18,642Let jobs
$76,971,155,782Total low bids
$79,237,330,402Total estimates
-2.9%Low bids vs estimates
All dates results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Dec 4, 2024 | 6472-61-001RMC - 647261001 | El Paso El Paso |
Metal Beam Guardrail Fence Repair -EAOIH0010 · Routine Maintenance Project - Sealed | $1,628,400 | $1,234,611 | ROSS SA ENTERPRISE LLC | -24.2% | 5 |
| Dec 4, 2024 | 6389-95-001MMC - 638995001 | Hill Waco |
FY2025 Limestone Rock Asphalt (Hill)US0077 · Material Maintenance Project | $1,126,000 | $1,057,040 | VULCAN CONSTRUCTION MATERIALS, LLC | -6.1% | 2 |
| Dec 4, 2024 | 0902-90-329C 902-90-329 | Tarrant Fort Worth |
VariousVarious · Bridge Maintenance | $1,446,722 | $896,116 | 12TWELVE ROAD AND BRIDGE LLC | -38.1% | 11 |
| Dec 4, 2024 | 6473-05-001RMC - 647305001 | Val Verde Maintenance Division |
Langtry TIC Site RenovationSL0025 · Routine Maintenance Project | $894,785 | $874,350 | RELMCO, INC. | -2.3% | 4 |
| Dec 4, 2024 | 6463-30-001RMC - 646330001 | Montgomery Houston |
Mowing State ROW RMC 6463-30-001IH0045 · Routine Maintenance Project - Sealed | $943,946 | $845,281 | DOMINION ENGINEERING MANAGEMENT SERVICES (DEMS), LLC | -10.5% | 4 |
| Dec 4, 2024 | 0114-01-068BR 2024(495) | Travis Austin |
US 290E at IH 35 BMIPUS 290 · Bridge Maintenance | $801,600 | $768,495 | AAD CONTRACTING INC. | -4.1% | 5 |
| Dec 4, 2024 | 0500-01-155C 500-1-155 | Galveston Houston |
IH 45, Virginia Point Rd to SH 275IH 45 · Transportation Non-Roadway | $1,360,850 | $709,917 | SICE, INC. | -47.8% | 8 |
| Dec 4, 2024 | 3256-01-129C 3256-1-129 | Harris Houston |
SL 8, SH 249 to E of Ella BlvdSL 8 · Traffic Control Devices | $511,621 | $405,811 | PROFESSIONAL TRAFFIC CONTROL LLC | -20.7% | 4 |
| Dec 4, 2024 | 6475-68-001MMC - 647568001 | Guadalupe Maintenance Division |
FY 25 Seguin RDC Bagged ASPPMSH0046 · Material Maintenance Project | $289,000 | $212,500 | WALLER COUNTY ASPHALT INC. | -26.5% | 3 |
| Dec 4, 2024 | 6475-63-001MMC - 647563001 | Garza Maintenance Division |
FY 25 Post RDC Pre-Packaged ConcreteUS0084 · Material Maintenance Project | $204,000 | $159,800 | AKA-MATERIALS | -21.7% | 7 |
| Dec 4, 2024 | 6475-64-001MMC - 647564001 | Henderson Maintenance Division |
FY 25 Athens RDC Pre-Packaged ConcreteSL0007 · Material Maintenance Project | $204,000 | $151,980 | AKA-MATERIALS | -25.5% | 6 |
| Dec 4, 2024 | 6475-67-001MMC - 647567001 | Henderson Maintenance Division |
FY 25 Athens RDC Bagged ASPPMSL0007 · Material Maintenance Project | $204,000 | $150,000 | WALLER COUNTY ASPHALT INC. | -26.5% | 5 |
| Dec 4, 2024 | 0902-20-236STP 2025(246)HES | Wise Fort Worth |
HSIP 2024 Wise Co Var LocationVarious · Safety Improvement Projects | $279,420 | $149,400 | MARCOM'S MOWING SERVICE, LLC | -46.5% | 7 |
| Dec 4, 2024 | 6475-65-001MMC - 647565001 | Guadalupe Maintenance Division |
FY 25 Seguin RDC Pre-Packaged ConcreteSH0046 · Material Maintenance Project | $180,000 | $135,000 | TOUCHSTONE RESOURCES, LLC | -25.0% | 5 |
| Dec 4, 2024 | 6475-66-001MMC - 647566001 | Garza Maintenance Division |
FY 25 Post RDC Bagged ASPPMUS0084 · Material Maintenance Project | $170,000 | $125,000 | WALLER COUNTY ASPHALT INC. | -26.5% | 5 |
| Dec 3, 2024 | 0047-05-057F 2025(482) | Collin Dallas |
SH 5 Stewart Road to Eldorado ParkwaySH 5 · Widen Non-Freeway | $188,570,915 | $157,359,015 | WEBBER, LLC | -16.6% | 4 |
| Dec 3, 2024 | 2858-02-011C 2508-2-11 | Jones Abilene |
DISTRICT SEAL COAT FY 25 2858-02FM 2834 · Seal Coat | $14,375,295 | $14,844,601 | LIPHAM ASPHALT AND PAVING COMPANY, LLC | +3.3% | 5 |
| Dec 3, 2024 | 0009-18-021F 2025(272) | Hopkins Paris |
FY 2025 Seal Coat BU 67 VBU 67V · Seal Coat | $13,199,845 | $14,548,149 | CDM HOLDINGS | +10.2% | 2 |
| Dec 3, 2024 | 0912-00-699F 2025(341) | Harris Houston |
Various Locations - Overhead SignsVarious · Safety Improvement Projects | $17,178,800 | $12,243,838 | SELECT MAINTENANCE, L.L.C. | -28.7% | 6 |
| Dec 3, 2024 | 0069-02-031F 2025(294) | Glasscock San Angelo |
0069-02-031 US 87 A-R SEAL COATUS 87 · Seal Coat | $9,153,412 | $8,400,199 | COX PAVING OF TEXAS, INC. | -8.2% | 2 |
| Dec 3, 2024 | 0250-03-051F 2025(244) | Erath Fort Worth |
US 281; Palo Pinto Co. Line to FM 8US 281 · Seal Coat | $6,533,659 | $6,375,558 | NORTHEASTERN PAVERS, LLC | -2.4% | 3 |
| Dec 3, 2024 | 2121-02-179STP 2025(290)HES | El Paso El Paso |
ELP_IH0010_1-SYSIH 10 · Safety Improvement Projects | $6,053,315 | $6,226,703 | TRI STATE ELECTRIC, LTD. | +2.9% | 2 |
| Dec 3, 2024 | 0904-11-064C 904-11-64 | Randall Amarillo |
TP&W CANONCITA PROJECTVarious · Texas Park and Wildlife | $5,252,420 | $4,199,123 | L A FULLER & SONS CONSTRUCTION, LTD. | -20.1% | 5 |
| Dec 3, 2024 | 0902-00-382F 2025(245) | Palo Pinto Fort Worth |
Districtwide Flexible PavementFM 919 · Rehabilitation of Existing Road | $4,038,963 | $4,012,954 | A. L. HELMCAMP, INC. | -0.6% | 7 |
| Dec 3, 2024 | 0271-15-099F 2025(280) | Harris Houston |
IH 610: Market St to W of Mercury; D.C.IH 610 · Freeway Operational Improvements | $4,638,209 | $3,950,379 | MC2 CIVIL, LLC | -14.8% | 11 |
| Dec 3, 2024 | 1533-01-022C 1533-1-22 | Bastrop Austin |
FM 1704 from Lower Elgin Rd to FM 969FM 1704 · Overlay | $3,294,015 | $2,843,419 | LONE STAR PAVING COMPANY | -13.7% | 6 |
| Dec 3, 2024 | 0909-38-090BR 2023(425) | Falls Waco |
BR | FCR 157 @ COPPERAS CREEK |(MAP #83)COUNTY ROAD 256 · Bridge Replacement | $3,169,901 | $2,820,729 | SKYLINE BRIDGE LLC | -11.0% | 8 |
| Dec 3, 2024 | 0912-72-747C 912-72-747 | Harris Houston |
SEAO - Misc Bridge Repairs - FY 25Various · Bridge Widening or Rehabilitation | $2,689,406 | $2,588,189 | ISI CONTRACTING, INC. | -3.8% | 5 |
| Dec 3, 2024 | 0081-01-053BR 2025(243) | Tarrant Fort Worth |
SH 121: SH 121 WB@ IH 35W SBSS 347 · Bridge Maintenance | $1,658,356 | $2,584,708 | BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC | +55.9% | 5 |
| Dec 3, 2024 | 0919-19-085STP 2B22(006)TAPS | Bowie Atlanta |
N Robison Rd from W 15th St to RichmondROBISON RD N · Pedestrian, Sidewalks & Curb Ramps | $2,287,179 | $1,943,602 | GARRET SHIELDS INFRASTRUCTURE | -15.0% | 8 |
| Dec 3, 2024 | 6472-29-001MMC - 647229001 | McLennan Waco |
Flex Base, Agg. & Rip Rap - DistrictwideFM0185 · Material Maintenance Project | $1,912,025 | $1,646,175 | TOUCHSTONE RESOURCES, LLC | -13.9% | 3 |
| Dec 3, 2024 | 6472-41-001RMC - 647241001 | Tarrant Fort Worth |
FY25 Mowing and Herbicide South TarrantIH0030 · Routine Maintenance Project - Sealed | $2,988,899 | $1,567,970 | CENTRAL NORTH CONSTRUCTION, LLC | -47.5% | 4 |
| Dec 3, 2024 | 6473-55-001RMC - 647355001 | Bell Waco |
BASE FAILURE PAVEMENT REPAIRFM0437 · Routine Maintenance Project | $1,638,415 | $1,547,097 | TEXAS MATERIALS GROUP, INC. | -5.6% | 3 |
| Dec 3, 2024 | 0114-12-017C 114-12-17 | Harris Houston |
US 290 Truck ParkingUS 290 · Transportation Non-Roadway | $1,925,152 | $1,523,998 | FORDE CONSTRUCTION COMPANY, INC. | -20.8% | 6 |
| Dec 3, 2024 | 6474-34-001RMC - 647434001 | Bexar San Antonio |
FY 25 Districtwide Pavement MarkingsIH0410 · Routine Maintenance Project - Sealed | $2,953,497 | $1,479,950 | TRP INFRASTRUCTURE SERVICES, LLC | -49.9% | 4 |
| Dec 3, 2024 | 0923-23-032BR 2025(133) | Mills Brownwood |
CR 508 at Draw Mills CountyCOUNTY ROAD 508 · Bridge Replacement | $1,708,452 | $1,470,000 | DELGADO'S CONTRACTORS, LLC | -14.0% | 9 |
| Dec 3, 2024 | 6469-18-001MMC - 646918001 | Gregg Tyler |
FY 25 Hot Mix Superpave Gregg CountySL0281 · Material Maintenance Project | $1,080,930 | $1,325,170 | LONGVIEW ASPHALT, INC. | +22.6% | 1 |
| Dec 3, 2024 | 0912-72-743C 912-72-743 | Harris Houston |
IH 610, Braeswood Blvd to SH 225Various · Traffic Control Devices | $1,881,969 | $1,317,622 | TRP INFRASTRUCTURE SERVICES, LLC | -30.0% | 4 |
| Dec 3, 2024 | 6475-14-001RMC - 647514001 | Bowie Atlanta |
CO Pavement Markings VariousUS0059 · Routine Maintenance Project - Sealed | $1,239,590 | $1,182,650 | STRIPE-A-ZONE, LLC | -4.6% | 3 |
| Dec 3, 2024 | 6475-42-001MMC - 647542001 | Hood Fort Worth |
FY25 MMC Flex Pave Hood/SomervellSH0144 · Material Maintenance Project | $984,000 | $1,080,000 | TOUCHSTONE RESOURCES, LLC | +9.8% | 1 |
| Dec 3, 2024 | 6472-62-001MMC - 647262001 | El Paso El Paso |
Emulsion - MMCFM3380 · Material Maintenance Project | $1,048,616 | $1,048,616 | ERGON ASPHALT & EMULSIONS, INC. | 0.0% | 1 |
| Dec 3, 2024 | 6472-00-001RMC - 647200001 | Hidalgo Pharr |
On Call Pavement Markings FY 25IH0002 · Routine Maintenance Project - Sealed | $834,095 | $767,105 | PAVEMENT MARKINGS INC. | -8.0% | 3 |
| Dec 3, 2024 | 6471-90-001RMC - A00211693 | Fort Bend Houston |
RMC 6471-90 Guardrail RepairUS0059 · Routine Maintenance Project - Sealed | $985,425 | $732,257 | BK FIELD OPERATIONS LLC | -25.7% | 8 |
| Dec 3, 2024 | 0164-03-056F 2025(247) | Henderson Tyler |
SH 31, Sawmill Rd Traffic/Ped SignalSH 31 · Traffic Control Devices | $385,333 | $341,595 | STRIPING TECHNOLOGY, L.P. | -11.4% | 2 |
| Dec 3, 2024 | 6471-04-001RMC - 647104001 | Tarrant Fort Worth |
FY25 Tree & Brush Removal South TarrantIH0030 · Routine Maintenance Project - Sealed | $349,690 | $241,177 | AUSTIN BARRICADE COMPANY, L.L.C. | -31.0% | 8 |
| Dec 3, 2024 | 6472-31-001RMC - 647231001 | Hill Waco |
Sweeping - Hill, Limestone, Fall FY25SH0022 · Routine Maintenance Project | $115,718 | $112,762 | RHINO EQUITY, LLC | -2.6% | 1 |
| Dec 3, 2024 | 0621-01-118F 2025(196) | Hidalgo Pharr |
SH 336 @ HACKNEY LAKE FLOODWAY FY 2025SH 336 · Bridge Maintenance | $52,700 | $19,151 | STRUCTURAL INTEGRITY GROUP LLC | -63.7% | 7 |
| Dec 2, 2024 | 6477-56-001EMC - 647756001 | Dallas Dallas |
EMC IH635 @ MacAuthur 05 1224IH0635 · Emergency Maintenance Project - Sealed | $750,740 | $750,740 | IBCTX, LLC | 0.0% | 1 |
| Nov 26, 2024 | 6476-35-001MMC - 647635001 | Brown Brownwood |
EMULSION (MATERIAL ONLY) NORTH 2024US0377 · Material Maintenance Project | $930,090 | $889,200 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | -4.4% | 2 |
| Nov 26, 2024 | 6473-49-001RMC - 647349001 | Waller Houston |
RMC 6473-49-001 Traffic ControlUS0290 · Routine Maintenance Project - Sealed | $637,725 | $567,100 | RHINO EQUITY, LLC | -11.1% | 4 |
| Nov 26, 2024 | 6475-30-001MMC - 647530001 | Brewster El Paso |
De-Icing / Anti Icing (Material Only)SH0118 · Material Maintenance Project | $465,623 | $420,329 | NSG LOGISTICS, LLC | -9.7% | 2 |
| Nov 26, 2024 | 6473-26-001RMC - 647326001 | Taylor Abilene |
2025 Call Out TCP ABL AOIH0020 · Routine Maintenance Project - Sealed | $524,890 | $418,500 | AWP SAFETY | -20.3% | 2 |
| Nov 26, 2024 | 6473-27-001RMC - 647327001 | Howard Abilene |
2025 Call Out TCP BSP AOIH0020 · Routine Maintenance Project - Sealed | $563,595 | $410,935 | AWP SAFETY | -27.1% | 2 |
| Nov 26, 2024 | 6465-10-001RMC - 646510001 | Harris Houston |
FY 24, Full Depth Rpr & Pavement MarkingSH0249 · Routine Maintenance Project - Sealed | $571,547 | $345,227 | FORDE CONSTRUCTION COMPANY, INC. | -39.6% | 4 |
| Nov 26, 2024 | 6473-60-001RMC - 647360001 | Waller Houston |
RMC 6473-60 Cleaning & Sweeping HighwaysUS0290 · Routine Maintenance Project | $363,800 | $289,714 | T & M LAWN-FENCE SERVICE, LLC | -20.4% | 4 |
| Nov 26, 2024 | 6474-69-001RMC - 647469001 | Howard Abilene |
2025 Tree TrimmingIH0020 · Routine Maintenance Project - Sealed | $316,750 | $231,515 | S FOWLER SERVICES LLC | -26.9% | 5 |
| Nov 26, 2024 | 6474-37-001MMC - 647437001 | El Paso El Paso |
Asphaltic Patching MaterialUS0054 · Material Maintenance Project | $172,200 | $189,750 | TOUCHSTONE RESOURCES, LLC | +10.2% | 1 |
| Nov 26, 2024 | 6477-19-001MMC - 647719001 | San Saba Brownwood |
EMULSION (MATERIAL ONLY) SOUTH 2024US0190 · Material Maintenance Project | $96,120 | $79,200 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | -17.6% | 1 |
| Nov 24, 2024 | 6477-96-001SUP - 647796001 | Coryell Waco |
Janitorial Services - CoryellUS0084 · State Use Project | $11,785 | $11,785 | HEART OF TEXAS GOODWILL INDUSTRIES, INC. | 0.0% | 2 |
| Nov 22, 2024 | 6476-68-001MMC - 647668001 | Shackelford Abilene |
D-GR HMA Abilene District East RegionUS0180 · Material Maintenance Project | $313,575 | $320,925 | ZACK BURKETT CO. | +2.3% | 3 |
| Nov 22, 2024 | 6476-94-001MMC - 647694001 | Jones Abilene |
Abl-District LRA DSUS0277 · Material Maintenance Project | $46,300 | $45,448 | VULCAN CONSTRUCTION MATERIALS, LLC | -1.8% | 2 |
| Nov 21, 2024 | 6474-11-001SUP - 647411001 | Webb Laredo |
Litter Removal - Laredo Webb CountyIH0035 · State Use Project - Sealed | $883,490 | $883,490 | WORLD TECHNICAL SERVICES, INC. | 0.0% | 2 |
| Nov 21, 2024 | 6474-49-001MMC - 647449001 | Kinney Laredo |
LRA KinneyUS0277 · Material Maintenance Project - Sealed | $860,100 | $856,000 | VULCAN CONSTRUCTION MATERIALS, LLC | -0.5% | 2 |
| Nov 21, 2024 | 6475-90-001MMC - 647590001 | Wood Tyler |
FY25 Emulsion MineolaUS0069 · Material Maintenance Project | $492,950 | $507,175 | ERGON ASPHALT & EMULSIONS, INC. | +2.9% | 1 |
| Nov 21, 2024 | 6476-13-001MMC - 647613001 | Smith Tyler |
FY25 Emulsion - TylerSH0155 · Material Maintenance Project | $478,300 | $452,820 | ERGON ASPHALT & EMULSIONS, INC. | -5.3% | 1 |
| Nov 21, 2024 | 6473-25-001RMC - 647325001 | Hopkins Paris |
Hopkins Co. FUA bridge workIH0030 · Routine Maintenance Project - Sealed | $371,078 | $427,200 | GARRET SHIELDS INFRASTRUCTURE | +15.1% | 5 |
| Nov 21, 2024 | 6474-80-001MMC - 647480001 | Maverick Laredo |
Emulsion in MaverickUS0277 · Material Maintenance Project - Sealed | $378,400 | $378,400 | ERGON ASPHALT & EMULSIONS, INC. | 0.0% | 1 |
| Nov 21, 2024 | 6467-79-001BPM - 646779001 | Red River Paris |
BPM Red River FY25 #2SH0037 · Bridge Preventative Maintenance - Sealed | $430,776 | $327,282 | BECK-REIT & SONS, LTD. | -24.0% | 6 |
| Nov 21, 2024 | 6476-77-001MMC - 647677001 | Van Zandt Tyler |
LRA Van Zandt FY25US0080 · Material Maintenance Project | $290,000 | $318,600 | MARTIN MARIETTA MATERIALS, INC. | +9.9% | 2 |
| Nov 21, 2024 | 6474-00-001RMC - 647400001 | Red River Paris |
On Call Tree Removal/Trim Red River CoUS0082 · Routine Maintenance Project - Sealed | $269,550 | $220,125 | MERCER TREE SERVICE | -18.3% | 5 |
| Nov 21, 2024 | 6473-99-001RMC - 647399001 | Lamar Paris |
On Call Tree Trimming & Removal PAOUS0082 · Routine Maintenance Project - Sealed | $275,300 | $200,825 | MERCER TREE SERVICE | -27.1% | 3 |
| Nov 21, 2024 | 6474-92-001RMC - 647492001 | Lamar Paris |
On Call Ditch and Culvert-PAO FY25US0082 · Routine Maintenance Project - Sealed | $213,750 | $162,950 | RHINO EQUITY, LLC | -23.8% | 4 |
| Nov 21, 2024 | 6473-15-001MMC - 647315001 | Lamar Paris |
Sheet Pilings - Paris HQUS0271 · Material Maintenance Project - Sealed | $117,600 | $83,468 | SOUTHERN SOURCING SOLUTIONS, LLC | -29.0% | 2 |
| Nov 20, 2024 | 6466-89-001RMC - 646689001 | Baylor Wichita Falls |
Crack Seal FY 2025US0082 · Routine Maintenance Project - Sealed | $903,861 | $1,232,490 | CRACKSEAL OF TEXAS, LLC | +36.4% | 5 |
| Nov 20, 2024 | 6474-09-001RMC - 647409001 | Nacogdoches Lufkin |
2025 Nacogdoches County Ditch CleaningSH0021 · Routine Maintenance Project | $479,000 | $398,350 | TEXAS DRAINAGE INC. | -16.8% | 5 |
| Nov 20, 2024 | 6473-64-001MMC - 647364001 | Palo Pinto Fort Worth |
FY25 Palo Pinto MMC - Hydraulic CementIH0020 · Material Maintenance Project | $312,190 | $310,000 | TOUCHSTONE RESOURCES, LLC | -0.7% | 1 |
| Nov 20, 2024 | 6475-76-001RMC - 647576001 | Harrison Atlanta |
ROW Mowing Tract 6 FY2025US0080 · Routine Maintenance Project | $322,772 | $280,302 | CEHAND SERVICES LLC | -13.2% | 4 |
| Nov 20, 2024 | 6475-77-001RMC - 647577001 | Titus Atlanta |
ROW Mowing Tract 7 FY2025US0271 · Routine Maintenance Project | $280,972 | $266,184 | RENEGADE SITE SOLUTIONS, LLC | -5.3% | 5 |
| Nov 20, 2024 | 6475-78-001RMC - 647578001 | Bowie Atlanta |
ROW Mowing Tract 8 FY2025US0259 · Routine Maintenance Project | $249,432 | $235,648 | PERRY WEST | -5.5% | 2 |
| Nov 20, 2024 | 6475-75-001RMC - 647575001 | Cass Atlanta |
ROW Mowing Tract 5 FY2025FM0251 · Routine Maintenance Project | $227,924 | $227,864 | CROSS PLUS CONSTRUCTION, LLC | 0.0% | 3 |
| Nov 20, 2024 | 6475-71-001RMC - 647571001 | Panola Atlanta |
ROW Mowing Tract 1 FY2025US0059 · Routine Maintenance Project | $206,492 | $191,983 | AABA MOWING CONTRACTORS, LIMITED LIABILITY COMPANY | -7.0% | 4 |
| Nov 20, 2024 | 6472-05-001RMC - 647205001 | Titus Atlanta |
PREP ROW IH0030 FY 2025IH0030 · Routine Maintenance Project | $414,227 | $186,448 | H. H. HOWARD & SONS, INC. | -55.0% | 5 |
| Nov 20, 2024 | 6475-73-001RMC - 647573001 | Upshur Atlanta |
ROW Mowing Tract 3 FY2025FM0556 · Routine Maintenance Project | $206,616 | $177,689 | SCOUT 5 CONSTRUCTION LLC | -14.0% | 7 |
| Nov 20, 2024 | 6475-72-001RMC - 647572001 | Morris Atlanta |
ROW Mowing Tract 2 FY2025FM0161 · Routine Maintenance Project | $193,596 | $168,280 | SCOUT 5 CONSTRUCTION LLC | -13.1% | 5 |
| Nov 20, 2024 | 6475-79-001RMC - 647579001 | Bowie Atlanta |
ROW Mowing Tract 9 FY 2025IH0030 · Routine Maintenance Project | $164,880 | $155,358 | CROSS PLUS CONSTRUCTION, LLC | -5.8% | 2 |
| Nov 20, 2024 | 6475-74-001RMC - 647574001 | Marion Atlanta |
ROW Mowing Tract 4 FY2025SH0049 · Routine Maintenance Project | $166,858 | $144,903 | CEHAND SERVICES LLC | -13.2% | 5 |
| Nov 20, 2024 | 6473-00-001MMC - 647300001 | Palo Pinto Fort Worth |
FY25 MMC Flex Base Palo PintoIH0020 · Material Maintenance Project | $120,550 | $71,250 | ZACK BURKETT CO. | -40.9% | 2 |
| Nov 19, 2024 | 6470-62-001RMC - A00211148 | Kimble San Angelo |
2025 DISTRICT WIDE CRACK SEALUS0377 · Routine Maintenance Project - Sealed | $655,626 | $737,490 | E.V.G. ENTERPRISE | +12.5% | 5 |
| Nov 19, 2024 | 6475-87-001RMC - 647587001 | Nueces Corpus Christi |
6475-87-001 Illumination MaintenanceSH0358 · Routine Maintenance Project - Sealed | $749,399 | $730,498 | MALDONADO-BURKETT, LLP | -2.5% | 2 |
| Nov 19, 2024 | 6476-38-001MMC - 647638001 | Nueces Corpus Christi |
6476-38-001 Hot Mix CC Maint.SH0358 · Material Maintenance Project | $575,000 | $557,000 | ANDERSON COLUMBIA CO., INC. | -3.1% | 1 |
| Nov 19, 2024 | 6475-94-001MMC - 647594001 | Jim Wells Corpus Christi |
6475-94-001Flex Base Live Oak GW Maint.US0281 · Material Maintenance Project | $520,000 | $480,000 | TOUCHSTONE RESOURCES, LLC | -7.7% | 5 |
| Nov 19, 2024 | 6476-30-001MMC - 647630001 | San Augustine Lufkin |
2024-11 San Augustine CRS2PUS0096 · Material Maintenance Project | $468,650 | $458,950 | CLEVELAND ASPHALT PRODUCTS, INC. | -2.1% | 1 |
| Nov 19, 2024 | 6474-07-001MMC - 647407001 | Sabine Lufkin |
2024-11 Sabine CRS2PFM0083 · Material Maintenance Project | $468,650 | $457,150 | CLEVELAND ASPHALT PRODUCTS, INC. | -2.5% | 1 |
| Nov 19, 2024 | 6476-71-001MMC - 647671001 | Polk Lufkin |
2024-11 Polk CRS2PUS0059 · Material Maintenance Project | $468,650 | $452,200 | CLEVELAND ASPHALT PRODUCTS, INC. | -3.5% | 1 |
| Nov 19, 2024 | 6475-98-001MMC - 647598001 | Nueces Corpus Christi |
6475-98-001 LRA CCAOSH0358 · Material Maintenance Project | $348,000 | $348,650 | MARTIN MARIETTA MATERIALS, INC. | +0.2% | 2 |
| Nov 19, 2024 | 6475-88-001BPM - 647588001 | Kleberg Corpus Christi |
6475-88-001 Conc. Struc. RepairUS0077 · Bridge Preventative Maintenance - Sealed | $449,119 | $296,578 | BECK-REIT & SONS, LTD. | -34.0% | 8 |
| Nov 19, 2024 | 6476-27-001RMC - 647627001 | Brazos Bryan |
FY25 - Bryan AO RPM - 12SH0006 · Routine Maintenance Project | $284,800 | $270,206 | TRP INFRASTRUCTURE SERVICES, LLC | -5.1% | 3 |
| Nov 19, 2024 | 6475-95-001MMC - 647595001 | Kleberg Corpus Christi |
6475-95-001 Flex Base Kingsville MaintUS0077 · Material Maintenance Project | $291,600 | $269,784 | MARTIN MARIETTA MATERIALS, INC. | -7.5% | 5 |
| Nov 19, 2024 | 6475-96-001MMC - 647596001 | Refugio Corpus Christi |
6475-96-001 Flex Base Refugio MaintUS0077 · Material Maintenance Project | $295,000 | $258,125 | ANDERSON COLUMBIA CO., INC. | -12.5% | 5 |
| Nov 19, 2024 | 6476-39-001MMC - 647639001 | Washington Bryan |
FY25 - Brenham AO Hyd. CementSH0036 · Material Maintenance Project | $213,046 | $205,141 | TOUCHSTONE RESOURCES, LLC | -3.7% | 2 |
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.