188Let jobs
$713,345,462Total low bids
$636,509,215Total estimates
+12.1%Low bids vs estimates
Mar 2022 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Mar 31, 2022 | 6398-60-001MMC - 639860001 | Hale Lubbock |
EMULSIONIH 27 · | $298,750 | $383,500 | ERGON ASPHALT & EMULSIONS, INC. | +28.4% | 2 |
| Mar 31, 2022 | 6398-61-001MMC - 639861001 | Terry Lubbock |
EMULSIONUS 62 · | $249,650 | $307,400 | ERGON ASPHALT & EMULSIONS, INC. | +23.1% | 2 |
| Mar 31, 2022 | 6398-59-001MMC - 639859001 | Lubbock Lubbock |
ASPHALTIH 27 · | $181,450 | $232,600 | MARTIN RESOURCE MANAGEMENT CORPORATION | +28.2% | 2 |
| Mar 31, 2022 | 6398-63-001MMC - 639863001 | Lamb Lubbock |
EMULSIONUS 84 · | $133,200 | $154,400 | ERGON ASPHALT & EMULSIONS, INC. | +15.9% | 2 |
| Mar 31, 2022 | 6398-64-001MMC - 639864001 | Lubbock Lubbock |
EMULSIONUS 82 · | $70,900 | $84,550 | ERGON ASPHALT & EMULSIONS, INC. | +19.3% | 2 |
| Mar 29, 2022 | 6398-20-001MMC - 639820001 | Fayette Yoakum |
EMULSIONIH 10 · | $292,280 | $312,357 | MARTIN RESOURCE MANAGEMENT CORPORATION | +6.9% | 1 |
| Mar 29, 2022 | 6382-81-001BPM - 638281001 | Comal San Antonio |
BRIDGE SCOUR REPAIRFM 306 · | $281,602 | $269,645 | DALRYMPLE GRAVEL AND CONTRACTING COMPANY, INC. | -4.2% | 3 |
| Mar 29, 2022 | 6399-72-001MMC - 639972001 | Sabine Lufkin |
HOT MIXFM 83 · | $241,023 | $264,728 | TEXAS MATERIALS GROUP, INC. | +9.8% | 2 |
| Mar 29, 2022 | 6399-49-001MMC - 639949001 | Sabine Lufkin |
EMULSIONFM 83 · | $221,600 | $249,600 | MARTIN RESOURCE MANAGEMENT CORPORATION | +12.6% | 3 |
| Mar 29, 2022 | 6399-23-001MMC - 639923001 | Kimble San Angelo |
ASPHALTUS 83 · | $239,286 | $231,363 | MARTIN RESOURCE MANAGEMENT CORPORATION | -3.3% | 2 |
| Mar 29, 2022 | 6387-36-001RMC - 638736001 | Kendall San Antonio |
EROSION REPAIRSH 46 · | $114,972 | $162,465 | DALRYMPLE GRAVEL AND CONTRACTING COMPANY, INC. | +41.3% | 4 |
| Mar 29, 2022 | 6399-45-001MMC - 639945001 | Coke San Angelo |
EMULSIONUS 87 · | $114,057 | $123,975 | MARTIN RESOURCE MANAGEMENT CORPORATION | +8.7% | 2 |
| Mar 29, 2022 | 6382-80-001BPM - 638280001 | Bexar San Antonio |
BRIDGE SCOUR REPAIRUS 90 · | $53,143 | $75,095 | DALRYMPLE GRAVEL AND CONTRACTING COMPANY, INC. | +41.3% | 5 |
| Mar 29, 2022 | 6399-46-001MMC - 639946001 | Sabine Lufkin |
EMULSIONFM 83 · | $25,680 | $38,400 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | +49.5% | 3 |
| Mar 24, 2022 | 6396-70-001MMC - 639670001 | Ellis Dallas |
LIMESTONE ROCK AND ASPHALTFM 876 · | $258,000 | $747,459 | VULCAN CONSTRUCTION MATERIALS, LLC | +189.7% | 1 |
| Mar 24, 2022 | 6394-74-001RMC - 639474001 | Collin Dallas |
TRAFFIC CONTROL SERVICESUS 75 · | $218,000 | $379,300 | STATEWIDE SAFETY SYSTEMS | +74.0% | 1 |
| Mar 24, 2022 | 6397-32-001RMC - 639732001 | Denton Dallas |
TRAFFIC CONTROL SERVICESIH 35E · | $271,585 | $353,850 | STATEWIDE SAFETY SYSTEMS | +30.3% | 1 |
| Mar 24, 2022 | 6394-47-001RMC - 639447001 | Ellis Dallas |
CRASH CUSHION ATTENUATOR REPAIRIH 45 · | $292,800 | $347,350 | FIREMAN EXCAVATING, INC. | +18.6% | 2 |
| Mar 24, 2022 | 6388-08-001RMC - 638808001 | Ellis Dallas |
VEGETATION MANAGEMENTIH 35E · | $268,730 | $293,930 | JASCO | +9.4% | 2 |
| Mar 24, 2022 | 6393-50-001RMC - 639350001 | Dallas Dallas |
STORM SEWER AND DRAIN INLET CLEANINGUS 67 · | $231,301 | $192,925 | SHALOM SERVICES CORPORATION | -16.6% | 3 |
| Mar 24, 2022 | 6394-36-001BPM - 639436001 | Collin Dallas |
BRIDGE PREVENTATIVE MAINTENANCEFM 981 · | $176,744 | $164,135 | SHALOM SERVICES CORPORATION | -7.1% | 3 |
| Mar 24, 2022 | 6381-49-001RMC - 638149001 | Denton Dallas |
RAISED PAVEMENT MARKINGSFM 2499 · | $142,429 | $115,532 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -18.9% | 3 |
| Mar 24, 2022 | 6396-29-001RMC - 639629001 | Denton Dallas |
CULVERT REPAIRFM 1173 · | $75,571 | $87,272 | THOMAS 11 DEVELOPMENT LLC | +15.5% | 3 |
| Mar 24, 2022 | 6396-61-001MMC - 639661001 | Ellis Dallas |
EMULSIONFM 876 · | $42,400 | $60,220 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | +42.0% | 1 |
| Mar 23, 2022 | 6396-60-001MMC - 639660001 | Bowie Atlanta |
EMULSIONUS 59 · | $236,000 | $301,850 | ERGON ASPHALT & EMULSIONS, INC. | +27.9% | 1 |
| Mar 23, 2022 | 6396-62-001MMC - 639662001 | Titus Atlanta |
HOT-MIX COLD-LAIDUS 271 · | $76,250 | $84,250 | RK HALL, LLC | +10.5% | 1 |
| Mar 22, 2022 | 6398-13-001MMC - 639813001 | Aransas Corpus Christi |
FLEXIBLE BASESH 35 · | $289,000 | $351,560 | VULCAN CONSTRUCTION MATERIALS, LLC | +21.6% | 5 |
| Mar 22, 2022 | 6394-11-001MMC - 639411001 | Kleberg Corpus Christi |
FLEXIBLE BASEUS 77 · | $297,500 | $334,220 | VULCAN CONSTRUCTION MATERIALS, LLC | +12.3% | 4 |
| Mar 22, 2022 | 6397-54-001MMC - 639754001 | Shelby Lufkin |
AGGREGATEFM 414 · | $257,292 | $320,850 | TOUCHSTONE RESOURCES, LLC | +24.7% | 1 |
| Mar 22, 2022 | 6396-03-001BPM - 639603001 | San Patricio Corpus Christi |
BRIDGE SUBSTRUCTURE REPAIRUS 77 · | $229,375 | $318,954 | CRACKSEAL OF TEXAS, LLC | +39.1% | 1 |
| Mar 22, 2022 | 6399-16-001MMC - 639916001 | San Jacinto Lufkin |
EMULSIONSH 105 · | $221,744 | $264,333 | MARTIN RESOURCE MANAGEMENT CORPORATION | +19.2% | 2 |
| Mar 22, 2022 | 6398-15-001MMC - 639815001 | San Patricio Corpus Christi |
FLEXIBLE BASEUS 181 · | $289,000 | $255,000 | DIGG COMMERCIAL, LLC | -11.8% | 5 |
| Mar 22, 2022 | 6396-00-001BPM - 639600001 | Jim Wells Corpus Christi |
BRIDGE SUBSTRUCTURE REPAIRSH 44 · | $197,150 | $185,873 | SCR CIVIL CONSTRUCTION, LLC | -5.7% | 3 |
| Mar 22, 2022 | 6398-62-001MMC - 639862001 | Nueces Corpus Christi |
EMULSIONUS 77 · | $77,250 | $97,270 | ERGON ASPHALT & EMULSIONS, INC. | +25.9% | 1 |
| Mar 17, 2022 | 6392-28-001MMC - 639228001 | Bexar San Antonio |
AGGREGATEIH 410 · | $262,600 | $334,857 | VULCAN CONSTRUCTION MATERIALS, LLC | +27.5% | 4 |
| Mar 17, 2022 | 6398-40-001MMC - 639840001 | Medina San Antonio |
AGGREGATEIH 35 · | $255,000 | $309,183 | VULCAN CONSTRUCTION MATERIALS, LLC | +21.2% | 4 |
| Mar 17, 2022 | 6396-69-001MMC - 639669001 | Hunt Paris |
ASPHALT, OIL & EMULSIONIH 30 · | $257,800 | $307,550 | ERGON ASPHALT & EMULSIONS, INC. | +19.3% | 1 |
| Mar 17, 2022 | 6396-72-001MMC - 639672001 | Rains Paris |
ASPHALT, OIL & EMULSIONUS 69 · | $257,800 | $307,550 | ERGON ASPHALT & EMULSIONS, INC. | +19.3% | 1 |
| Mar 17, 2022 | 6392-24-001MMC - 639224001 | Bexar San Antonio |
LIMESTONE ROCK AND ASPHALTIH 37 · | $254,000 | $304,878 | VULCAN CONSTRUCTION MATERIALS, LLC | +20.0% | 2 |
| Mar 17, 2022 | 6398-41-001MMC - 639841001 | Atascosa San Antonio |
LIMESTONE ROCK AND ASPHALTIH 35 · | $250,313 | $294,873 | VULCAN CONSTRUCTION MATERIALS, LLC | +17.8% | 2 |
| Mar 17, 2022 | 6398-42-001MMC - 639842001 | Comal San Antonio |
DENSE GRADED HOT MIXIH 35 · | $247,250 | $279,025 | TEXAS MATERIALS GROUP, INC. | +12.9% | 5 |
| Mar 17, 2022 | 6398-39-001MMC - 639839001 | Bexar San Antonio |
HOT-MIX COLD-LAIDIH 10 · | $268,850 | $272,400 | BRAUNTEX MATERIALS, INC. | +1.3% | 5 |
| Mar 17, 2022 | 6385-38-001RMC - 638538001 | Hunt Paris |
FURNISH & INSTALL DYNAMIC MESSAGE SIGNSIH 30 · | $223,660 | $252,368 | MICA CORPORATION | +12.8% | 2 |
| Mar 17, 2022 | 6392-23-001MMC - 639223001 | Uvalde San Antonio |
LIMESTONE ROCK AND ASPHALTUS 90 · | $252,000 | $229,970 | VULCAN CONSTRUCTION MATERIALS, LLC | -8.7% | 2 |
| Mar 17, 2022 | 6395-95-001BPM - 639595001 | Hopkins Paris |
BRIDGE BEAM REPAIRIH 30 · | $263,300 | $228,100 | GIBSON & ASSOCIATES, INC. | -13.4% | 7 |
| Mar 17, 2022 | 6397-23-001BPM - 639723001 | Lamar Paris |
BRIDGE BEAM REPAIRUS 82 · | $137,400 | $127,669 | PENHALL COMPANY | -7.1% | 8 |
| Mar 16, 2022 | 6394-57-001MMC - 639457001 | Brown Brownwood |
HOT-MIX (MATERIALS ONLY)US 377 · | $294,500 | $410,000 | TOUCHSTONE RESOURCES, LLC | +39.2% | 1 |
| Mar 16, 2022 | 6396-80-001MMC - 639680001 | Duval Laredo |
EMULSIONUS 59 · | $297,000 | $402,100 | ERGON ASPHALT & EMULSIONS, INC. | +35.4% | 1 |
| Mar 16, 2022 | 6398-95-001MMC - 639895001 | Comanche Brownwood |
LIMESTONE ROCK AND ASPHALT (MATERIALS ONLY)SH 16 · | $288,898 | $358,249 | VULCAN CONSTRUCTION MATERIALS, LLC | +24.0% | 2 |
| Mar 16, 2022 | 6397-44-001MMC - 639744001 | Comal San Antonio |
LIMESTONE ROCK AND ASPHALTIH 35 · | $276,500 | $353,925 | VULCAN CONSTRUCTION MATERIALS, LLC | +28.0% | 2 |
| Mar 16, 2022 | 6397-94-001RMC - 639794001 | Brown Brownwood |
MOWING HIGHWAY RIGHT OF WAY (CALL-OUT)US 183 · | $290,560 | $345,766 | R&M INCORPORATED | +19.0% | 3 |
| Mar 16, 2022 | 6391-73-001MMC - 639173001 | Comal San Antonio |
AGGREGATEIH 35 · | $250,500 | $338,055 | COLORADO MATERIALS, LTD. | +35.0% | 4 |
| Mar 16, 2022 | 6397-45-001MMC - 639745001 | Bexar San Antonio |
DENSE GRADED HOT MIXIH 10 · | $266,000 | $332,800 | VULCAN CONSTRUCTION MATERIALS, LLC | +25.1% | 3 |
| Mar 16, 2022 | 6397-46-001MMC - 639746001 | Bexar San Antonio |
DENSE GRADED HOT MIXIH 10 · | $266,000 | $332,800 | VULCAN CONSTRUCTION MATERIALS, LLC | +25.1% | 3 |
| Mar 16, 2022 | 6392-25-001MMC - 639225001 | Guadalupe San Antonio |
LIMESTONE ROCK AND ASPHALTIH 10 · | $271,400 | $330,330 | VULCAN CONSTRUCTION MATERIALS, LLC | +21.7% | 2 |
| Mar 16, 2022 | 6398-94-001MMC - 639894001 | Brown Brownwood |
LIMESTONE ROCK AND ASPHALTUS 183 · | $293,077 | $329,098 | VULCAN CONSTRUCTION MATERIALS, LLC | +12.3% | 2 |
| Mar 16, 2022 | 6391-74-001MMC - 639174001 | Kerr San Antonio |
AGGREGATEIH 10 · | $274,800 | $315,300 | VULCAN CONSTRUCTION MATERIALS, LLC | +14.7% | 2 |
| Mar 16, 2022 | 6398-96-001MMC - 639896001 | Lampasas Brownwood |
LIMESTONE ROCK AND ASPHALT (MATERIALS ONLY)US 281 · | $273,744 | $302,558 | VULCAN CONSTRUCTION MATERIALS, LLC | +10.5% | 2 |
| Mar 16, 2022 | 6398-01-001MMC - 639801001 | Duval Laredo |
LIMESTONE ROCK AND ASPHALTSH 359 · | $196,000 | $300,216 | VULCAN CONSTRUCTION MATERIALS, LLC | +53.2% | 2 |
| Mar 16, 2022 | 6397-95-001RMC - 639795001 | McCulloch Brownwood |
MOWING HIGHWAY RIGHT OF WAY (CALL-OUT)US 377 · | $248,896 | $276,041 | ABESCAPE GROUP LLC | +10.9% | 3 |
| Mar 16, 2022 | 6391-84-001MMC - 639184001 | Bexar San Antonio |
FLEXIBLE BASEIH 35 · | $216,000 | $223,200 | DALRYMPLE GRAVEL AND CONTRACTING COMPANY, INC. | +3.3% | 4 |
| Mar 16, 2022 | 6391-82-001MMC - 639182001 | Bexar San Antonio |
FLOWABLE FILLIH 35 · | $199,200 | $171,000 | TOUCHSTONE RESOURCES, LLC | -14.2% | 1 |
| Mar 16, 2022 | 6394-55-001RMC - 639455001 | Brown Brownwood |
MILLING (CALL-OUT) (KNOWN & UNKNOWN LOCATIONS)US 377 · | $296,523 | $148,040 | TEX OP CONSTRUCTION, LP | -50.1% | 2 |
| Mar 16, 2022 | 6398-14-001MMC - 639814001 | Duval Laredo |
AGGREGATESH 359 · | $52,700 | $66,487 | VULCAN CONSTRUCTION MATERIALS, LLC | +26.2% | 3 |
| Mar 15, 2022 | 6396-94-001MMC - 639694001 | Hamilton Waco |
HOT MIXUS 281 · | $293,400 | $392,733 | TEXAS MATERIALS GROUP, INC. | +33.9% | 1 |
| Mar 15, 2022 | 6398-72-001MMC - 639872001 | Reagan San Angelo |
EMULSIONUS 67 · | $280,611 | $334,305 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | +19.1% | 2 |
| Mar 15, 2022 | 6398-54-001MMC - 639854001 | Bell Waco |
HOT MIXUS 190 · | $296,300 | $328,375 | LONE STAR PAVING COMPANY | +10.8% | 3 |
| Mar 15, 2022 | 6396-93-001MMC - 639693001 | McLennan Waco |
HOT MIXUS 84 · | $283,000 | $318,250 | BIG CREEK CONSTRUCTION, LTD. | +12.5% | 3 |
| Mar 15, 2022 | 6394-56-001MMC - 639456001 | Walker Bryan |
EMULSIONIH 45 · | $182,000 | $211,400 | CLEVELAND ASPHALT PRODUCTS, INC. | +16.2% | 4 |
| Mar 15, 2022 | 6395-21-001MMC - 639521001 | Washington Bryan |
AGGREGATESH 36 · | $201,000 | $210,750 | ARCOSA LWS, LLC | +4.9% | 1 |
| Mar 15, 2022 | 6394-53-001MMC - 639453001 | Washington Bryan |
EMULSIONSH 36 · | $137,500 | $172,200 | MARTIN RESOURCE MANAGEMENT CORPORATION | +25.2% | 3 |
| Mar 15, 2022 | 6394-54-001MMC - 639454001 | Brazos Bryan |
EMULSIONSH 6 · | $136,500 | $165,900 | CLEVELAND ASPHALT PRODUCTS, INC. | +21.5% | 4 |
| Mar 15, 2022 | 6398-47-001MMC - 639847001 | Walker Bryan |
CUTBACKIH 45 · | $140,000 | $134,700 | MARTIN RESOURCE MANAGEMENT CORPORATION | -3.8% | 3 |
| Mar 15, 2022 | 6394-86-001MMC - 639486001 | Washington Bryan |
CUTBACKSH 36 · | $105,000 | $98,700 | MARTIN RESOURCE MANAGEMENT CORPORATION | -6.0% | 3 |
| Mar 15, 2022 | 6398-46-001MMC - 639846001 | Brazos Bryan |
CUTBACKSH 6 · | $105,000 | $98,600 | MARTIN RESOURCE MANAGEMENT CORPORATION | -6.1% | 3 |
| Mar 10, 2022 | 6382-35-001MMC - 638235001 | Hartley Amarillo |
FLEXIBLE BASE TY D GR 4 ~ MATERIAL ONLYFM 807 · | $295,400 | $472,765 | B & G ELECTRIC | +60.0% | 1 |
| Mar 10, 2022 | 6396-07-001MMC - 639607001 | Moore Amarillo |
ASPHALTIC PATCHING MATERIALUS 87 · | $272,400 | $436,937 | MARTIN MARIETTA MATERIALS, INC. | +60.4% | 2 |
| Mar 10, 2022 | 6396-08-001MMC - 639608001 | Ochiltree |
ASPHALTIC PATCHING MATERIALSH 15 · | $192,599 | $318,176 | MARTIN MARIETTA MATERIALS, INC. | +65.2% | 2 |
| Mar 10, 2022 | 6396-06-001MMC - 639606001 | Oldham Amarillo |
ASPHALTIC PATCHING MATERIALIH 40 · | $169,699 | $266,198 | MARTIN MARIETTA MATERIALS, INC. | +56.9% | 2 |
| Mar 10, 2022 | 6397-10-001MMC - 639710001 | Val Verde Laredo |
EMULSIONPR 67 · | $199,755 | $264,265 | ERGON ASPHALT & EMULSIONS, INC. | +32.3% | 1 |
| Mar 9, 2022 | 6396-42-001RMC - 639642001 | Nacogdoches Lufkin |
MOWING HIGHWAY RIGHT OF WAYUS 59 · | $236,944 | $346,415 | R&M INCORPORATED | +46.2% | 3 |
| Mar 9, 2022 | 6397-52-001MMC - 639752001 | Wichita Wichita Falls |
EMULSIONUS 287 · | $259,750 | $282,650 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | +8.8% | 2 |
| Mar 9, 2022 | 6396-85-001MMC - 639685001 | Wichita Wichita Falls |
PAINT AND BEADSFM 369 · | $89,000 | $146,180 | DIGG COMMERCIAL, LLC | +64.2% | 1 |
| Mar 8, 2022 | 6393-55-001RMC - 639355001 | Kaufman Dallas |
REHABILITATION OF EXISTING ROADWAYMR 682 · | $273,967 | $391,078 | PEACHTREE CONSTRUCTION, LTD. | +42.7% | 3 |
| Mar 8, 2022 | 6396-77-001RMC - 639677001 | McLennan Waco |
MISCELLANEOUS CONCRETE REPAIRSH 6 · | $288,166 | $369,927 | CROSS PLUS CONSTRUCTION, LLC | +28.4% | 1 |
| Mar 8, 2022 | 6391-56-001MMC - 639156001 | Austin Yoakum |
HOT MIXIH 10 · | $296,000 | $316,000 | QUALITY HOT MIX, INC. | +6.8% | 2 |
| Mar 8, 2022 | 6396-82-001MMC - 639682001 | Trinity Lufkin |
EMULSIONFM 2781 · | $250,950 | $290,700 | MARTIN RESOURCE MANAGEMENT CORPORATION | +15.8% | 4 |
| Mar 8, 2022 | 6378-73-001RMC - 637873001 | Denton Dallas |
MISCELLANEOUS CONCRETE REPAIRIH 35E · | $287,150 | $246,475 | GIBSON & ASSOCIATES, INC. | -14.2% | 2 |
| Mar 8, 2022 | 6395-41-001RMC - 639541001 | Harris Houston |
PUMP STATION & DRAINAGE SYSTEM CLEANINGSL 8 · | $296,433 | $245,113 | AIMS COMPANIES | -17.3% | 3 |
| Mar 8, 2022 | 6389-44-001RMC - 638944001 | Waller Houston |
STORM SEWER CLEANINGUS 290 · | $250,400 | $237,200 | DOUBLE OAK EROSION, INC. | -5.3% | 2 |
| Mar 8, 2022 | 6394-42-001RMC - 639442001 | Anderson Tyler |
CULVERTUS 287 · | $238,505 | $229,446 | BAKER & COMPANY CONSTRUCTION, LLC | -3.8% | 5 |
| Mar 8, 2022 | 6383-66-001RMC - 638366001 | Kaufman Dallas |
CULVERT EXTENSION & CROSS DRAINAGEIH 20 · | $266,385 | $228,954 | SHALOM SERVICES CORPORATION | -14.1% | 5 |
| Mar 8, 2022 | 6393-46-001RMC - 639346001 | Dallas Dallas |
TREE TRIMMING AND BRUSH REMOVALIH 30 · | $137,800 | $124,265 | ROAD SOLUTIONS L.L.C. | -9.8% | 5 |
| Mar 8, 2022 | 6396-76-001MMC - 639676001 | Kaufman Dallas |
EMULSIONFM 2728 · | $106,350 | $112,710 | MARTIN RESOURCE MANAGEMENT CORPORATION | +6.0% | 4 |
| Mar 8, 2022 | 6397-24-001MMC - 639724001 | Midland Odessa |
FLEXIBLE BASEIH 20 · | $84,000 | $75,250 | DIGG COMMERCIAL, LLC | -10.4% | 2 |
| Mar 8, 2022 | 6395-63-001RMC - 639563001 | Presidio El Paso |
PICNIC AREA MAINTENANCEUS 90 · | $72,530 | $62,611 | LUKEDA SANDBLASTING & SERVICES LLC | -13.7% | 3 |
| Mar 8, 2022 | 6395-64-001RMC - 639564001 | Jeff Davis El Paso |
PICNIC AREA MAINTENANCESH 118 · | $46,420 | $38,311 | LUKEDA SANDBLASTING & SERVICES LLC | -17.5% | 4 |
| Mar 8, 2022 | 6397-43-001MMC - 639743001 | Pecos Odessa |
FLEXIBLE BASEIH 10 · | $45,000 | $36,500 | TOUCHSTONE RESOURCES, LLC | -18.9% | 2 |
| Mar 8, 2022 | 6398-76-001MMC - 639876001 | Polk Lufkin |
ROCK/RIPRAPUS 59 · | $33,075 | $32,000 | EAST TEXAS ASPHALT CO., LTD. | -3.3% | 3 |
| Mar 8, 2022 | 6396-83-001MMC - 639683001 | Ector Odessa |
FLEXIBLE BASESL 338 · | $25,000 | $26,800 | TOUCHSTONE RESOURCES, LLC | +7.2% | 2 |
1–100 of 188Next ›
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.