Filtered by: County: Wabash Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Apr 26, 2019 | 95846 | WabashDistrict 7 | Replace the bridge carrying TR 173 over a drainage ditch, 1.5 miles south of Keensburg. | — | Executed | Lake Contracting, Inc. $244,759 · | ||
| Mar 6, 2020 | 95869 | WabashDistrict 7 | Construction of a 16'x 9' cast-in-place box culvert to carry TR 173 over a drainage ditch, 1.5 miles south of Keensburg. | — | Executed | Allendale Gravel Co., Inc. $392,596 · | ||
| Apr 24, 2020 | 74938 | WabashDistrict 7 | Washing and sealing the bridge deck on SN 093-0021 carrying IL 15 over the Wabash River in Mt. Carmel. | — | Executed | All States Painting, Inc. $39,900 · | ||
| Jul 31, 2020 | 95856 | WabashDistrict 7 | Resurfacing CH 4 from the Lawrence County line to CH 11. | — | Executed | Howell Paving, Inc. $936,042 · | ||
| Apr 23, 2021 | 74939 | WabashDistrict 7 | 12.2 miles of surface removal, patching, pipe and culvert replacement, deck patching, joint repair and concrete wearing surface on SN 093-0020 on IL 1 from Greathouse Creek in Mt. Carmel to the Edwards County line. | — | Executed | Howell Paving, Inc. $7,017,712 · | ||
| Jun 11, 2021 | 95902 | WabashDistrict 7 | Resurface 5th Street from Oak St. to North Mulberry St., and resurface Oak St. from College Dr. to Poplar St., and from IL 15 to West 3rd St. in Mt. Carmel. | — | Executed | Howell Paving, Inc. $965,200 · | ||
| Nov 5, 2021 | 74320 | WabashDistrict 7 | Removal and replacement of SN 093-0006, PCC pavement and sidewalks on IL 1 between 11th and 12th Streets in Mt. Carmel. | — | Executed | Sierra Bravo Contractors, LLC $935,076 · | ||
| Nov 5, 2021 | 74948 | WabashDistrict 7 | Polymer overlay on SN 093-0021 carrying IL 15 over the Wabash River in Mt. Carmel. | — | Executed | Samron Midwest Contracting, Inc. $1,144,946 · | ||
| Apr 28, 2023 | 74B54 | ClarkWabashDistrict 7 | Bridge painting at various locations in Clark and Wabash Counties. | — | Executed | Venus Painting Co. $577,241 · | ||
| Nov 17, 2023 | 74B37 | WabashDistrict 7 | Washing the bridge deck on SN 093-0021 carrying IL 15 over the Wabash River in Mt. Carmel. | — | Executed | |||
| Jan 19, 2024 | 74B32 | WabashDistrict 7 | Installation of strip seal expansion joints, bridge deck scarification, deck patching, bridge deck fly ash or ground granulated blast furnace slag concrete overlay and diamond grinding on SN 093-0001 carrying IL 1 over Raccoon Creek, south of the Lawrence County line. | — | Executed | Samron Midwest Contracting, Inc. $674,674 · | ||
| Apr 26, 2024 | 95956 | WabashDistrict 7 | Resurfacing on Poor Farm Road from Friendsville Avenue to IL 1, north of Mount Carmel. | — | Executed | Howell Paving, Inc. $647,145 · | ||
| Jun 14, 2024 | 74C79 | WabashDistrict 7 | Removing and replacing the concrete apron in front of the Browns Maintenance Yard. | — | Executed | Shores Builders, Inc. $92,347 · | ||
| Aug 2, 2024 | 74838 | WabashDistrict 7 | 1.6 miles of resurfacing, ADA improvements and traffic signal upgrades on IL 15/IL 1 from 0.2 miles east of Empire Street to Cherry Street in Mount Carmel. | — | Executed | Howell Paving, Inc. $3,847,998 · | ||
| Nov 8, 2024 | 95966 | WabashDistrict 7 | Replace the bridge carrying E 440 Road over a tributary to Bonpas Creek, 2 miles northeast of Cowling. | — | Executed | C-Hill Civil Contractors, Inc. $397,458 · | ||
| Mar 7, 2025 | 74D38 | WabashDistrict 7 | Washing the bridge deck on SN 093-0021 carrying IL 15 over the Wabash River in Mt. Carmel. | — | Executed | M & M Concrete, Inc. $54,800 · | ||
| Apr 24, 2026 | 74E17 | EdwardsWabashDistrict 7 | 12.9 miles of tree removal along IL 1 from 0.2 miles south of Empire Street to 0.5 miles north of Browns/Grayville Road. | — | Executed | Wayne's Tree Service $377,009 · | ||
| Apr 24, 2026 | 74E29 | WabashDistrict 7 | Washing the bridge deck on SN 093-0021 carrying IL 15 over the Wabash River in Mt. Carmel. | — | Executed | All States Painting, Inc. $58,028 · | ||
| Jun 12, 2026 | 74E26 | WabashDistrict 7 | 7.7 miles of shoulder reconstruction on IL 1 from E. 1200 Road (Bridgeport Road) to the Lawrence County line. | — | Executed | Phoenix Corporation of the Quad Cities $205,339 · |
1–19 of 19
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.