(128, 129)RS-4
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Illinois Valley Paving, a div of UCM, Inc. Low bidder | $8,098,703 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Illinois Valley… |
|---|---|---|---|---|---|---|
| 1 | X0326440 | SURF REM VAR DP (SPL) | 5,886.1 | SQ YD | $19.29 | |
| 2 | X0900064 | MEMBR WTRPR SYS B STR | 36 | SQ YD | $55.00 | |
| 3 | X2501000 | SEEDING CL 2 SPL | 0.25 | ACRE | $23,100.00 | |
| 4 | X4060995 | TEMPORARY RAMP SPL | 995.3 | SQ YD | $26.91 | |
| 5 | Z0049799 | PROT RESET SURVEY MRK | 32 | EACH | $1,146.71 | |
| 6 | Z0054505 | ROCK FILL - REPLACE | 21 | TON | $55.00 | |
| 7 | Z0070202 | SURVEY MARKER VAULT | 2 | EACH | $692.06 | |
| 8 | 20201200 | REM & DISP UNS MATL | 10.6 | CU YD | $100.10 | |
| 9 | 20700220 | POROUS GRAN EMBANK | 48.9 | CU YD | $133.10 | |
| 10 | 28100105 | STONE RIPRAP CL A3 | 22.2 | SQ YD | $66.00 | |
| 11 | 28200200 | FILTER FABRIC | 22.2 | SQ YD | $11.00 | |
| 12 | 35400500 | PCC BASE CSE W 10 | 42 | SQ YD | $289.49 | |
| 13 | 35650100 | BASE CSE WID 6 | 90 | SQ YD | $88.20 | |
| 14 | 40200800 | AGG SURF CSE B | 6.9 | TON | $80.30 | |
| 15 | 40600290 | BIT MATLS TACK CT | 113,516 | POUND | $1.25 | |
| 16 | 40600370 | LONG JOINT SEALANT | 52,145 | FOOT | $3.31 | |
| 17 | 40600982 | HMA SURF REM BUTT JT | 600 | SQ YD | $13.49 | |
| 18 | 40600990 | TEMPORARY RAMP | 300 | SQ YD | $9.66 | |
| 19 | 40602970 | HMA BC IL-9.5FG N70 | 16,233 | TON | $145.92 | |
| 20 | 40604052 | HMA SC IL-9.5 C N70 | 18,552 | TON | $147.18 | |
| 21 | 40800050 | INCIDENTAL HMA SURF | 764.2 | TON | $338.55 | |
| 22 | 42300400 | PCC DRIVEWAY PAVT 8 | 47 | SQ YD | $164.85 | |
| 23 | 42400300 | PC CONC SIDEWALK 6 | 1,383.5 | SQ FT | $25.07 | |
| 24 | 42400800 | DETECTABLE WARNINGS | 108 | SQ FT | $41.72 | |
| 25 | 44000100 | PAVEMENT REM | 59 | SQ YD | $56.09 | |
| 26 | 44000155 | HMA SURF REM 1 1/2 | 149,178 | SQ YD | $3.10 | |
| 27 | 44000164 | HMA SURF REM 3 3/4 | 18,393.2 | SQ YD | $8.51 | |
| 28 | 44000200 | DRIVE PAVEMENT REM | 48 | SQ YD | $68.94 | |
| 29 | 44000500 | COMB CURB GUTTER REM | 292 | FOOT | $22.66 | |
| 30 | 44000600 | SIDEWALK REM | 1,656 | SQ FT | $15.99 | |
| 31 | 44201796 | CL D PATCH T4 12 | 50 | SQ YD | $288.37 | |
| 32 | 44201851 | CL D PATCH T2 17 | 944.5 | SQ YD | $326.75 | |
| 33 | 44201855 | CL D PATCH T3 17 | 228.4 | SQ YD | $326.75 | |
| 34 | 44201857 | CL D PATCH T4 17 | 946.8 | SQ YD | $326.75 | |
| 35 | 48102100 | AGG WEDGE SHLD TYPE B | 3,497 | TON | $34.10 | |
| 36 | 48203100 | HMA SHOULDERS | 551.1 | TON | $234.46 | |
| 37 | 50100100 | REM EXIST STRUCT | 1 | EACH | $13,200.00 | |
| 38 | 50200100 | STRUCTURE EXCAVATION | 14.4 | CU YD | $73.70 | |
| 39 | 52200020 | TEMP SOIL RETEN SYSTM | 51 | SQ FT | $203.50 | |
| 40 | 54001001 | BOX CUL END SEC C1 | 2 | EACH | $15,950.00 | |
| 41 | 54010502 | PCBC 5X2 | 40 | FOOT | $825.00 | |
| 42 | 59100100 | GEOCOMPOSITE WALL DR | 36 | SQ YD | $33.00 | |
| 43 | 60260100 | INLETS ADJUST | 2 | EACH | $627.87 | |
| 44 | 60600605 | CONC CURB TB | 19 | FOOT | $123.33 | |
| 45 | 60603800 | COMB CC&G TB6.12 | 63.5 | FOOT | $186.70 | |
| 46 | 60605000 | COMB CC&G TB6.24 | 199.5 | FOOT | $130.82 | |
| 47 | 66900200 | NON SPL WASTE DISPOSL | 13 | CU YD | $422.02 | |
| 48 | 66900530 | SOIL DISPOSAL ANALY | 2 | EACH | $1,320.00 | |
| 49 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $2,420.00 | |
| 50 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $2,420.00 | |
| 51 | 66901006 | REG SUB MON | 2 | CAL DA | $1,100.00 | |
| 52 | 67000500 | ENGR FIELD OFFICE B | 6 | CAL MO | $2,631.24 | |
| 53 | 67000600 | ENGR FIELD LAB | 2 | CAL MO | $1,973.43 | |
| 54 | 67100100 | MOBILIZATION | 1 | L SUM | $143,776.02 | |
| 55 | 70100450 | TRAF CONT-PROT 701201 | 1 | L SUM | $33,430.14 | |
| 56 | 70100460 | TRAF CONT-PROT 701306 | 1 | L SUM | $53,199.21 | |
| 57 | 70102620 | TR CONT & PROT 701501 | 1 | L SUM | $5,948.48 | |
| 58 | 70102622 | TR CONT & PROT 701502 | 1 | L SUM | $6,975.37 | |
| 59 | 70102640 | TR CONT & PROT 701801 | 1 | L SUM | $6,650.69 | |
| 60 | 70107025 | CHANGEABLE MESSAGE SN | 28 | CAL DA | $133.59 | |
| 61 | 70300100 | SHORT TERM PAVT MKING | 6,372 | FOOT | $1.25 | |
| 62 | 70300150 | SHRT TRM PAVT MK REM | 1,707 | SQ FT | $5.39 | |
| 63 | 78000100 | THPL PVT MK LTR & SYM | 208 | SQ FT | $8.80 | |
| 64 | 78000200 | THPL PVT MK LINE 4 | 14,805 | FOOT | $1.28 | |
| 65 | 78000400 | THPL PVT MK LINE 6 | 593 | FOOT | $4.40 | |
| 66 | 78000600 | THPL PVT MK LINE 12 | 686 | FOOT | $8.80 | |
| 67 | 78000650 | THPL PVT MK LINE 24 | 50 | FOOT | $22.00 | |
| 68 | 78001110 | PAINT PVT MK LINE 4 | 113,452 | FOOT | $0.2000 | |
| 69 | 78011000 | GRV RCSD PM LTR & SYM | 672 | SQ FT | $3.30 | |
| 70 | 78011025 | GRV RCSD PVT MRKG 5 | 14,805 | FOOT | $0.7200 | |
| 71 | 78011035 | GRV RCSD PVT MRKG 7 | 593 | FOOT | $1.65 | |
| 72 | 78011065 | GRV RCSD PVT MRKG 13 | 686 | FOOT | $3.30 | |
| 73 | 78011125 | GRV RCSD PVT MRKG 25 | 50 | FOOT | $4.40 | |
| 74 | 78100100 | RAISED REFL PAVT MKR | 884 | EACH | $33.15 |