | $1.00 | |
| 39 | 20200100 | EARTH EXCAVATION | 148 | CU YD | $28.00 | $45.00 | $53.54 | |
| 40 | 20201200 | REM & DISP UNS MATL | 376 | CU YD | $49.00 | $52.00 | $61.30 | |
| 41 | 20400800 | FURNISHED EXCAVATION | 112 | CU YD | $76.00 | $30.00 | $49.30 | |
| 42 | 20800150 | TRENCH BACKFILL | 119 | CU YD | $70.00 | $70.00 | $70.00 | |
| 43 | 21101615 | TOPSOIL F & P 4 | 2,579 | SQ YD | $5.00 | $6.00 | $0.1000 | |
| 44 | 25000210 | SEEDING CL 2A | 0.4 | ACRE | $3,000.00 | $3,148.00 | $26,000.00 | |
| 45 | 25100115 | MULCH METHOD 2 | 0.3 | ACRE | $1,800.00 | $1,700.00 | $4,840.00 | |
| 46 | 25100900 | TURF REINF MAT | 360 | SQ YD | $5.00 | $4.40 | $6.00 | |
| 47 | 25200200 | SUPPLE WATERING | 25 | UNIT | $1.00 | $50.00 | $0.1000 | |
| 48 | 28000250 | TEMP EROS CONTR SEED | 52 | POUND | $5.00 | $5.00 | $0.1000 | |
| 49 | 28000305 | TEMP DITCH CHECKS | 25 | FOOT | $9.00 | $3.90 | $12.00 | |
| 50 | 28000400 | PERIMETER EROS BAR | 2,512 | FOOT | $2.00 | $1.90 | $2.75 | |
| 51 | 28000510 | INLET FILTERS | 15 | EACH | $160.00 | $140.00 | $225.00 | |
| 52 | 28001100 | TEMP EROS CONTR BLANK | 1,083 | SQ YD | $1.10 | $0.9000 | $1.00 | |
| 53 | 28100105 | STONE RIPRAP CL A3 | 10 | SQ YD | $100.00 | $38.00 | $256.09 | |
| 54 | 28100705 | STONE DUMP RIP CL A3 | 10 | SQ YD | $100.00 | $190.00 | $257.05 | |
| 55 | 30300112 | AGG SUBGRADE IMPR 12 | 643 | SQ YD | $35.00 | $30.00 | $38.20 | |
| 56 | 40600290 | BIT MATLS TACK CT | 1,956 | POUND | $0.0100 | $0.0100 | $1.00 | |
| 57 | 40600370 | LONG JOINT SEALANT | 2,964 | FOOT | $4.25 | $5.23 | $4.50 | |
| 58 | 40600400 | MIX CR JTS FLANGEWYS | 13 | TON | $327.00 | $450.00 | $440.00 | |
| 59 | 40600982 | HMA SURF REM BUTT JT | 153 | SQ YD | $9.00 | $29.68 | $23.00 | |
| 60 | 40600990 | TEMPORARY RAMP | 153 | SQ YD | $77.00 | $7.49 | $25.00 | |
| 61 | 40605026 | P HMA SC SMA 9.5 F N80 | 426 | TON | $158.00 | $118.72 | $195.00 | |
| 62 | 42000070 | PVT CON HMA BR APP SL | 95.1 | SQ YD | $155.00 | $333.43 | $200.00 | |
| 63 | 42001300 | PROTECTIVE COAT | 363 | SQ YD | $2.00 | $2.25 | $1.00 | |
| 64 | 44000100 | PAVEMENT REM | 115 | SQ YD | $50.00 | $47.00 | $42.80 | |
| 65 | 44000156 | HMA SURF REM 1 3/4 | 4,559 | SQ YD | $3.50 | $4.87 | $6.00 | |
| 66 | 44000500 | COMB CURB GUTTER REM | 2,027 | FOOT | $6.00 | $11.00 | $10.45 | |
| 67 | 44201821 | CL D PATCH T4 14 | 100 | SQ YD | $165.00 | $352.48 | $75.00 | |
| 68 | 50102400 | CONC REM | 22 | CU YD | $650.00 | $720.00 | $1,854.35 | |
| 69 | 50104400 | CONC HDWL REM | 1 | EACH | $600.00 | $835.00 | $600.00 | |
| 70 | 50104720 | REM EXIST CONC DECK | 1 | EACH | $207,687.91 | $150,000.00 | $142,919.35 | |
| 71 | 50157300 | PROTECTIVE SHIELD | 408 | SQ YD | $0.1000 | $0.0100 | $115.12 | |
| 72 | 50200100 | STRUCTURE EXCAVATION | 128 | CU YD | $45.00 | $74.00 | $85.70 | |
| 73 | 50300225 | CONC STRUCT | 54.6 | CU YD | $1,000.00 | $771.50 | $1,582.85 | |
| 74 | 50300255 | CONC SUP-STR | 366.4 | CU YD | $1,800.00 | $1,477.00 | $1,747.05 | |
| 75 | 50300260 | BR DECK GROOVING | 1,091 | SQ YD | $13.00 | $13.41 | $12.35 | |
| 76 | 50300300 | PROTECTIVE COAT | 1,605 | SQ YD | $1.50 | $2.00 | $3.30 | |
| 77 | 50301350 | CONC SUPSTR APP SLAB | 158.7 | CU YD | $700.00 | $445.00 | $449.35 | |
| 78 | 50500105 | F & E STRUCT STEEL | 1 | L SUM | $205,000.00 | $255,000.00 | $217,725.38 | |
| 79 | 50500505 | STUD SHEAR CONNECTORS | 2,430 | EACH | $6.25 | $4.12 | $6.25 | |
| 80 | 50800205 | REINF BARS, EPOXY CTD | 136,280 | POUND | $1.74 | $1.75 | $1.70 | |
| 81 | 50800515 | BAR SPLICERS | 1,658 | EACH | $56.42 | $49.00 | $67.05 | |
| 82 | 50900105 | ALUM RAILING TY L | 452 | FOOT | $223.26 | $193.00 | $193.00 | |
| 83 | 51500100 | NAME PLATES | 1 | EACH | $650.00 | $900.00 | $824.79 | |
| 84 | 52000110 | PREF JT STRIP SEAL | 108 | FOOT | $350.00 | $240.00 | $569.60 | |
| 85 | 52100010 | ELAST BEARING ASSY T1 | 2 | EACH | $4,383.00 | $1,615.50 | $3,704.85 | |
| 86 | 52100520 | ANCHOR BOLTS 1 | 8 | EACH | $103.00 | $275.00 | $188.93 | |
| 87 | 52200010 | TEMP SHT PILING | 368 | SQ FT | $37.00 | $36.50 | $88.80 | |
| 88 | 54213660 | PRC FLAR END SEC 15 | 1 | EACH | $1,200.00 | $2,313.00 | $1,200.00 | |
| 89 | 550A0340 | STORM SEW CL A 2 12 | 190 | FOOT | $110.00 | $103.00 | $110.00 | |
| 90 | 550A0360 | STORM SEW CL A 2 15 | 199 | FOOT | $120.00 | $125.00 | $120.00 | |
| 91 | 550A0660 | STORM SEW CL A 3 15 | 198 | FOOT | $120.00 | $209.00 | $120.00 | |
| 92 | 55100500 | STORM SEWER REM 12 | 382 | FOOT | $40.00 | $27.00 | $40.00 | |
| 93 | 55200200 | STORM SEWERS JKD 12 | 40 | FOOT | $375.00 | $1,874.00 | $375.00 | |
| 94 | 58600101 | GRANULAR BACKFILL STR | 126 | CU YD | $46.00 | $70.84 | $121.00 | |
| 95 | 58700300 | CONCRETE SEALER | 442 | SQ FT | $3.00 | $2.50 | $5.80 | |
| 96 | 59100100 | GEOCOMPOSITE WALL DR | 74 | SQ YD | $15.00 | $16.00 | $65.95 | |
| 97 | 60146304 | P UNDR FOR STRUCT 4 | 174 | FOOT | $35.00 | $45.00 | $45.00 | |
| 98 | 60201340 | CB TA 4 DIA T24F&G | 3 | EACH | $4,500.00 | $4,615.00 | $6,600.00 | |
| 99 | 60218400 | MAN TA 4 DIA T1F CL | 3 | EACH | $4,500.00 | $5,620.00 | $6,600.00 | |
| 100 | 60251740 | CB ADJ NEW T24F&G | 4 | EACH | $1,000.00 | $1,016.00 | $1,000.00 | |
| 101 | 60500040 | REMOV MANHOLES | 1 | EACH | $500.00 | $818.00 | $500.00 | |
| 102 | 60603800 | COMB CC&G TB6.12 | 88 | FOOT | $107.46 | $57.00 | $75.00 | |
| 103 | 60605000 | COMB CC&G TB6.24 | 1,857 | FOOT | $39.92 | $58.00 | $45.00 | |
| 104 | 63000003 | SPBGR TY A 9FT POSTS | 1,605 | FOOT | $35.00 | $35.00 | $35.00 | |
| 105 | 63100085 | TRAF BAR TERM T6 | 4 | EACH | $3,900.00 | $4,190.56 | $3,900.00 | |
| 106 | 63100167 | TR BAR TRM T1 SPL TAN | 4 | EACH | $2,900.00 | $2,900.00 | $2,900.00 | |
| 107 | 63200310 | GUARDRAIL REMOV | 1,855 | FOOT | $4.50 | $4.50 | $4.50 | |
| 108 | 66900200 | NON SPL WASTE DISPOSL | 345 | CU YD | $53.00 | $71.41 | $99.05 | |
| 109 | 66900530 | SOIL DISPOSAL ANALY | 4 | EACH | $1,245.00 | $1,245.00 | $1,245.00 | |
| 110 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $2,300.00 | $2,300.00 | $2,300.00 | |
| 111 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $2,100.00 | $2,100.00 | $2,100.00 | |
| 112 | 66901006 | REG SUB MON | 5 | CAL DA | $798.00 | $798.00 | $798.00 | |
| 113 | 67100100 | MOBILIZATION | 1 | L SUM | $201,500.00 | $201,889.61 | $221,000.00 | |
| 114 | 70103815 | TR CONT SURVEILLANCE | 190 | CAL DA | $25.00 | $25.00 | $280.00 | |
| 115 | 70300100 | SHORT TERM PAVT MKING | 1,843 | FOOT | $3.00 | $3.00 | $1.00 | |
| 116 | 70300150 | SHRT TRM PAVT MK REM | 7,484 | SQ FT | $0.3500 | $0.3500 | $1.50 | |
| 117 | 70307120 | TEMP PVT MK L4 T4 TAPE | 19,746 | FOOT | $1.15 | $1.15 | $1.25 | |
| 118 | 70307160 | TEMP PVT MK L12 T4 TAPE | 902 | FOOT | $3.60 | $3.60 | $3.25 | |
| 119 | 70400100 | TEMP CONC BARRIER | 1,300 | FOOT | $10.00 | $32.50 | $38.50 | |
| 120 | 70400125 | PIN TEMP CONC BARRIER | 1,068 | EACH | $15.00 | $20.00 | $21.55 | |
| 121 | 70400200 | REL TEMP CONC BARRIER | 950 | FOOT | $3.00 | $12.50 | $11.60 | |
| 122 | 70600240 | IMP ATTN TEMP NRD TL2 | 2 | EACH | $3,000.00 | $3,000.00 | $3,000.00 | |
| 123 | 70600341 | IMP ATTN REL NRN TL2 | 4 | EACH | $500.00 | $500.00 | $1,400.00 | |
| 124 | 72000100 | SIGN PANEL T1 | 18 | SQ FT | $24.00 | $24.00 | $30.00 | |
| 125 | 72400500 | RELOC SIN PAN ASSY TA | 2 | EACH | $200.00 | $200.00 | $150.00 | |
| 126 | 72501000 | TERMINAL MARKER - DA | 4 | EACH | $50.00 | $50.00 | $50.00 | |
| 127 | 73000100 | WOOD SIN SUPPORT | 32 | FOOT | $38.00 | $38.00 | $40.00 | |
| 128 | 78000200 | THPL PVT MK LINE 4 | 2,721 | FOOT | $1.28 | $1.28 | $3.95 | |
| 129 | 78003137 | PREF PL PM TB LINE 7 | 118 | FOOT | $18.25 | $18.25 | $26.00 | |
| 130 | 78008310 | POLYUREA PM T2 LN 4 | 944 | FOOT | $4.25 | $4.25 | $7.95 | |
| 131 | 78011040 | GRV RCSD PVT MRKG 8 | 118 | FOOT | $9.50 | $9.50 | $3.25 | |
| 132 | 78100100 | RAISED REFL PAVT MKR | 100 | EACH | $50.00 | $50.00 | $52.00 | |
| 133 | 78100300 | REPLACEMENT REFLECTOR | 46 | EACH | $26.70 | $26.70 | $22.00 | |
| 134 | 78112000 | RAISED REFL PAVT MKR BRDG | 24 | EACH | $68.00 | $68.00 | $54.00 | |
| 135 | 78200005 | GRDRAIL REF TYPE A | 24 | EACH | $10.00 | $10.00 | $10.00 | |
| 136 | 78200011 | BARR WALL REF TYPE C | 186 | EACH | $12.00 | $14.00 | $7.00 | |
| 137 | 78300200 | RAISED REF PVT MK REM | 64 | EACH | $20.00 | $20.00 | $20.00 | |
| 138 | 78300201 | PAVMT MRKG REM GRIND | 900 | SQ FT | $1.75 | $1.75 | $1.30 | |
| 139 | 81028200 | UNDRGRD C GALVS 2 | 1,591 | FOOT | $21.95 | $21.95 | $21.95 | |
| 140 | 81104580 | CON AT ST 2 SS | 196 | FOOT | $185.00 | $185.00 | $185.00 | |
| 141 | 81300550 | JUN BX SS AS 12X12X6 | 2 | EACH | $2,600.00 | $2,600.00 | $2,600.00 | |
| 142 | 81400100 | HANDHOLE | 2 | EACH | $3,300.00 | $3,300.00 | $3,300.00 | |
| 143 | 85000200 | MAIN EX TR SIG INSTAL | 2 | EACH | $781.00 | $781.00 | $781.00 | |
| 144 | 87300925 | ELCBL C TRACER 14 1C | 6,375 | FOOT | $1.37 | $1.37 | $1.35 | |
| 145 | 87900200 | DRILL EX HANDHOLE | 2 | EACH | $500.00 | $500.00 | $500.00 | |
| 146 | 89502300 | REM ELCBL FR CON | 6,235 | FOOT | $1.40 | $1.40 | $1.40 | |
| 147 | 89502380 | REMOV EX HANDHOLE | 2 | EACH | $808.00 | $808.00 | $808.00 |