Filtered by: County: Macon Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 20, 2023 | 74813 | MaconDistrict 7 | 9.9 miles of designed overlay, culvert replacement and ADA improvements on IL 48 from Bowman Road to the Christian County line. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $8,098,703 · | ||
| Jan 20, 2023 | 74B70 | MaconShelbyDistrict 7 | 42 miles of weed control on US 51 from the Christian County line and on I-72 from US 51 to the Piatt County line. | — | Executed | The Daltons Inc. $72,932 · | ||
| Mar 10, 2023 | 74739 | MaconDistrict 7 | 4.1 miles of patching, resurfacing, median and curb repairs, traffic signal upgrades and ADA upgrades on IL 121 from US 36 in Decatur to the southern corporate limits of Mt. Zion. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $11,912,205 · | ||
| Mar 10, 2023 | 74976 | MaconDistrict 7 | Milling, resurfacing and aggregate shoulders on IL 105 from 0.3 miles east of Bender Drive to the Piatt County line. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $4,183,455 · | ||
| Mar 10, 2023 | 74B16 | MaconDistrict 7 | Bridge bearing replacement on SN058-0084 and SN 058-0085 on IL 48 approximately 2.5 miles east of Forsyth. | — | Executed | Sangamo Construction Company $487,391 · | ||
| Mar 10, 2023 | 74B58 | MaconDistrict 7 | 4.3 miles of partial width resurfacing at various locations on Old US 51 from US 36 (Eldorado) to IL 121 (Pershing) in Decatur. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $549,728 · | ||
| Apr 28, 2023 | 74B36 | MaconDistrict 7 | Bridge painting on SN 058-0091 on I-72 at the Argenta interchange. | — | Executed | Venus Painting Co. $464,933 · | ||
| Apr 28, 2023 | 74B46 | MaconDistrict 7 | Patching and partial width resurfacing at 2 locations: 1) IL 105 from 0.1 miles east of 26th Street to Bender Drive in Decatur; 2) IL 121 at the Garfield overpass in Decatur. | — | Executed | Beniach Construction Co., Inc. $646,265 · | ||
| Apr 28, 2023 | 74B50 | MaconDistrict 7 | 7.9 miles of longitudinal joint repair on I-72 from US 36 to US 51. | — | Rejected | Illinois Valley Paving, a div of UCM, Inc. $919,562 · | ||
| Apr 28, 2023 | 74B55 | MaconDistrict 7 | Bridge painting at various locations in Macon County. | — | Executed | Venus Painting Co. $880,724 · | ||
| Apr 28, 2023 | 74B84 | MaconDistrict 7 | Fence replacement at the Decatur Maintenance Yard. | — | Executed | Lake Contracting, Inc. $211,788 · | ||
| Jun 16, 2023 | 74477 | MaconDistrict 7 | 2.7 miles of patching, resurfacing, sidewalk, curb and gutter replacement and new signals on IL 121 in Decatur. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $11,583,263 · | ||
| Jun 16, 2023 | 74702 | MaconDistrict 7 | Bridge work, pavement patching, HMA and concrete surface removal, HMA resurfacing, detector loops, inlet adjustments, curb and gutter repairs, ADA ramps, and pavement markings on US 36 from IL 48 to Church Street in Decatur. | — | Rejected | Illinois Valley Paving, a div of UCM, Inc. $8,361,505 · | ||
| Jun 16, 2023 | 74800 | MaconDistrict 7 | 8 miles of patching, pipe underdrain replacement and resurfacing on US 51 from the DeWitt County line to 0.1 miles north of Forsyth Road. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $24,477,448 · | ||
| Sep 22, 2023 | 74828 | MaconDistrict 7 | Overlay with ADA, signal and intersection improvements on US 51 from 0.1 miles miles north of Forsyth Road to I-72 in Decatur. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $13,973,388 · | ||
| Nov 17, 2023 | 74B29 | MaconDistrict 7 | Bridge deck overlay, joint replacement / repair and other bridge deck repairs on 3 structures: 1) SN 058-0060 carrying TR 4 (South Acom Road) over I-72; 2) SN 058-0062 carrying CH 27 (Lincoln Memorial Parkway) over I-72; 3) SN 058-0065 carrying Twin Lakes Road over I-72 just west of Decatur. | — | Executed | Freesen, a div of UCM, Inc. $1,224,997 · | ||
| Nov 17, 2023 | 74B30 | MaconDistrict 7 | Bridge deck overlay, joint repair and approach pavement on I-72 over Spring Creek, 1.3 miles east of Forsyth. | — | Executed | Freesen, a div of UCM, Inc. $1,953,030 · | ||
| Nov 17, 2023 | 74B33 | MaconDistrict 7 | Bridge deck repair and overlay on SN 058-0129 carrying IL 121 over South Fork Creek, 0.7 miles east of the Logan County line. | — | Executed | Freesen, a div of UCM, Inc. $498,028 · | ||
| Nov 17, 2023 | 74B39 | MaconDistrict 7 | Bridge deck overlay, joint replacement, deck patching, structural concrete repair, crashwall extensions and HMA approaches on SN 058-0087 carrying Kirby Road over I-72, northeast of Decatur. | — | Executed | Freesen, a div of UCM, Inc. $638,193 · |
1–19 of 19
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.