IDOT Jobs

Apr 2026 · 7 jobs · — Sign up free
★ My Jobs

Filtered by: County: Tazewell Clear all

7 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Apr 24, 2026 68J16 TazewellDistrict 4 Bridge joint replace and repair, bridge deck overlay, slope wall repair at SN 090-0152 carrying IL 40 ramp to I-74 WB in East Peoria in Tazewell County. — Executed Nov 25 New Stark Excavating, Inc. $478,751 ·
Apr 24, 2026 68J60 TazewellDistrict 4 5.86 miles of CIR and design overlay of IL 122 from 2.1 miles east of Hopedale to the McLean County line. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $8,241,332 ·
Apr 24, 2026 68K12 TazewellDistrict 4 5.656 gross miles of microsurfacing on I-474/US 24 from the Illinois River to I-74 in Tazewell County. — Executed Nov 25 New Beniach Construction Co., Inc. $2,076,981 ·
Apr 24, 2026 68K87 TazewellDistrict 4 Fence removal and replacement around Operations Yard in Morton. — Executed Nov 25 New CSD Environmental Services, Inc. $173,612 ·
Apr 24, 2026 68L05 TazewellDistrict 4 Building demolition at 600 Main St (Parcel No. 4ABL011) in East Peoria, Tazewell County. — Executed Nov 25 New JIMAX Landscape LLC $72,493 ·
Apr 24, 2026 72443 LoganTazewellDistrict 6 2 miles of resurfacing on Armington Road (US 136 Spur) from East Third Street in Armington to north of US 136. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $624,204 ·
Apr 24, 2026 89898 TazewellDistrict 4 Resurfacing on Broadway Road from Springfield Road to the I-55 Interchange. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $2,149,810 ·
1–7 of 7

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.