168Let jobs
$527,229,584Total low bids
$634,936,827Total estimates
-17.0%Low bids vs estimates
Nov 2025 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Nov 6, 2025 | 0043-14-028F 2026(086) | Wichita Wichita Falls |
SL 11; 0.3 mi N BU 287J to BU 287 (FR)SL 11 · Seal Coat | $11,647,167 | $9,871,512 | RONALD R. WAGNER & CO., LP | -15.2% | 4 |
| Nov 6, 2025 | 0059-01-063C 59-1-63 | Nacogdoches Lufkin |
SH 7_FM 2713 to San Augustine C/L - SCSH 7 · Seal Coat | $10,512,227 | $9,316,843 | CLARK CONSTRUCTION OF TEXAS, INC. | -11.4% | 4 |
| Nov 6, 2025 | 1746-01-031STP 2026(148)HRR | Collin Dallas |
FM 1827 from FM75 to FM545FM 1827 · Safety Improvement Projects | $12,202,345 | $8,652,246 | D. L. LENNON INCORPORATED - CONTRACTOR | -29.1% | 5 |
| Nov 6, 2025 | 1014-04-015F 2026(723) | Collin Dallas |
FM 1777 FROM FM 6 TO CR 677FM 1777 · Rehabilitation of Existing Road | $9,890,108 | $6,601,558 | D. L. LENNON INCORPORATED - CONTRACTOR | -33.3% | 5 |
| Nov 6, 2025 | 0042-12-096F 2026(073) | Childress Childress |
US 287 Hall C/L to 2102' W of FM 164US 287 · Overlay | $6,986,326 | $5,183,756 | RK HALL, LLC | -25.8% | 8 |
| Nov 6, 2025 | 0028-04-083STP 2026(107)MM | Liberty Beaumont |
US 90(TRINITY RVR BR-E /SH 146)MILL & OVUS 90 · Overlay | $6,408,891 | $4,088,177 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | -36.2% | 4 |
| Nov 6, 2025 | 2072-01-015F 2026(046) | Gregg Tyler |
FM2204,US259-FM2011,RRRFM 2204 · Restoration | $3,954,370 | $3,494,062 | MADDEN CONTRACTING COMPANY, LLC. | -11.6% | 5 |
| Nov 6, 2025 | 0913-27-092BR 2023(891) | Victoria Yoakum |
CS BRIDGE REPLACEMENT 2606CLARK SCHOOL · Bridge Replacement | $3,669,522 | $2,877,575 | PRESIDIO CONTRACTING, LLC | -21.6% | 9 |
| Nov 6, 2025 | 6491-72-001RMC - A00217935 | Brazos Bryan |
FY26 - District Thermo - 11SH0006 · Routine Maintenance Project | $4,719,225 | $2,845,805 | STRIPE LINES, INC. | -39.7% | 7 |
| Nov 6, 2025 | 6488-08-001RMC - A00217009 | Bosque Waco |
DISTRICT WIDE TRAFFIC CONTROL SERVICESSH0006 · Routine Maintenance Project - Sealed | $2,943,610 | $2,726,105 | AWP SAFETY | -7.4% | 2 |
| Nov 6, 2025 | 0048-01-070STP 2026(097)HES | Dallas Dallas |
SH 342 at SL 12 LedbetterSH 342 · Safety Improvement Projects | $4,118,397 | $2,607,221 | ELECNOR BELCO ELECTRIC, INC. | -36.7% | 8 |
| Nov 6, 2025 | 0027-13-260C 27-13-260 | Harris Houston |
IH 69, Chimney Rock to NewcastleIH 69 · Landscape & Scenic Enhancement | $2,502,398 | $2,411,103 | GREEN SAGE SERVICES LLC | -3.6% | 5 |
| Nov 6, 2025 | 6487-83-001RMC - A00216803 | Harris Houston |
SH 288 Landscaping ProjectSH0288 · Routine Maintenance Project - Sealed | $2,945,146 | $2,238,142 | APEX LANDSCAPE & IRRIGATION, LLC | -24.0% | 4 |
| Nov 6, 2025 | 0909-36-201STP 2025(763)TAPS | Bell Waco |
Little River-Academy School ConnectivityFM 436 · Pedestrian, Sidewalks & Curb Ramps | $2,647,295 | $2,132,111 | GARRET SHIELDS INFRASTRUCTURE | -19.5% | 7 |
| Nov 6, 2025 | 6483-47-001MMC - A00215111 | Bastrop Austin |
FY26 Districtwide Seal Coat AggregateFM0535 · Material Maintenance Project | $2,164,250 | $2,088,750 | TOUCHSTONE RESOURCES, LLC | -3.5% | 2 |
| Nov 6, 2025 | 0117-05-063STP 2026(122)HES | Madison Bryan |
SH 21 E of IH 45 - TWLT FY 26SH 21 · Safety Improvement Projects | $2,371,533 | $2,014,433 | BIG CREEK CONSTRUCTION, LTD. | -15.1% | 8 |
| Nov 6, 2025 | 0901-00-065C 901-00-65 | Lamar Paris |
2026 Seal Coat Striping RetraceVarious · Seal Coat | $3,459,833 | $1,997,710 | STRIPE-A-ZONE, LLC | -42.3% | 5 |
| Nov 6, 2025 | 0805-04-038STP 2B25(191)HRR | Hays Austin |
RM 3237 at Lone Man Mountain Rd.RM 3237 · Safety Improvement Projects | $3,180,793 | $1,989,311 | DEAN WORD COMPANY, LTD. | -37.5% | 7 |
| Nov 6, 2025 | 6485-71-001RMC - A00216051 | Ector Odessa |
6485-71-001 Mill & InlayIH0020 · Routine Maintenance Project - Sealed | $1,584,269 | $1,760,245 | RAGLE CONSTRUCTION, INC. | +11.1% | 4 |
| Nov 6, 2025 | 6487-90-001RMC - A00216896 | Wise Fort Worth |
Herbicide Wise, Jack, Parker, Palo PintoUS0081 · Routine Maintenance Project - Sealed | $1,726,951 | $1,748,008 | CENTRAL NORTH CONSTRUCTION, LLC | +1.2% | 7 |
| Nov 6, 2025 | 0908-23-049BR 1902(360) | Fisher Abilene |
CR 122 AT CLEARFORK BRAZOS RIVERCOUNTY ROAD 309 · Bridge Replacement | $2,287,777 | $1,728,544 | COPPELL CONSTRUCTION CO., INC. | -24.4% | 8 |
| Nov 6, 2025 | 6492-22-001MMC - A00218031 | Nolan Maintenance Division |
Nolan County SaltIH0020 · Material Maintenance Project | $1,394,018 | $1,377,945 | NSG LOGISTICS, LLC | -1.2% | 2 |
| Nov 6, 2025 | 6491-34-001RMC - A00217818 | Bexar San Antonio |
FY 26 Districtwide Pavement MarkingsIH0410 · Routine Maintenance Project - Sealed | $1,999,985 | $1,296,560 | TRP INFRASTRUCTURE SERVICES, LLC | -35.2% | 3 |
| Nov 6, 2025 | 6487-89-001RMC - A00216895 | Erath Fort Worth |
FY26 Herbicide Johnson and HESUS0067 · Routine Maintenance Project - Sealed | $1,178,676 | $1,187,971 | CENTRAL NORTH CONSTRUCTION, LLC | +0.8% | 7 |
| Nov 6, 2025 | 0905-00-144C 905-00-144 | Lubbock Lubbock |
FY 26 DMS/ITS UpgradesVarious · Traffic Control Devices | $1,122,553 | $1,007,926 | ELECNOR BELCO ELECTRIC, INC. | -10.2% | 4 |
| Nov 6, 2025 | 0913-29-061BR 2023(575) | Lavaca Yoakum |
CR 213 BRIDGE REHABILITATION 2412COUNTY ROAD 213 · Bridge Widening or Rehabilitation | $830,897 | $747,400 | CEKRA INC. | -10.0% | 4 |
| Nov 6, 2025 | 6487-87-001RMC - A00216856 | Tarrant Fort Worth |
FY26 Foam Injection Tarrant CountyIH0020 · Routine Maintenance Project - Sealed | $999,250 | $727,450 | NORTEX CONCRETE LIFT & STABILIZATION, INC. | -27.2% | 3 |
| Nov 6, 2025 | 0914-00-547F 2026(118) | Travis Austin |
FY 26 - Striping (BAAO Counties)Various · Intersection & Operational Imprv | $790,452 | $546,003 | D. I. J. CONSTRUCTION, INC. | -30.9% | 6 |
| Nov 6, 2025 | 6491-67-001RMC - A00217918 | Kerr Maintenance Division |
Kerrville Salt ShedSH0016 · Routine Maintenance Project - Sealed | $185,000 | $150,000 | TEXWAY WASTEWATER SERVICES, LLC | -18.9% | 4 |
| Nov 6, 2025 | 6488-05-001TMC - A00217003 | Travis Maintenance Division |
TRAFFIC DATA COLLECTION SITE PARTSIH0035 · Material Only Traffic | $31,000 | $28,800 | INTERNATIONAL ROAD DYNAMICS CORPORATION | -7.1% | 1 |
| Nov 5, 2025 | 0231-19-003F 2B25(189) | Coryell Waco |
WF | US 190 | LAMPASAS CL | CLARK RDUS 190 · Widen Freeway | $127,915,646 | $107,409,195 | JAMES CONSTRUCTION GROUP, LLC | -16.0% | 7 |
| Nov 5, 2025 | 0053-01-139F 2026(213) | Lubbock Lubbock |
FY 26 SC-SS 331 -50th St to Olive AveSS 331 · Seal Coat | $24,452,173 | $21,402,157 | LIPHAM ASPHALT AND PAVING COMPANY, LLC | -12.5% | 3 |
| Nov 5, 2025 | 0027-03-075F 2026(062) | Colorado Yoakum |
US 90A SEAL COAT 2611UA 90 · Seal Coat | $24,391,765 | $20,511,237 | CLARK CONSTRUCTION OF TEXAS, INC. | -15.9% | 4 |
| Nov 5, 2025 | 0087-02-053C 87-2-53 | Jim Wells Corpus Christi |
SH359 JimWells FM624toSnPtCL Rhb/Wdn/PssSH 359 · Super-2 Highway | $17,836,723 | $14,897,452 | CK NEWBERRY, LLC | -16.5% | 7 |
| Nov 5, 2025 | 0273-04-045F 2026(117) | Williamson Austin |
US 183 from SH 138 to N of CR 254US 183 · Intersection & Operational Imprv | $19,572,840 | $14,639,581 | JOE BLAND CONSTRUCTION LLC | -25.2% | 8 |
| Nov 5, 2025 | 0009-08-033F 2026(108) | Hunt Paris |
SH 24 FY 2026 Seal Coat - 3SH 24 · Seal Coat | $17,093,993 | $12,986,715 | CLARK CONSTRUCTION OF TEXAS, INC. | -24.0% | 5 |
| Nov 5, 2025 | 0495-01-082F 2026(074) | Kaufman Dallas |
SS 557 from US 80 to IH 20SS 557 · Overlay | $12,242,999 | $8,281,477 | O. TREVINO CONSTRUCTION, LLC | -32.4% | 8 |
| Nov 5, 2025 | 6459-69-001MMC - A00205628 | Hidalgo Pharr |
FY 26 6459-69-001 DISTRICT WIDE LRAIH0069C · Material Maintenance Project - Sealed | $6,845,338 | $6,644,252 | MARTIN MARIETTA MATERIALS, INC. | -2.9% | 2 |
| Nov 5, 2025 | 2352-02-026C 2352-2-26 | Denton Dallas |
FM 2449 from W of Deussen To W of FM 156FM 2449 · Rehabilitation of Existing Road | $5,694,490 | $5,095,390 | EUROVIA ATLANTIC COAST LLC | -10.5% | 6 |
| Nov 5, 2025 | 0334-01-048C 334-1-48 | Williamson Austin |
GTA0-FM 112 from CR438 to FM 486FM 112 · Rehabilitation of Existing Road | $5,142,434 | $4,482,347 | POSILLICO CIVIL, INC. | -12.8% | 10 |
| Nov 5, 2025 | 0259-06-011C 259-6-11 | Johnson Fort Worth |
US 67; BU 67M OVERPASS TO FM 2280US 67 · Freeway Operational Improvements | $5,101,277 | $4,249,844 | ED BELL CONSTRUCTION COMPANY | -16.7% | 5 |
| Nov 5, 2025 | 0257-01-051F 2026(064) | Stephens Brownwood |
US183 FM1032 TO EASTLAND CL FY26 SCUS 183 · Seal Coat | $4,974,278 | $4,216,099 | CLARK CONSTRUCTION OF TEXAS, INC. | -15.2% | 6 |
| Nov 5, 2025 | 0028-06-091F 2023(746) | Jefferson Beaumont |
US 90 EB -(FM 365-4mi EAST)FULL D REPAIRUS 90 · Restoration | $5,468,279 | $3,143,022 | TEXAS MATERIALS GROUP, INC. | -42.5% | 5 |
| Nov 5, 2025 | 0912-73-233C 912-73-233 | Galveston Houston |
Bridge Repairs - VA Loc in Galveston COVarious · Bridge Widening or Rehabilitation | $3,514,974 | $2,839,710 | GARRET SHIELDS INFRASTRUCTURE | -19.2% | 8 |
| Nov 5, 2025 | 0315-06-047BR 2026(048) | Washington Bryan |
SH 105 AT JACKSON CREEK - BRSH 105 · Bridge Replacement | $3,399,652 | $2,813,308 | LARRY YOUNG PAVING, INC. | -17.2% | 12 |
| Nov 5, 2025 | 0913-09-141BR 2025(478) | Wharton Yoakum |
CR 289 BRIDGE REPLACEMENT 2611COUNTY ROAD 289 · Bridge Replacement | $2,852,923 | $2,711,062 | TREVWAY, INC. | -5.0% | 5 |
| Nov 5, 2025 | 0909-36-202STP 2025(762)TAPS | Bell Waco |
Morgan's Point Resort TA PathVarious · Pedestrian, Sidewalks & Curb Ramps | $2,991,266 | $2,475,158 | WELLCRAFT BUILDERS | -17.3% | 11 |
| Nov 5, 2025 | 6489-44-001MMC - A00217420 | Carson Amarillo |
FY 26 Pampa Area Grade 4 & 5 AggregateUS0060 · Material Maintenance Project | $2,303,132 | $2,264,271 | VOLCANIC STONE CO. | -1.7% | 1 |
| Nov 5, 2025 | 6482-86-001MMC - A00214875 | Bowie Atlanta |
District Wide LRA FY 26IH0030 · Material Maintenance Project | $2,167,755 | $2,261,120 | VULCAN CONSTRUCTION MATERIALS, LLC | +4.3% | 2 |
| Nov 5, 2025 | 6490-32-001RMC - A00217601 | Hale Lubbock |
Plainview MBGF UpgradeIH0027 · Routine Maintenance Project - Sealed | $2,339,277 | $2,146,871 | ROSS SA ENTERPRISE LLC | -8.2% | 6 |
| Nov 5, 2025 | 6488-47-001RMC - A00217120 | Dallas Dallas |
Large Guide Sign 2025 (Non-Site)US0080 · Routine Maintenance Project - Sealed | $2,412,741 | $2,084,886 | CROSS PLUS CONSTRUCTION, LLC | -13.6% | 2 |
| Nov 5, 2025 | 0069-01-062C 69-1-62 | Howard Abilene |
US 87 NBL RM 33 TO FM 461US 87 · Overlay | $2,777,235 | $2,026,248 | RK HALL, LLC | -27.0% | 5 |
| Nov 5, 2025 | 0179-15-010STP 2026(049)HES | Calhoun Yoakum |
SH 238 INSTALL LED CHEVRON 2609SH 238 · Safety Improvement Projects | $2,340,990 | $1,886,658 | HIGHWAY BARRICADES AND SERVICES, LLC | -19.4% | 8 |
| Nov 5, 2025 | 0380-18-013BR 2B25(102) | Midland Odessa |
NBI_06-165-0-1718-07-234_BMIPSH 349 · Bridge Maintenance | $2,220,100 | $1,829,294 | RAGLE CONSTRUCTION, INC. | -17.6% | 4 |
| Nov 5, 2025 | 3327-01-006C 3327-1-6 | Donley Childress |
FM 3257 Greenbelt Lake RoadFM 3257 · Culvert & Storm Drainage Work | $2,141,909 | $1,781,819 | EARTH BUILDERS, L.P. | -16.8% | 6 |
| Nov 5, 2025 | 6491-55-001MMC - A00217875 | Hale Lubbock |
FY26 Districtwide AggregateIH0027 · Material Maintenance Project | $1,685,000 | $1,679,125 | TOUCHSTONE RESOURCES, LLC | -0.3% | 2 |
| Nov 5, 2025 | 6491-57-001MMC - A00217882 | Anderson Tyler |
Superpave HMA - Anderson Co.US0079 · Material Maintenance Project | $1,573,500 | $1,572,500 | BIG CREEK CONSTRUCTION, LTD. | -0.1% | 2 |
| Nov 5, 2025 | 6478-22-001BPM - A00213214 | Hill Waco |
Bridge Work DWSH0081 · Bridge Preventative Maintenance - Sealed | $1,552,814 | $1,179,951 | TAYLOR BRIDGE LLC | -24.0% | 7 |
| Nov 5, 2025 | 0613-01-072STP 2026(121)HES | Bexar San Antonio |
SH 16: 0613-01-072: SFTSH 16 · Safety Improvement Projects | $1,730,372 | $1,129,626 | GRATIOT CONSTRUCTION, LTD. | -34.7% | 12 |
| Nov 5, 2025 | 0009-11-270STP 2026(098)HES | Dallas Dallas |
IH 30 WBFR Ent Ramp to SL 12IH 30 · Safety Improvement Projects | $1,144,816 | $1,127,949 | HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC | -1.5% | 9 |
| Nov 5, 2025 | 6487-76-001RMC - A00216769 | Parker Fort Worth |
FY26 Mowing Highway Right of Way, ParkerIH0020 · Routine Maintenance Project - Sealed | $1,183,436 | $1,112,200 | MARLANE CONSTRUCTION, LLC | -6.0% | 9 |
| Nov 5, 2025 | 0039-07-262F 2026(112) | Cameron Pharr |
IH-69E - Traffic SignalIH 69E · Safety Improvement Projects | $1,035,935 | $1,004,820 | 3LW CIVIL LLC | -3.0% | 4 |
| Nov 5, 2025 | 6489-67-001RMC - A00217511 | Wise Fort Worth |
FY26 Metal Beam Guardrail Repair WiseUS0380 · Routine Maintenance Project - Sealed | $1,804,575 | $977,150 | SHORT-LINE CORPORATION | -45.9% | 3 |
| Nov 5, 2025 | 6492-24-001MMC - A00218034 | Hidalgo Pharr |
6492-24-001 EmulsionSH0495 · Material Maintenance Project - Sealed | $963,000 | $956,800 | ERGON ASPHALT & EMULSIONS, INC. | -0.6% | 1 |
| Nov 5, 2025 | 0914-00-546C 914-546 | Travis Austin |
FY 26 - Striping (BTAO counties)Various · Traffic Control Devices | $994,693 | $951,283 | D. I. J. CONSTRUCTION, INC. | -4.4% | 8 |
| Nov 3, 2025 | 6491-89-001SUP - A00217961 | Fort Bend Houston |
Landscape Maintenance - Special Jobs 26SH0006 · State Use Project | $9,540 | — | 0 | ||
| Nov 1, 2025 | 6493-27-001SUP - A00218295 | Tarrant Fort Worth |
Grounds for FTW District ComplexIH0020 · State Use Project | $123,418 | — | 0 | ||
| Nov 1, 2025 | 6492-95-001SUP - A00218243 | Wise Fort Worth |
SUP for Decatur and Jacksboro OfficesUS0380 · State Use Project | $113,136 | — | 0 |
101–168 of 168‹ Prev
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.