| Bid code | Description | Unit | Jobs ▼ | Avg low bid | Last let |
|---|---|---|---|---|---|
| Z0021916 | SILICONE JT SEAL 3 | FOOT | 7 | $111.76 | Nov 17, 2023 |
| Z0025710 | F&I STATIC SCALE COMP | L SUM | 7 | $270,876.59 | Jun 12, 2026 |
| Z0029655 | HT CBL ROAD GUARDPOST | EACH | 7 | $190.72 | Jun 14, 2024 |
| Z0029665 | REP TB TERM T1 SP RLP | FOOT | 7 | $27.03 | Aug 2, 2024 |
| Z0030904 | TIGHTEN SPLICE FLANGE | EACH | 7 | $1,089.00 | Jan 17, 2025 |
| Z0038114 | PCC SUR REM 1/4 | SQ YD | 7 | $1.83 | Nov 17, 2023 |
| Z0038115 | PCC SUR REM 1/2 | SQ YD | 7 | $1.81 | Jan 19, 2024 |
| Z0044298 | PRESS CONN EX WTR MN | EACH | 7 | $13,754.70 | Sep 20, 2024 |
| Z0048900 | RR TRACK REMOV | FOOT | 7 | $17.04 | Apr 25, 2025 |
| Z0049804 | R&D FRIABL ASB BLD 4 | L SUM | 7 | $3,738.00 | Jan 16, 2026 |
| Z0049908 | R&D NON-FR ASB BLD 8 | L SUM | 7 | $6,751.48 | Jun 12, 2026 |
| Z0052400 | REPAIR TR BAR TERM T1 | EACH | 7 | $874.05 | Apr 26, 2024 |
| Z0052800 | REPAIR TR BAR TERM 3A | EACH | 7 | $3,321.82 | Jun 14, 2024 |
| Z0053575 | REPAIR TR BAR TRM T12 | EACH | 7 | $386.95 | Aug 2, 2024 |
| Z0054402 | ROCK FILL - REPLACE | CU YD | 7 | $57.28 | Feb 27, 2026 |
| Z0054404 | ROCK FILL - EMBANK | CU YD | 7 | $75.98 | Apr 24, 2026 |
| Z0055100 | RUMBLE RESURF | SQ YD | 7 | $73.85 | Jun 14, 2024 |
| Z0056675 | SS 2 WAT MN 30 | FOOT | 7 | $367.44 | Sep 19, 2025 |
| Z0062000 | SAW CUTTING | FOOT | 7 | $2.03 | Jun 14, 2024 |
| Z0065775 | SLOT DR 24" W/VAR SL | FOOT | 7 | $375.17 | Jun 12, 2026 |
| Z0073351 | TEMP SLAB SUPPORT SYS | L SUM | 7 | $48,845.81 | Mar 7, 2025 |
| Z0073420 | TEMP SUPPORT SYS L2 | EACH | 7 | $179,964.69 | Jul 31, 2026 |
| Z0076100 | TRACK REMOVAL | FOOT | 7 | $8.05 | Jan 17, 2025 |
| 25301800 | SEEDLINGS | UNIT | 6 | $546.33 | Feb 27, 2026 |
| 28001105 | TEMP WLDLF FRNDLY ECB | SQ YD | 6 | $1.70 | Sep 18, 2026 |
| 31000600 | PR LIM STAB SOIL M 12 | SQ YD | 6 | $4.78 | Jun 13, 2025 |
| 31101800 | SUB GRAN MAT B 10 | SQ YD | 6 | $10.38 | Nov 7, 2025 |
| 35300200 | PCC BSE CSE 7 | SQ YD | 6 | $47.75 | Mar 7, 2025 |
| 35300600 | PCC BSE CSE 11 | SQ YD | 6 | $140.16 | Aug 1, 2025 |
| 35300720 | PCC BSE CSE 13 | SQ YD | 6 | $104.99 | Mar 10, 2023 |
| 35501287 | HMA BASE CSE 2 1/4 | SQ YD | 6 | $14.16 | Nov 7, 2025 |
| 35501290 | HMA BASE CSE 3 | SQ YD | 6 | $21.15 | Apr 26, 2024 |
| 35501301 | HMA BASE CSE 4 1/4 | SQ YD | 6 | $30.46 | Jul 31, 2026 |
| 35501311 | HMA BASE CSE 6 3/4 | SQ YD | 6 | $29.25 | Apr 24, 2026 |
| 35501331 | HMA BASE CSE 11 3/4 | SQ YD | 6 | $94.34 | Feb 27, 2026 |
| 35600711 | HMA BC WID 8 3/4 | SQ YD | 6 | $44.79 | Mar 7, 2025 |
| 40600845 | P LEV BIND MM N90 | TON | 6 | $117.04 | Jun 14, 2019 |
| 40600902 | HMA BC HM N90 | TON | 6 | $181.17 | Jun 12, 2026 |
| 40604074 | HMA SC IL-9.5 E N90 | TON | 6 | $136.31 | Feb 27, 2026 |
| 40604170 | P HMA SC IL-9.5 E N50 | TON | 6 | $181.04 | Jun 12, 2026 |
| 40605005 | P HMA BC SMA 9.5 N80 | TON | 6 | $179.19 | Apr 24, 2026 |
| 40605010 | P HMA BC SMA 12.5 N50 | TON | 6 | $159.43 | Jun 13, 2025 |
| 40701896 | HMA PAVT FD 10 3/4 | SQ YD | 6 | $66.16 | Jun 12, 2026 |
| 40701906 | HMA PAVT FD 11 1/4 | SQ YD | 6 | $60.36 | Jun 13, 2025 |
| 40701951 | HMA PAVT FD 13 1/2 | SQ YD | 6 | $60.28 | Apr 26, 2024 |
| 42000211 | PCC PVT 7 1/2 JOINTD | SQ YD | 6 | $61.41 | Nov 8, 2024 |
| 42000311 | PCC PVT 8 1/2 JOINTD | SQ YD | 6 | $67.97 | Jan 16, 2026 |
| 42101424 | LUG SYSTEM COMPL 24 | EACH | 6 | $39,475.41 | Jan 16, 2026 |
| 44000150 | HMA SURF REM 1/4 | SQ YD | 6 | $1.43 | Jun 12, 2026 |
| 44000170 | HMA SURF REM 5 1/4 | SQ YD | 6 | $7.74 | Mar 8, 2024 |
| 44000175 | HMA SURF REM 6 1/2 | SQ YD | 6 | $8.19 | Jun 12, 2026 |
| 44002206 | HMA RM OV PATCH 1 1/2 | SQ YD | 6 | $3.88 | Mar 10, 2023 |
| 44200071 | PAVT PATCH T4 6 | SQ YD | 6 | $108.00 | Apr 24, 2026 |
| 44200112 | PAVT PATCH T3 9 | SQ YD | 6 | $60.30 | Jan 20, 2023 |
| 44200926 | CL B PATCH T4 7 | SQ YD | 6 | $108.02 | Feb 27, 2026 |
| 44200977 | CL B PATCH T4 10 1/2 | SQ YD | 6 | $183.40 | Jun 12, 2026 |
| 44201015 | CL B PATCH T1 14 | SQ YD | 6 | $276.48 | Sep 19, 2025 |
| 44201292 | DOWEL BARS 5/8 | EACH | 6 | $21.41 | Jun 12, 2026 |
| 44201317 | CL C PATCH T2 7 | SQ YD | 6 | $195.07 | Jan 16, 2026 |
| 44201321 | CL C PATCH T3 7 | SQ YD | 6 | $160.51 | Jan 16, 2026 |
| 44201398 | CL C PATCH T1 14 | SQ YD | 6 | $233.39 | Sep 18, 2026 |
| 44201445 | CL C PATCH T2 18 | SQ YD | 6 | $247.37 | Jan 16, 2026 |
| 44201681 | CL D PATCH T1 3 | SQ YD | 6 | $23.56 | Nov 7, 2025 |
| 44213100 | PAVEMENT FABRIC | SQ YD | 6 | $16.09 | Mar 8, 2019 |
| 44213206 | TIE BARS 5/8 | EACH | 6 | $3.15 | Mar 7, 2025 |
| 48101610 | AGGREGATE SHLDS B 9 | SQ YD | 6 | $41.71 | Sep 19, 2025 |
| 48203036 | HMA SHOULDERS 9 3/4 | SQ YD | 6 | $48.98 | Jun 13, 2025 |
| 48203046 | HMA SHOULDERS 12 1/4 | SQ YD | 6 | $59.83 | Jun 16, 2023 |
| 48203057 | HMA SHOULDERS 15 | SQ YD | 6 | $70.21 | Sep 20, 2024 |
| 48300615 | PCC SHOULDERS 11 3/4 | SQ YD | 6 | $97.15 | Jun 12, 2026 |
| 50101100 | REM EXIST STRUCT N9 | EACH | 6 | $104,422.80 | Jul 31, 2026 |
| 50201125 | COFFERDAM TYP 2 LOC 5 | EACH | 6 | $221,308.34 | Apr 25, 2025 |
| 50201126 | COFFERDAM TYP 2 LOC 6 | EACH | 6 | $221,308.34 | Apr 25, 2025 |
| 50400105 | PREC CONC BR SLAB | SQ FT | 6 | $114.82 | Jun 14, 2024 |
| 50401325 | F&E PP CON BEAM IL45N | FOOT | 6 | $517.90 | Nov 8, 2024 |
| 50500205 | FUR STRUCT STEEL | L SUM | 6 | $9,505,003.27 | Sep 18, 2026 |
| 50500305 | ERECT STRUCT STEEL | L SUM | 6 | $4,088,662.63 | Feb 27, 2026 |
| 50901125 | STEEL RAILING TEMP | FOOT | 6 | $138.02 | Jun 16, 2023 |
| 51100301 | BIT CT AG SLOPEWALL 6 | SQ YD | 6 | $32.60 | Aug 2, 2024 |
| 52000020 | PREF JOINT SEAL 1 3/4 | FOOT | 6 | $126.41 | Jun 12, 2020 |
| 52000035 | PREF JOINT SEAL 2 3/4 | FOOT | 6 | $144.71 | Jun 12, 2026 |
| 52000208 | FINGER PLT EXP JT 3 | FOOT | 6 | $3,408.92 | Jul 31, 2026 |
| 52100110 | FUR ELAST BRNG ASY T1 | EACH | 6 | $3,144.01 | Sep 18, 2026 |
| 52100400 | STEEL BEARING ASSMBLY | EACH | 6 | $15,918.42 | Jan 16, 2026 |
| 53004556 | HMA SURFACE RM (DECK) | SQ YD | 6 | $22.76 | Jun 12, 2026 |
| 54002080 | EXPAN BOLTS 3/4 X 18 | EACH | 6 | $53.32 | Jan 19, 2024 |
| 54010705 | PCBC 7X5 | FOOT | 6 | $758.55 | Apr 25, 2025 |
| 54011008 | PCBC 10X8 | FOOT | 6 | $1,445.45 | Nov 7, 2025 |
| 54011210 | PCBC 12X10 | FOOT | 6 | $1,890.05 | Aug 1, 2025 |
| 54210184 | PIPE ELBOW 15 | EACH | 6 | $895.82 | Jun 16, 2023 |
| 54214512 | PRC FL END S EQ RS 27 | EACH | 6 | $3,408.40 | Jan 16, 2026 |
| 54215472 | CIP RC END SECT 72 | EACH | 6 | $55,069.29 | Jan 16, 2026 |
| 54216180 | R C PIPE TEE 12P 12R | EACH | 6 | $1,312.17 | Mar 8, 2024 |
| 54216190 | R C PIPE TEE 18P 12R | EACH | 6 | $1,627.32 | Sep 19, 2025 |
| 5422D012 | P CUL CL D 2 12 TEMP | FOOT | 6 | $46.51 | Jan 19, 2024 |
| 54245405 | INLET BOX 542506 | EACH | 6 | $5,790.42 | Jul 31, 2026 |
| 54260415 | SLOP MET ES 15", 1:4 | EACH | 6 | $916.07 | Jun 13, 2025 |
| 54260718 | SLP MT ES WG 18",1:6 | EACH | 6 | $1,942.54 | Aug 1, 2025 |
| 54261230 | CONC ES 542001 30 1:2 | EACH | 6 | $5,423.92 | Jan 16, 2026 |
| 54261442 | CONC ES 542001 42 1:4 | EACH | 6 | $9,608.08 | Jul 31, 2026 |
Averages are weighted by quantity. "Avg low bid" uses the apparent low bidder's unit prices; "Avg all bids" uses every bidder; "Avg estimate" is TxDOT's engineer's estimate. Built from TxDOT bid tabulations loaded into Bid Potato.