| Bid code | Description | Unit | Jobs ▼ | Avg low bid | Last let |
|---|---|---|---|---|---|
| X5430224 | CUR-IN-PL PIPE LNR 24 | FOOT | 5 | $239.40 | Sep 19, 2025 |
| X5537500 | SS CLEANED 6 | FOOT | 5 | $11.64 | Jun 12, 2026 |
| X5610724 | WATER MAIN REMOV 24 | FOOT | 5 | $30.64 | Mar 7, 2025 |
| X5610764 | WM LINE STOP 24 | EACH | 5 | $32,906.29 | Mar 7, 2025 |
| X5611106 | DI WM CL52 POLY EN 6 | FOOT | 5 | $111.51 | Jan 17, 2025 |
| X5620124 | WATER SERV LINE REM | FOOT | 5 | $41.00 | Apr 24, 2026 |
| X6011705 | PIPE DRAINS 6 SPL | FOOT | 5 | $43.62 | Jan 16, 2026 |
| X6012108 | PIPE DRAINS 18 SPL | FOOT | 5 | $186.70 | Apr 25, 2025 |
| X6020054 | JUNCTION BOX REMOVED | EACH | 5 | $3,148.18 | Sep 19, 2025 |
| X6020290 | MAN TA 7D SPL F&G | EACH | 5 | $11,423.92 | Aug 1, 2025 |
| X6020298 | MAN TA 8D T1F CL R-P | EACH | 5 | $19,033.87 | Sep 20, 2024 |
| X6022900 | CB RECONST SPL | EACH | 5 | $4,152.58 | Jun 16, 2023 |
| X6024132 | REM EX VALVE & VAULT | EACH | 5 | $1,175.63 | Apr 25, 2025 |
| X6024252 | INLETS SPL N6 | EACH | 5 | $5,054.55 | Mar 7, 2025 |
| X6024256 | INLETS SPL N8 | EACH | 5 | $5,640.30 | Aug 4, 2023 |
| X6026627 | VAULTS TO BE REMOVED | EACH | 5 | $1,160.70 | Jun 12, 2026 |
| X6027005 | DR ST T5 W/2 T22FG SPL | EACH | 5 | $8,702.78 | Jun 13, 2025 |
| X6050040 | REMOV MANHOLES SPL | EACH | 5 | $4,205.50 | Nov 7, 2025 |
| X6060068 | COMB CC&G TB SPL AEP | FOOT | 5 | $69.36 | Jan 17, 2025 |
| X6060095 | CLASS SI CONC (MISC) | CU YD | 5 | $1,432.84 | Jan 16, 2026 |
| X6061462 | CLEAN PAVED DITCH | FOOT | 5 | $10.97 | Jun 12, 2026 |
| X6061900 | CONC MED TSB6.12 SPL | SQ FT | 5 | $23.77 | Jan 17, 2025 |
| X6065750 | CONC MED SURF 6 SPL | SQ FT | 5 | $14.93 | Apr 26, 2024 |
| X6300162 | REPAIR SPBGR TY B | FOOT | 5 | $32.79 | Sep 18, 2026 |
| X6310164 | TRAF BAR TERM TY 1 | EACH | 5 | $3,069.73 | Sep 18, 2026 |
| X6310179 | TRAF BAR TERM T5 SPL | EACH | 5 | $359.69 | Jul 31, 2026 |
| X6310195 | TBT T1 SPL TANG MOD | EACH | 5 | $3,931.50 | Sep 19, 2025 |
| X6370279 | CONC BAR 1F 42HT SPL | FOOT | 5 | $118.65 | Apr 24, 2020 |
| X6432213 | REPR IMP ATTN FRW TL3 | EACH | 5 | $11,102.00 | Sep 18, 2026 |
| X6432233 | REPR IMP ATTN SUN TL3 | EACH | 5 | $10,318.18 | Sep 18, 2026 |
| X6640535 | CH LK FENCE 6 ATT STR | FOOT | 5 | $94.48 | Nov 17, 2023 |
| X6640630 | WOOD FENCE REM & RE-E | FOOT | 5 | $98.48 | Jun 12, 2026 |
| X6660117 | REM RE-E ROW MARKERS | EACH | 5 | $536.00 | Sep 20, 2024 |
| X7010011 | BARRICADES | EACH | 5 | $20.71 | Sep 18, 2026 |
| X7010230 | TC-PROT 701602 SPL | L SUM | 5 | $30,108.13 | Apr 25, 2025 |
| X7030025 | WET REF TEM TP T3 L&S | SQ FT | 5 | $15.35 | Jun 16, 2023 |
| X7030035 | WET REF TEM TAPE T3 5 | FOOT | 5 | $1.30 | Jun 17, 2022 |
| X7030045 | WET REF TEM TAPE T3 8 | FOOT | 5 | $1.98 | Mar 10, 2023 |
| X7035100 | TEMP EPOXY PVT MK L&S | SQ FT | 5 | $3.89 | Jun 11, 2021 |
| X7200066 | SMALL ENTRANCE SIGN | EACH | 5 | $4,767.90 | Jul 31, 2026 |
| X7200205 | SIGN PANEL T2 SPL | SQ FT | 5 | $32.36 | Jul 31, 2026 |
| X7800800 | HS THPL PM LTR & SYM | SQ FT | 5 | $6.19 | Mar 7, 2025 |
| X7800855 | HS THPL PM LN 12 | FOOT | 5 | $3.57 | Mar 7, 2025 |
| X8040103 | ELECT SERV INSTALL SPL | LSUM | 5 | $24,996.39 | Jun 12, 2026 |
| X8040108 | ELECTRIC METER | EACH | 5 | $2,342.23 | Jun 12, 2026 |
| X8108242 | UNDRGRD C HDPE 4 DIA | FOOT | 5 | $35.96 | Aug 1, 2025 |
| X8110458 | CON AT ST 2 SS | FOOT | 5 | $57.57 | Apr 24, 2020 |
| X8131168 | JUN BX NM ES 21X11X08 | EACH | 5 | $2,719.28 | Jun 12, 2026 |
| X8140205 | MOD EX CONC HANDHOLE | EACH | 5 | $1,647.10 | Apr 28, 2023 |
| X8210005 | TEMP LUM HPSV HM 250W | EACH | 5 | $427.80 | Apr 23, 2021 |
| X8211002 | PROT-MAINT EX UP LUM | L SUM | 5 | $17,350.00 | Apr 25, 2025 |
| X8211016 | TEMP LUM LED HGHMST I | EACH | 5 | $1,673.62 | Jun 12, 2026 |
| X8211190 | LUM LED HM 190W SPL | EACH | 5 | $817.30 | Apr 26, 2019 |
| X8302163 | TEMP WP 60 CL4 15 MA | EACH | 5 | $4,640.00 | Jun 12, 2026 |
| X8308120 | POLE ST AB 10 7G 34-6 | EACH | 5 | $7,587.91 | Jun 12, 2026 |
| X8362249 | CON F 24 1 1/4A 15B 9 | EACH | 5 | $4,569.34 | Jan 16, 2026 |
| X8380075 | BKWY DEV TR BS SP | EACH | 5 | $1,519.14 | Jan 16, 2026 |
| X8420500 | REM LT TOWER SALV | EACH | 5 | $5,031.00 | Feb 27, 2026 |
| X8440124 | REM EX ST LIGHT EQUIP | EACH | 5 | $2,603.89 | Jun 12, 2026 |
| X8500100 | TEMP FL BEACON INSTAL | EACH | 5 | $4,407.29 | Jun 12, 2026 |
| X8570301 | ATC SUPER P CAB SPL | EACH | 5 | $53,232.44 | Jun 12, 2026 |
| X8570304 | ATC CNTRLR, 16LB SP CAB UPS | EACH | 5 | $43,409.12 | Jun 12, 2026 |
| X8570324 | ATC TY4 STRETCHED CAB | EACH | 5 | $52,915.62 | Jun 12, 2026 |
| X8571315 | RR FAC & TY V CAB SP | EACH | 5 | $34,401.54 | Sep 20, 2024 |
| X8630104 | CONT CAB TYPE IV SPL | EACH | 5 | $23,268.39 | Apr 24, 2026 |
| X8710013 | FO CBL CDT 12F SGL MD | FOOT | 5 | $16.32 | Apr 24, 2026 |
| X8710023 | FOCC 96F SNGL MODE | FOOT | 5 | $7.07 | Jun 12, 2026 |
| X8770123 | S C MAA&P 24 SPL | EACH | 5 | $30,593.30 | Nov 17, 2023 |
| X8770152 | S C MAA&P 52 SPL | EACH | 5 | $36,471.71 | Jun 13, 2025 |
| X8850106 | IND LOOP DETECT (RM) | EACH | 5 | $338.39 | Sep 23, 2022 |
| X8900020 | MAIN EX TEMP TS INST | EACH | 5 | $21,705.05 | Sep 18, 2026 |
| XP000131 | 15A CIRCUIT BREAKR 1P | EACH | 5 | $566.88 | Apr 25, 2025 |
| XX000406 | BRICK PAVER REM & REP | SQ FT | 5 | $18.20 | Nov 17, 2023 |
| XX000541 | EXPLOR EXCAVATION | CU YD | 5 | $139.09 | Jan 16, 2026 |
| XX000882 | WOOD FENCE | FOOT | 5 | $56.35 | Jan 17, 2025 |
| XX000970 | PARKWAY RESTORATION | L SUM | 5 | $13,000.00 | Mar 7, 2025 |
| XX001249 | ORNAMENTAL FENCE | FOOT | 5 | $118.82 | Sep 19, 2025 |
| XX002185 | REL EX LIGHT POLE | EACH | 5 | $4,263.21 | Nov 8, 2024 |
| XX003848 | GYPSUM PLACEMENT | POUND | 5 | $2.75 | Jan 20, 2023 |
| XX004689 | SAN SERVICE ADJUSTED | EACH | 5 | $1,632.36 | Sep 20, 2024 |
| XX005472 | DRAINAGE STRUCTURE SP | EACH | 5 | $5,513.33 | Apr 25, 2025 |
| XX006159 | MEDIAN SOIL MIX F & P | CU YD | 5 | $58.38 | Jan 20, 2023 |
| XX006281 | SS DI T1 10 | FOOT | 5 | $139.85 | Aug 1, 2025 |
| XX006653 | FENCE (SPECIAL) | FOOT | 5 | $121.65 | Jan 17, 2025 |
| XX007147 | R&REP LAWN SPRINK SYS | FOOT | 5 | $13.60 | Nov 8, 2019 |
| XX007278 | PARKWAY RESTORATION | SQ YD | 5 | $1.08 | Apr 24, 2026 |
| XX007531 | REL EX LTPOLE/NEW FDN | EACH | 5 | $2,732.53 | Nov 7, 2025 |
| XX007952 | TERMINAL SERVER | EACH | 5 | $1,958.61 | Sep 23, 2022 |
| XX008159 | PCC BAND PAVER BRICKS | FOOT | 5 | $39.45 | Mar 7, 2025 |
| XX008310 | AGG SURF CSE B 3 SPL | SQ YD | 5 | $8.29 | Nov 8, 2024 |
| XX008392 | OUTDR RTD NTWRK CABLE | FOOT | 5 | $1.57 | Jan 16, 2026 |
| XX008436 | VALVE VAULTS 5 DIA | EACH | 5 | $4,013.60 | Nov 8, 2024 |
| XX008553 | RETAINING WALL SPL | FOOT | 5 | $38.08 | Jan 16, 2026 |
| XX008639 | SHRUBS SPECIAL | EACH | 5 | $79.32 | Jul 31, 2026 |
| XX008694 | HMA SIDEWALK REMOVAL | SQ YD | 5 | $20.98 | Jun 14, 2024 |
| XX008958 | EARTH EXC SOIL MGMT | L SUM | 5 | $31,343.32 | Sep 19, 2025 |
| XX008959 | D I WATER MAIN SPL | FOOT | 5 | $321.94 | Aug 1, 2025 |
| XX009045 | DRINKING FOUNTAIN | EACH | 5 | $12,371.56 | Jan 16, 2026 |
| XX009135 | LIGHT POLE SPECIAL T2 | EACH | 5 | $8,176.75 | Apr 24, 2026 |
| XX009157 | WATER MAIN 8 SPL | FOOT | 5 | $110.80 | Jun 13, 2025 |
Averages are weighted by quantity. "Avg low bid" uses the apparent low bidder's unit prices; "Avg all bids" uses every bidder; "Avg estimate" is TxDOT's engineer's estimate. Built from TxDOT bid tabulations loaded into Bid Potato.