18,642Let jobs
$76,971,155,782Total low bids
$79,237,330,402Total estimates
-2.9%Low bids vs estimates
All dates results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| May 1, 2025 | 0910-00-146BR 2025(708) | Smith Tyler |
FY 25 Bridges @ Various LocationsVarious · Bridge Widening or Rehabilitation | $6,648,675 | $7,333,628 | BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC | +10.3% | 4 |
| May 1, 2025 | 0177-11-162F 2B24(248) | Harris Houston |
IH 69, IH 10 to Langley RdIH 69 · Transportation Non-Roadway | $7,050,244 | $6,683,209 | DECO CONTRACTORS, INC. | -5.2% | 7 |
| May 1, 2025 | 0255-07-152C 255-7-152 | Hidalgo Pharr |
IH 69C Overlay FY 2025IH 69C · Overlay | $7,870,655 | $6,414,834 | FOREMOST PAVING, INC. | -18.5% | 4 |
| May 1, 2025 | 0113-13-195CC 113-13-195 | Travis Austin |
SL 360 - Courtyard to RM 2222SL 360 · Transportation Non-Roadway | $6,572,486 | $6,242,242 | JORDAN FOSTER CONSTRUCTION, LLC | -5.0% | 4 |
| May 1, 2025 | 0553-03-034BR 2025(726) | Nacogdoches Lufkin |
SH 7 at Morral Creek (BR)SH 7 · Bridge Replacement | $7,373,105 | $6,230,927 | THK CONSTRUCTION LLC | -15.5% | 8 |
| May 1, 2025 | 0141-08-051STP 2025(713)HES | Kimble San Angelo |
0141-08-051 I-10 UPGRADE MBGFIH 10 · Safety Improvement Projects | $7,328,607 | $5,866,107 | RELMCO, INC. | -20.0% | 5 |
| May 1, 2025 | 0514-01-047F 2025(719) | Wichita Wichita Falls |
SH 240, FM 1813 to FM 369SH 240 · Widen Non-Freeway | $7,266,665 | $5,650,321 | ZACK BURKETT CO. | -22.2% | 4 |
| May 1, 2025 | 0049-09-102F 2025(359) | Brazos Bryan |
BS 6-R F:N of SH 21. T:FM 158 - InterimBS 6R · Intersection & Operational Imprv | $4,885,537 | $4,454,973 | LARRY YOUNG PAVING, INC. | -8.8% | 4 |
| May 1, 2025 | 0092-13-031BR 2025(698) | Navarro Dallas |
BI 45-F at Post Oak CreekBI 45F · Bridge Replacement | $4,230,373 | $3,850,000 | PMCO CONSTRUCTION LLC | -9.0% | 10 |
| May 1, 2025 | 0156-06-065F 2025(721) | Baylor Wichita Falls |
US 82; 3mi E US 183 to Archer CL EB OnlyUS 82 · Overlay | $3,874,000 | $3,193,078 | ZACK BURKETT CO. | -17.6% | 4 |
| May 1, 2025 | 0916-00-248C 916-00-248 | Nueces Corpus Christi |
IH37 DMS Live Oak San PatVarious · Traffic Control Devices | $3,356,297 | $2,925,020 | TRAF-TEX, INC. | -12.8% | 6 |
| May 1, 2025 | 0258-10-050F 2025(771) | McLennan Waco |
ADA | SL396 | US 84 to Bagby AveSL 396 · Pedestrian, Sidewalks & Curb Ramps | $2,956,391 | $2,695,684 | TI-ZACK CONCRETE, LLC | -8.8% | 6 |
| May 1, 2025 | 6448-25-001RMC - A00200313 | Tarrant Fort Worth |
FY25 Signal Maintenance TarrantIH0020 · Routine Maintenance Project - Sealed | $1,967,200 | $2,385,405 | WG ENGINEERING & CONSTRUCTION, LLC | +21.3% | 1 |
| May 1, 2025 | 0915-00-274F 2025(734) | Bexar San Antonio |
VA: 0915-00-274; TCDVarious · Traffic Control Devices | $2,761,060 | $2,368,226 | DAN WILLIAMS COMPANY | -14.2% | 3 |
| May 1, 2025 | 0008-08-080STP 2025(751)HES | Dallas Dallas |
SH 180 from Bagdad Rd to MacArthur BvdSH 180 · Safety Improvement Projects | $2,115,095 | $2,361,632 | WG ENGINEERING & CONSTRUCTION, LLC | +11.7% | 4 |
| May 1, 2025 | 0914-00-558C 914-00-558 | Travis Austin |
BAAO/STAO - BR FUA Repairs (FY25)Various · Bridge Maintenance | $3,325,546 | $2,334,542 | ICOS MANAGEMENT, LLC | -29.8% | 8 |
| May 1, 2025 | 0913-27-097BR 2B23(253) | Victoria Yoakum |
CR 27 BRIDGE REPLACEMENT 2702COLOGNE RD · Bridge Replacement | $2,250,730 | $1,925,463 | STX CIVIL | -14.5% | 7 |
| May 1, 2025 | 0915-00-298F 2025(735) | Bexar San Antonio |
VA: 0915-00-298: TCDVarious · Traffic Control Devices | $2,785,310 | $1,855,565 | INTERSTATE BARRICADES & MARKINGS, INC. | -33.4% | 5 |
| May 1, 2025 | 0909-22-221C 909-22-221 | McLennan Waco |
SFT | Districtwide Green Signs ProjectVarious · Safety Improvement Projects | $2,178,981 | $1,843,384 | HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC | -15.4% | 10 |
| May 1, 2025 | 6478-86-001RMC - A00213665 | Lamar Paris |
On Call TY I & Specialty Striping-NorthUS0082 · Routine Maintenance Project - Sealed | $2,037,559 | $1,840,029 | STRIPING TECHNOLOGY, L.P. | -9.7% | 4 |
| May 1, 2025 | 6482-31-001RMC - A00214710 | Hidalgo Pharr |
6482-31-001 FY 25 SAFETY LIGHTINGIH0002 · Routine Maintenance Project - Sealed | $1,749,889 | $1,676,037 | 3LW CIVIL LLC | -4.2% | 4 |
| May 1, 2025 | 6481-95-001RMC - A00214606 | Tom Green San Angelo |
Traffic Control Services FY 25US0087 · Routine Maintenance Project - Sealed | $1,327,656 | $1,377,750 | ROSS SA ENTERPRISE LLC | +3.8% | 2 |
| May 1, 2025 | 2398-01-057BR 2025(716) | Taylor Abilene |
BMIP SL 322 NB AT UPRR TAYLOR COSL 322 · Bridge Maintenance | $1,390,494 | $1,338,127 | TI-ZACK CONCRETE, LLC | -3.8% | 9 |
| May 1, 2025 | 6478-66-001RMC - A00213435 | El Paso El Paso |
Rigid Pavement Repair -EAOIH0010 · Routine Maintenance Project - Sealed | $1,381,000 | $1,271,955 | SYNERGY PROJECT CONTRACTORS, INC. | -7.9% | 2 |
| May 1, 2025 | 1068-03-024C 1068-3-24 | Tarrant Fort Worth |
SS 341SS 341 · Overlay | $1,576,570 | $1,214,768 | PEACHTREE CONSTRUCTION, LTD. | -22.9% | 5 |
| May 1, 2025 | 6476-04-001RMC - A00212736 | Harris Houston |
6476-04-001 Guardrail Repairs FY25SL0008 · Routine Maintenance Project - Sealed | $1,509,733 | $1,126,484 | ROSS SA ENTERPRISE LLC | -25.4% | 6 |
| May 1, 2025 | 0001-04-112BR 2B24(136) | El Paso El Paso |
US 85 BRIDGE REHAB (OVER BNSF RR YARD)US 85 · Bridge Widening or Rehabilitation | $1,411,458 | $967,190 | STRUCTURAL INTEGRITY GROUP LLC | -31.5% | 5 |
| May 1, 2025 | 0924-35-021C 924-35-21 | Brewster El Paso |
TPW PROJECT (BLACK GAP WMA)Various · Texas Park and Wildlife | $1,109,483 | $894,200 | DIGG COMMERCIAL, LLC | -19.4% | 4 |
| May 1, 2025 | 0919-03-067STP 2025(705)HES | Harrison Atlanta |
Delia Drive off-system HSIP projectDELIA ST · Safety Improvement Projects | $1,224,209 | $829,830 | THK CONSTRUCTION LLC | -32.2% | 6 |
| May 1, 2025 | 6474-33-001RMC - A00212370 | Denton Dallas |
Long Line Striping 04 0425US0377 · Routine Maintenance Project - Sealed | $1,093,277 | $748,277 | TRP INFRASTRUCTURE SERVICES, LLC | -31.6% | 6 |
| May 1, 2025 | 0914-00-508C 914-00-508 | Travis Austin |
FY 25 - AUS BR MaintVarious · Bridge Maintenance | $1,589,431 | $659,812 | STRUCTURAL INTEGRITY GROUP LLC | -58.5% | 9 |
| May 1, 2025 | 0910-07-087STP 2025(755)HES | Gregg Tyler |
YOUNG, MOBBERLY-MLK JR BLVD, HSIP 2025YOUNG · Safety Improvement Projects | $834,529 | $620,186 | C & W SOUTHERN LLC | -25.7% | 13 |
| May 1, 2025 | 0508-04-189STP 2025(731)HES | Jefferson Beaumont |
2023 HSIP CURVE(SH 73) FLASHING CHEVRONSSH 73 · Safety Improvement Projects | $1,463,415 | $618,800 | TWELVE STARS CONSTRUCTION COMPANY LLC | -57.7% | 8 |
| May 1, 2025 | 0101-03-127STP 2025(774)HES | San Patricio Corpus Christi |
San Patricio US 181 cable barrierUS 181 · Safety Improvement Projects | $718,945 | $584,654 | MASSANA CONSTRUCTION INC. | -18.7% | 8 |
| May 1, 2025 | 0887-01-041C 887-1-41 | Midland Odessa |
FM307_AT_COUNTY_ROAD1120_SAFETYFM 307 · Safety Improvement Projects | $640,974 | $520,378 | WILLIS ELECTRIC CO., LP | -18.8% | 3 |
| May 1, 2025 | 2887-01-013STP 2025(729)HRR | Liberty Beaumont |
BMT_FM2830_1(2021 HSIP)INCREASE SUPERELEFM 2830 · Safety Improvement Projects | $573,354 | $484,908 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | -15.4% | 4 |
| May 1, 2025 | 0921-06-386F 2025(703) | Cameron Pharr |
Port Way Finding Guide SignsVarious · Traffic Control Devices | $109,401 | $84,320 | HIGHWAY BARRICADES AND SERVICES, LLC | -22.9% | 1 |
| Apr 30, 2025 | 6483-50-001RMC - A00215116 | Sabine Lufkin |
2025-04 Sabine On-Call Traffic ControlUS0096 · Routine Maintenance Project - Sealed | $944,500 | $934,500 | PROFESSIONAL TRAFFIC CONTROL LLC | -1.1% | 2 |
| Apr 30, 2025 | 6483-40-001RMC - A00215090 | Sabine Lufkin |
2025-04 Sabine Tree And Brush RemovalSH0021 · Routine Maintenance Project - Sealed | $383,753 | $300,058 | D and R Land Services LLC | -21.8% | 6 |
| Apr 30, 2025 | 6483-43-001RMC - A00215097 | San Jacinto Lufkin |
2025-4 San Jacinto MowingUS0059 · Routine Maintenance Project | $288,531 | $224,776 | ROY LEE WALKER | -22.1% | 2 |
| Apr 29, 2025 | 6484-07-001SUP - A00215365 | Winkler Odessa |
6484-07-001 Janitorial & GroundsSH0302 · State Use Project | $22,490 | — | 0 | ||
| Apr 29, 2025 | 6484-33-001SUP - A00215433 | Nueces Corpus Christi |
6484-33-001 Service Station AttendantSH0358 · State Use Project | $45,600 | — | 0 | ||
| Apr 29, 2025 | 6484-39-001SUP - A00215444 | Kaufman Dallas |
Kaufman Litter 06 0425FM2728 · State Use Project | $221,890 | — | 0 | ||
| Apr 29, 2025 | 6484-79-001SUP - A00215603 | Nueces Corpus Christi |
6484-79-001 LITTER REMOVALIH0037 · State Use Project | $230,451 | — | 0 | ||
| Apr 28, 2025 | 6479-67-001RMC - A00213892 | Wise Fort Worth |
FY25 Mowing Jack and WiseUS0380 · Routine Maintenance Project - Sealed | $951,203 | $732,707 | CROSS PLUS CONSTRUCTION, LLC | -23.0% | 6 |
| Apr 28, 2025 | 6458-41-001BPM - A00205469 | Wharton Yoakum |
Steel Piling RepairBU0059R · Bridge Preventative Maintenance - Sealed | $844,964 | $602,967 | CRACKSEAL OF TEXAS, LLC | -28.6% | 9 |
| Apr 28, 2025 | 6484-65-001SUP - A00215509 | Howard Abilene |
Howard, Mitchell, and Scurry LitterIH0020 · State Use Project | $210,690 | — | 0 | ||
| Apr 28, 2025 | 6483-96-001SUP - A00215336 | Nacogdoches Lufkin |
2025-04 Nacogdoches JanitorialFM0343 · State Use Project | $9,773 | — | 0 | ||
| Apr 28, 2025 | 6483-97-001SUP - A00215337 | San Jacinto Lufkin |
2025-04 San Jacinto JanitorialSH0150 · State Use Project | $19,069 | — | 0 | ||
| Apr 28, 2025 | 6483-98-001SUP - A00215338 | Shelby Lufkin |
2025-04 Shelby JanitorialSH0007 · State Use Project | $18,299 | — | 0 | ||
| Apr 28, 2025 | 6484-44-001SUP - A00215462 | Titus Atlanta |
Janitorial - Mt. PleasantUS0271 · State Use Project | $14,000 | — | 0 | ||
| Apr 24, 2025 | 6483-33-001MMC - A00215081 | Lampasas Brownwood |
LRA LAMPASAS COUNTYUS0281 · Material Maintenance Project | $239,132 | $251,584 | VULCAN CONSTRUCTION MATERIALS, LLC | +5.2% | 2 |
| Apr 24, 2025 | 6483-34-001MMC - A00215082 | Mills Brownwood |
LRA (MATERIALS ONLY) MILLS COUS0084 · Material Maintenance Project | $232,795 | $251,536 | MARTIN MARIETTA MATERIALS, INC. | +8.1% | 2 |
| Apr 24, 2025 | 6483-39-001MMC - A00215088 | San Saba Brownwood |
LRA (MATERIALS ONLY) SAN SABA COUS0190 · Material Maintenance Project | $238,305 | $248,572 | VULCAN CONSTRUCTION MATERIALS, LLC | +4.3% | 1 |
| Apr 24, 2025 | 6395-46-001RMC - A00183992 | Victoria Yoakum |
On Call Sweeping Victoria FY 25US0059 · Routine Maintenance Project | $164,717 | $155,123 | BLUE CHIP SERVICES, LLC | -5.8% | 3 |
| Apr 24, 2025 | 6483-85-001SUP - A00215300 | Denton Dallas |
Denton Janitorial & Grounds FY25IH0035E · State Use Project | $74,275 | — | 0 | ||
| Apr 23, 2025 | 6482-28-001MMC - A00214701 | Hartley Amarillo |
FY 25-26 Dumas Area HMACUS0087 · Material Maintenance Project | $658,500 | $625,000 | RK HALL, LLC | -5.1% | 3 |
| Apr 23, 2025 | 6467-37-001RMC - A00209680 | Gray Amarillo |
Guardrail Pampa AE FY 24IH0040 · Routine Maintenance Project - Sealed | $551,955 | $354,520 | ROSS SA ENTERPRISE LLC | -35.8% | 2 |
| Apr 23, 2025 | 6482-00-001RMC - A00214631 | Potter Amarillo |
RPM FY 2025IH0040 · Routine Maintenance Project - Sealed | $506,948 | $329,294 | TRP INFRASTRUCTURE SERVICES, LLC | -35.0% | 4 |
| Apr 23, 2025 | 6479-02-001RMC - A00213719 | Nacogdoches Lufkin |
2025-03 Nacogdoches MowingUS0059 · Routine Maintenance Project | $370,539 | $281,451 | DOUBLE S TRACTOR SERVICES, LLC | -24.0% | 5 |
| Apr 23, 2025 | 6480-69-001RMC - A00214252 | Angelina Lufkin |
Install Specialty Pavement MarkingsUS0059 · Routine Maintenance Project - Sealed | $201,350 | $195,529 | THE CONFIDENCE GROUP, INC | -2.9% | 4 |
| Apr 23, 2025 | 6482-27-001MMC - A00214700 | Randall Amarillo |
FY 25 AMA Hydrated Lime BaggedIH0027 · Material Maintenance Project | $45,000 | $44,460 | TEXAS LIME COMPANY | -1.2% | 2 |
| Apr 23, 2025 | 6483-89-001SUP - A00215304 | Lee Austin |
Giddings Maintenance Litter FY25US0290 · State Use Project | $153,944 | — | 0 | ||
| Apr 22, 2025 | 6476-06-001RMC - A00212741 | Harris Houston |
6476-06-001 Base Rep,Seal Coat,Pav MrkPR1836A · Routine Maintenance Project - Sealed | $529,303 | $487,049 | ELITE KINGS CONSTRUCTION, LLC | -8.0% | 3 |
| Apr 22, 2025 | 6481-08-001RMC - A00214335 | Webb Laredo |
Traffic Signal Maintenance DistrictwideIH0035 · Routine Maintenance Project - Sealed | $408,646 | $435,261 | TRIPLE H FIELD SERVICES, LLC | +6.5% | 1 |
| Apr 22, 2025 | 6484-59-001SUP - A00215502 | Oldham Amarillo |
Picnic Area Oldham and Potter FY 25IH0040 · State Use Project | $112,094 | — | 0 | ||
| Apr 22, 2025 | 6484-60-001SUP - A00215503 | Oldham Amarillo |
Spot Litter Pickup Oldham FY 25IH0040 · State Use Project | $14,700 | — | 0 | ||
| Apr 22, 2025 | 6484-58-001SUP - A00215501 | Potter Amarillo |
Litter Pickup LIDS FY 25IH0040 · State Use Project | $263,078 | — | 0 | ||
| Apr 21, 2025 | 6477-13-001MMC - A00212935 | Victoria Yoakum |
Hot Mix-Victoria Co (Materials Only)US0059 · Material Maintenance Project | $990,000 | $1,018,490 | COLORADO MATERIALS, LTD. | +2.9% | 3 |
| Apr 21, 2025 | 6477-12-001MMC - A00212934 | Calhoun Yoakum |
Hot Mix-Calhoun Co. (Materials Only)SH0035 · Material Maintenance Project | $990,000 | $1,009,800 | QUALITY HOT MIX, INC. | +2.0% | 2 |
| Apr 21, 2025 | 6477-11-001MMC - A00212933 | Jackson Yoakum |
Hot Mix-Jackson Co (Materials Only)SH0111 · Material Maintenance Project | $980,000 | $970,000 | QUALITY HOT MIX, INC. | -1.0% | 2 |
| Apr 21, 2025 | 6477-14-001MMC - A00212936 | Calhoun Yoakum |
Hot Mix CL-Calhoun Co (Materials Only)SH0035 · Material Maintenance Project | $612,000 | $594,000 | QUALITY HOT MIX, INC. | -2.9% | 3 |
| Apr 21, 2025 | 6477-15-001MMC - A00212938 | Jackson Yoakum |
Hot Mix CL-Jackson Co (Materials Only)SH0111 · Material Maintenance Project | $500,000 | $480,000 | QUALITY HOT MIX, INC. | -4.0% | 3 |
| Apr 21, 2025 | 6477-16-001MMC - A00212943 | Victoria Yoakum |
Hot Mix CL-Victoria Co. (Materials Only)US0059 · Material Maintenance Project | $500,000 | $467,500 | BRAUNTEX MATERIALS, INC. | -6.5% | 3 |
| Apr 21, 2025 | 6478-21-001RMC - A00213213 | Hill Waco |
Tree Trimming - Hill AOSH0031 · Routine Maintenance Project | $520,885 | $390,597 | MARLANE CONSTRUCTION, LLC | -25.0% | 8 |
| Apr 21, 2025 | 6477-07-001MMC - A00212927 | Victoria Yoakum |
LRA-VAO (Materials Only)US0059 · Material Maintenance Project | $377,000 | $369,290 | MARTIN MARIETTA MATERIALS, INC. | -2.0% | 2 |
| Apr 21, 2025 | 6477-01-001MMC - A00212918 | Victoria Yoakum |
Aggregate-VAO (Materials Only)US0059 · Material Maintenance Project | $345,600 | $340,800 | BRAUNTEX MATERIALS, INC. | -1.4% | 5 |
| Apr 21, 2025 | 6477-08-001MMC - A00212929 | Victoria Yoakum |
Asph/Oils/Emul-VAO (Materials Only)US0059 · Material Maintenance Project | $322,500 | $287,925 | ERGON ASPHALT & EMULSIONS, INC. | -10.7% | 3 |
| Apr 21, 2025 | 6478-77-001RMC - A00213582 | Coryell Waco |
Tree Trimming in Coryell CountyFM0932 · Routine Maintenance Project | $286,450 | $223,244 | REAR CONTRACTORS LLC | -22.1% | 6 |
| Apr 21, 2025 | 6477-03-001MMC - A00212922 | Victoria Yoakum |
Flexbase-VAO (Materials Only)US0059 · Material Maintenance Project | $240,000 | $223,125 | QUALITY HOT MIX, INC. | -7.0% | 7 |
| Apr 21, 2025 | 6473-35-001RMC - A00212201 | McLennan Waco |
Waco State SchoolSH0006 · Routine Maintenance Project | $145,879 | $177,815 | TEXAS MATERIALS GROUP, INC. | +21.9% | 2 |
| Apr 21, 2025 | 6478-20-001RMC - A00213212 | McLennan Waco |
Tree Trimming in McLennanUS0084 · Routine Maintenance Project | $208,112 | $148,868 | REAR CONTRACTORS LLC | -28.5% | 8 |
| Apr 21, 2025 | 6478-76-001RMC - A00213580 | Bell Waco |
TREE TRIMMING in BELL COUNTYFM1670 · Routine Maintenance Project | $179,450 | $122,102 | REAR CONTRACTORS LLC | -32.0% | 6 |
| Apr 21, 2025 | 6477-04-001MMC - A00212923 | Victoria Yoakum |
Rock/Riprap-VAO (Materials Only)US0059 · Material Maintenance Project | $120,750 | $114,492 | SOUTHERN SOURCING SOLUTIONS, LLC | -5.2% | 4 |
| Apr 21, 2025 | 6477-05-001MMC - A00212925 | Victoria Yoakum |
Hydraulic Cement-VAO (Materials Only)US0059 · Material Maintenance Project | $64,688 | $62,294 | AKA-MATERIALS | -3.7% | 3 |
| Apr 21, 2025 | 6477-06-001MMC - A00212926 | Victoria Yoakum |
Lime-VAO (Materials Only)US0059 · Material Maintenance Project | $18,113 | $18,638 | TEXAS LIME COMPANY | +2.9% | 1 |
| Apr 17, 2025 | 6483-09-001MMC - A00214955 | Red River Paris |
Hot Mix - Red River Co.SH0037 · Material Maintenance Project - Sealed | $890,000 | $938,000 | RK HALL, LLC | +5.4% | 1 |
| Apr 17, 2025 | 6482-94-001MMC - A00214905 | Franklin Paris |
Hot Mix - Franklin Co.US0067 · Material Maintenance Project - Sealed | $772,000 | $792,000 | RK HALL, LLC | +2.6% | 1 |
| Apr 17, 2025 | 6478-48-001MMC - A00213370 | Fannin Paris |
D-GR Hot Mix - Fannin Co.US0069 · Material Maintenance Project - Sealed | $762,000 | $747,200 | RK HALL, LLC | -1.9% | 3 |
| Apr 17, 2025 | 6483-18-001MMC - A00215000 | Hopkins Paris |
Hot Mix - Hopkins Co.IH0030 · Material Maintenance Project - Sealed | $744,000 | $742,500 | RK HALL, LLC | -0.2% | 1 |
| Apr 17, 2025 | 6483-11-001MMC - A00214976 | Lamar Paris |
Hot Mix - Lamar Co.US0082 · Material Maintenance Project - Sealed | $745,000 | $720,500 | RK HALL, LLC | -3.3% | 1 |
| Apr 17, 2025 | 6483-12-001MMC - A00214987 | Delta Paris |
Hot Mix - Delta Co.SH0154 · Material Maintenance Project - Sealed | $745,000 | $720,500 | RK HALL, LLC | -3.3% | 1 |
| Apr 17, 2025 | 6483-19-001MMC - A00215003 | Hunt Paris |
Hot Mix - Hunt Co.IH0030 · Material Maintenance Project - Sealed | $680,000 | $649,750 | RK HALL, LLC | -4.4% | 3 |
| Apr 17, 2025 | 6482-93-001MMC - A00214904 | Rains Paris |
Hot Mix - Rains Co.US0069 · Material Maintenance Project - Sealed | $649,500 | $637,000 | RK HALL, LLC | -1.9% | 3 |
| Apr 17, 2025 | 6482-09-001RMC - A00214647 | Mills Brownwood |
TREE TRIMMING AND BRUSH REMOVAL 2025US0084 · Routine Maintenance Project | $980,596 | $581,070 | AUSTIN BARRICADE COMPANY, L.L.C. | -40.7% | 9 |
| Apr 17, 2025 | 6481-44-001RMC - A00214400 | Hockley Lubbock |
FY25 Hockley Lamb ROW MowingUS0084 · Routine Maintenance Project - Sealed | $679,008 | $567,035 | GORMAN OUTDOOR, INC. | -16.5% | 5 |
| Apr 17, 2025 | 6481-46-001RMC - A00214402 | Bailey Lubbock |
FY25 Bailey Cochran ROW MowingUS0084 · Routine Maintenance Project - Sealed | $661,664 | $562,959 | GROUNDCOVER HOLDINGS, LLC | -14.9% | 5 |
| Apr 17, 2025 | 6481-42-001RMC - A00214398 | Hale Lubbock |
FY25 Hale ROW MowingIH0027 · Routine Maintenance Project - Sealed | $552,528 | $467,958 | GROUNDCOVER HOLDINGS, LLC | -15.3% | 4 |
| Apr 17, 2025 | 6477-92-001MMC - A00213148 | Hopkins Paris |
Cut-Back Asphalt - Hopkins-DWSH0011 · Material Maintenance Project - Sealed | $479,250 | $428,050 | MARTIN RESOURCE MANAGEMENT CORPORATION | -10.7% | 3 |
| Apr 17, 2025 | 6478-88-001RMC - A00213668 | Lamar Paris |
On Call TY II - North FY25US0082 · Routine Maintenance Project - Sealed | $592,420 | $295,000 | STRIPING TECHNOLOGY, L.P. | -50.2% | 4 |
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.