IDOT Jobs

All dates · 15 jobs · — Sign up free
★ My Jobs

Filtered by: County: Stark Clear all

15 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Mar 9, 2018 89726 StarkDistrict 4 Bituminous surface treatment at various locations in Stark County. — Executed Nov 26 New Pavement Maintenance Services, Inc. $333,629 ·
Mar 9, 2018 89736 StarkDistrict 4 Replace the bridge carrying CH 8 over an unnamed tributary of the West Fork River, 2 miles northwest of Osceola. — Executed Nov 26 New Curnyn Construction Co. $264,241 ·
Apr 27, 2018 68895 StarkDistrict 4 Replace bridge SN 088-0001 carrying IL 17 over Indian Creek, 0.3 mil west of Toulon. — Executed Nov 26 New Stark Excavating, Inc. $2,035,628 ·
Apr 27, 2018 68E05 StarkTazewellDistrict 4 Pollinator habitat restoration and preservation in Stark and Tazewell Counties. — Executed Nov 26 New CSD Environmental Services, Inc. $41,978 ·
Jul 12, 2019 68D00 HenryStarkDistrict 4 2.93 miles of resurfacing, patching, and partial depth patching from N of IL-17 (W) to just N of the Stark/Henry County Line. — Executed Nov 26 New Advanced Asphalt Company $1,709,624 ·
Nov 6, 2020 68897 StarkDistrict 4 Replacement of structure carrying IL 78 over Walnut Creek (S.N. 088-0012 existing, S.N. 088-2503 proposed) 0.8 miles North of West Jersey in Stark County. — Executed Nov 26 New Stark Excavating, Inc. $1,632,505 ·
Jan 21, 2022 68G76 StarkDistrict 4 Tree removal along IL 17/91 over the Spoon River (SN 088-0002) in Stark County. — Executed Nov 26 New CSD Environmental Services, Inc. $54,996 ·
Sep 23, 2022 68698 StarkDistrict 4 Replacement of the structure carrying IL 17/ IL 91 over the Spoon River SN 088-0002 (existing; SN 088-0030 (proposed)Ù, 0.6 miles West of Wyoming in Stark County. The project is 2887 feet (0.55 mile) in length. The project also includes roadway profile adjustments, regrading of sideslopes, and construction of the stream barbs. — Rejected Nov 26 New ICC Group Inc. $13,207,000 ·
Mar 10, 2023 68G35 StarkDistrict 4 Microsurfacing (1-Pass) on IL 91 from IL 93 to IL 17. — Executed Nov 26 New A. C. Pavement Striping Co. $559,696 ·
Mar 10, 2023 89752 StarkDistrict 4 Replace existing structure carrying North Valley Road over Camp Run Creek with a 3-span flange beam bridge with HMA approaches, 0.3 mile southeast of Wyoming. — Executed Nov 26 New Stark Excavating, Inc. $1,938,063 ·
Apr 28, 2023 68G38 StarkDistrict 4 Bridge deck overlay to 088-0021 and 088-0022-0022 carrying IL 93 over West and East Fork Spoon River west of Bradford. — Executed Nov 26 New Stark Excavating, Inc. $1,059,779 ·
Mar 8, 2024 68J00 KnoxStarkDistrict 4 11 miles of cape seal on Il 41 from Monmouth Blvd. in Galesburg to Hunter St. in Abingdon in Knox County and on Il 78 from the Henry County Line to IL 17 (WB) in Stark County. — Executed Nov 26 New Beniach Construction Co., Inc. $1,746,017 ·
Jun 13, 2025 68D49 StarkDistrict 4 Resurfacing on Esceola Spur for 2.33 miles from East Osceola Rd to IL 93 in Stark County. — Executed Nov 25 New Advanced Asphalt Company $1,050,212 ·
Apr 24, 2026 68K20 StarkDistrict 4 6.45 miles of resurfacing from the southern city limit of Bradford to the west leg of IL 17. Milling and resurfacing and minor drainage improvements at the IL 40 Camp Grove Rest Area located 0.6 mile north of the west leg of IL 17 are also included. — Executed Nov 25 New Advanced Asphalt Company $2,839,793 ·
Jun 12, 2026 68K98 StarkDistrict 4 Partial and full depth patching on IL 93 from IL 91 (S) to IL 40 in Stark County. 9.54 miles gross length. — Executed Nov 25 New Advanced Asphalt Company $376,414 ·
1–15 of 15

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.