96Let jobs
$449,656,444Total low bids
$483,954,904Total estimates
-7.1%Low bids vs estimates
Feb 2021 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Feb 10, 2021 | 6366-85-001BPM - 636685001 | Erath Fort Worth |
BRIDGE STEEL PILE REPAIRFM 2156 · | $60,800 | $48,116 | BA NEWTON'S ENTERPRISES LLC | -20.9% | 6 |
| Feb 5, 2021 | 0195-01-119NH 2021(327) | Cooke Wichita Falls |
WIDEN ROAD - ADD LANESIH 35 · | $212,800,314 | $209,999,113 | AUSTIN BRIDGE & ROAD SERVICES, LP | -1.3% | 3 |
| Feb 5, 2021 | 2982-01-007C 2982-1-7 | Kaufman Dallas |
RESTORATION OF EXISTING PAVEMENT AND ADD SHOULDERSFM 1390 · | $8,344,338 | $7,598,568 | ED BELL CONSTRUCTION COMPANY | -8.9% | 11 |
| Feb 5, 2021 | 0019-02-034F 2021(340) | Johnson Fort Worth |
RESURFACE ROADWAYSH 171 · | $7,523,308 | $6,387,249 | BIG CREEK CONSTRUCTION, LTD. | -15.1% | 6 |
| Feb 5, 2021 | 3236-02-012STP 2021(220)HES | Collin Dallas |
RESTORE EXSISTING PAVEMT, ADD SHOULDERSFM 3133 · | $7,303,416 | $5,929,503 | A. K. GILLIS & SONS, LLC | -18.8% | 10 |
| Feb 5, 2021 | 0634-01-014STP 2021(318)HES | Cherokee Tyler |
HAZARD ELIMINATION & SAFETYFM 22 · | $5,329,290 | $5,533,706 | STATELINE CONSTRUCTION, LLC | +3.8% | 8 |
| Feb 5, 2021 | 1427-01-040STP 2021(370) | Hidalgo Pharr |
PREVENTIVE MAINTENANCEFM 1423 · | $5,649,564 | $5,388,775 | IOC COMPANY LLC | -4.6% | 5 |
| Feb 5, 2021 | 0050-04-027C 50-4-27 | Waller Houston |
BASE REPAIR, PLANING, SEAL COAT, PFC OVERLAYSH 6 · | $5,968,402 | $5,294,014 | VULCAN CONSTRUCTION | -11.3% | 5 |
| Feb 5, 2021 | 0180-02-041C 180-2-41 | Refugio Corpus Christi |
WIDEN ROAD - ADD LANESSH 35 · | $5,718,658 | $4,992,798 | HUNTER INDUSTRIES, LTD. | -12.7% | 7 |
| Feb 5, 2021 | 0007-03-097STP 2021(326)HES | Eastland Brownwood |
HAZARD ELIMINATION & SAFETYIH 20 · | $5,211,370 | $4,992,730 | ALTUS CONSTRUCTION LLC | -4.2% | 5 |
| Feb 5, 2021 | 0168-08-073NH 2021(372) | Randall Amarillo |
INTERSECTION IMPROVEMENTSUS 60 · | $3,792,890 | $4,103,044 | J. LEE MILLIGAN, INC. | +8.2% | 3 |
| Feb 5, 2021 | 1375-01-011STP 2021(364) | Caldwell Austin |
SEAL COATFM 1322 · | $4,737,143 | $4,094,875 | HUNTER INDUSTRIES, LTD. | -13.6% | 7 |
| Feb 5, 2021 | 6373-00-001RMC - 637300001 | Dallas Dallas |
PERF BASED OPS & MAINT OF MANANGED LANESIH 35E · | $5,537,544 | $3,650,662 | ROY JORGENSEN ASSOCIATES, INC. | -34.1% | 2 |
| Feb 5, 2021 | 0002-06-059STP 2021(354)HES | Hudspeth El Paso |
HAZARD ELIMINATION & SAFETYIH 10 · | $3,269,099 | $3,140,241 | TRI STATE ELECTRIC, LTD. | -3.9% | 1 |
| Feb 5, 2021 | 6375-89-001RMC - 637589001 | Cameron Pharr |
MILL AND INLAYBU 77X · | $3,307,628 | $3,060,238 | FOREMOST PAVING, INC. | -7.5% | 4 |
| Feb 5, 2021 | 6367-82-001RMC - 636782001 | Travis Austin |
REPAIR, REPLACE, UPGRADE MBGFFM 734 · | $4,003,847 | $2,835,985 | K-BAR SERVICES, INC. | -29.2% | 2 |
| Feb 5, 2021 | 0976-03-111STP 2021(344) | Galveston Houston |
CONSTRUCT CURB RAMPS AND SIGNAL IMPROVEMENTSFM 518 · | $2,935,761 | $2,777,975 | TI-ZACK CONCRETE, INC. | -5.4% | 9 |
| Feb 5, 2021 | 0915-00-224STP 2021(361) | Bexar San Antonio |
INTERSECTION OPERATIONAL IMPROVEMENTSVA · | $2,172,495 | $2,764,875 | RELMCO, INC. | +27.3% | 2 |
| Feb 5, 2021 | 0113-07-074NH 2021(357) | Hays Austin |
LEVEL UP, FDR, & OVERLAYUS 290 · | $2,956,176 | $2,276,991 | AUSTIN MATERIALS, LLC | -23.0% | 6 |
| Feb 5, 2021 | 0905-00-103C 905-00-103 | Lubbock Lubbock |
HAZARD ELIMINATION & SAFETYVA · | $2,287,029 | $2,185,433 | L&L COMPANY | -4.4% | 5 |
| Feb 5, 2021 | 2850-01-018STP 2021(351) | Walker Bryan |
INTERSECTION IMPROVEMENTS, RT & LT TURN LANESFM 2821 · | $2,215,967 | $2,117,590 | VULCAN CONSTRUCTION | -4.4% | 10 |
| Feb 5, 2021 | 1685-06-036STP 2021(330)HES | Fort Bend Houston |
SAFETY LIGHTINGSH 6 · | $2,219,345 | $1,979,822 | ALLSTATE SIGNAL & CONSTRUCTION, LLC | -10.8% | 10 |
| Feb 5, 2021 | 0918-47-215STP 2021(337)HES | Dallas Dallas |
TRAFFIC SIGNAL IMPROVEMENTSCS · | $2,059,691 | $1,886,400 | DURABLE SPECIALTIES, INC. | -8.4% | 5 |
| Feb 5, 2021 | 0924-00-144C 924-00-144 | El Paso El Paso |
PREVENTIVE MAINTENANCEVA · | $1,574,143 | $1,343,420 | BATTERSON, LLP | -14.7% | 6 |
| Feb 5, 2021 | 0158-02-092NH 2020(479) | Tom Green San Angelo |
BRIDGE MAINTENANCEUS 67 · | $1,262,325 | $653,340 | RAGLE CONSTRUCTION, INC. | -48.2% | 7 |
| Feb 5, 2021 | 6373-66-001RMC - 637366001 | Jefferson Beaumont |
DISTRICTWIDE SWEEPINGUS 69 · | $1,148,687 | $626,969 | SWEEPING CORPORATION OF AMERICA, INC. | -45.4% | 3 |
| Feb 5, 2021 | 6351-25-001BPM - 635125001 | Jeff Davis El Paso |
BPMSH 118 · | $587,256 | $583,502 | MIJELUM, L.L.C. | -0.6% | 3 |
| Feb 5, 2021 | 6368-68-001RMC - 636868001 | Victoria Yoakum |
FULL WIDTH AND STRIP MOWINGUS 59 · | $644,574 | $579,918 | R&M INCORPORATED | -10.0% | 5 |
| Feb 5, 2021 | 6296-80-001RMC - 629680001 | Jasper Beaumont |
MILL & IN-LAYSH 62 · | $680,992 | $577,252 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | -15.2% | 5 |
| Feb 5, 2021 | 6371-36-001RMC - 637136001 | Galveston Houston |
SLOPE REPAIR, INSTALL STEEL PILINGFM 517 · | $429,248 | $471,058 | FORDE CONSTRUCTION COMPANY, INC. | +9.7% | 11 |
| Feb 5, 2021 | 6368-64-001RMC - 636864001 | Fayette Yoakum |
FULL WIDTH AND STRIP MOWINGSH 71 · | $467,620 | $440,967 | BEN E. SMITH TRACTORS, INC. | -5.7% | 3 |
| Feb 5, 2021 | 6374-23-001RMC - 637423001 | Harris Houston |
ROADSIDE MOWINGSL 8 · | $489,688 | $420,841 | YELLOWSTONE LANDSCAPE - CENTRAL, INC. | -14.1% | 3 |
| Feb 5, 2021 | 6359-10-001TMC - 635910001 | Guadalupe San Antonio |
DELINEATORS SEGUIN RDC (MATERIAL ONLY)SH 46 · | $272,993 | $417,027 | CENTERLINE SUPPLY, INC. | +52.8% | 3 |
| Feb 5, 2021 | 6368-65-001RMC - 636865001 | Gonzales Yoakum |
FULL WIDTH AND STRIP MOWINGUS 183 · | $425,728 | $393,809 | P-VILLE, INCORPORATED | -7.5% | 3 |
| Feb 5, 2021 | 6375-84-001RMC - 637584001 | El Paso El Paso |
FLEXIBLE PAVEMENT AND POTHOLE REPAIRIH 10 · | $420,960 | $379,650 | DOUBLE H CONTRACTING INC. | -9.8% | 3 |
| Feb 5, 2021 | 6359-08-001TMC - 635908001 | Henderson Tyler |
DELINEATORS ATHENS RDC (MATERIAL ONLY)SL 7 · | $223,068 | $376,620 | TOUCHSTONE RESOURCES, LLC | +68.8% | 2 |
| Feb 5, 2021 | 6367-74-001RMC - 636774001 | Gillespie Austin |
HYDROBLASTRM 783 · | $480,313 | $355,509 | D. I. J. CONSTRUCTION, INC. | -26.0% | 3 |
| Feb 5, 2021 | 6359-11-001TMC - 635911001 | Garza Maintenance Division |
DELINEATORS POST RDC (MATERIALS ONLY)US 84 · | $199,168 | $334,114 | STRIPING SERVICE AND SUPPLY, INC. | +67.8% | 2 |
| Feb 5, 2021 | 6368-62-001RMC - 636862001 | Lavaca Yoakum |
FULL WIDTH AND STRIP MOWINGUS 77 · | $354,060 | $310,391 | P-VILLE, INCORPORATED | -12.3% | 3 |
| Feb 5, 2021 | 6368-66-001RMC - 636866001 | De Witt Yoakum |
FULL WIDTH AND STRIP MOWINGUS 87 · | $353,752 | $310,344 | P-VILLE, INCORPORATED | -12.3% | 4 |
| Feb 5, 2021 | 6368-69-001RMC - 636869001 | Jackson Yoakum |
FULL WIDTH AND STRIP MOWINGUS 59 · | $351,714 | $308,974 | P-VILLE, INCORPORATED | -12.2% | 3 |
| Feb 5, 2021 | 6368-93-001RMC - 636893001 | Lee Austin |
MOWING HIGHWAY ROWUS 290 · | $332,340 | $282,399 | R&M INCORPORATED | -15.0% | 3 |
| Feb 5, 2021 | 6373-64-001RMC - 637364001 | Collin Dallas |
CROSS DRAIN STRUCTURES REPAIR OR REPLACEMENTFM 547 · | $215,877 | $197,225 | TALBRAN ENTERPRISES LLC | -8.6% | 13 |
| Feb 5, 2021 | 0913-21-053C 913-21-53 | Matagorda Yoakum |
EMBANKMENT STABILIZATIONCR · | $91,275 | $57,975 | TASCOSA BRIDGE CO., LC | -36.5% | 10 |
| Feb 4, 2021 | 0005-14-067NH 2020(863) | Midland Odessa |
CONSTRUCT BRIDGEIH 20 · | $39,047,179 | $36,305,216 | JAMES CONSTRUCTION GROUP, L.L.C. | -7.0% | 7 |
| Feb 4, 2021 | 0160-02-025NH 2020(946) | Sutton San Angelo |
ADD PASSING LANESUS 277 · | $23,985,882 | $19,351,497 | ALLEN KELLER COMPANY | -19.3% | 12 |
| Feb 4, 2021 | 0047-07-228CM 2021(434) | Dallas Dallas |
CONSTRUCT BIKE/PED BRIDGEUS 75 · | $11,604,167 | $10,270,242 | RAGLE CONSTRUCTION, INC. | -11.5% | 8 |
| Feb 4, 2021 | 2690-01-036STP 2021(366) | Williamson Austin |
ADDING SHOULDERS WITH NO ADDED CAPACITYFM 971 · | $8,755,739 | $8,428,385 | JORDAN FOSTER CONSTRUCTION, LLC | -3.7% | 13 |
| Feb 4, 2021 | 0022-07-031C 22-7-31 | Val Verde Laredo |
SPOT BASE REPAIR, OVERLAY, RAIL UPGRADE & PVM MRKSUS 90 · | $9,284,312 | $7,511,304 | HUNTER INDUSTRIES, LTD. | -19.1% | 4 |
| Feb 4, 2021 | 0516-02-029STP 2021(377) | Goliad Corpus Christi |
REHABILITATE EXISTING ROADWAYSH 239 · | $7,795,715 | $7,455,640 | HUNTER INDUSTRIES, LTD. | -4.4% | 7 |
| Feb 4, 2021 | 1157-01-018STP 2021(345)HES | Angelina Lufkin |
REPLACE GUARDRAILFM 841 · | $5,172,350 | $5,264,677 | A. L. HELMCAMP, INC. | +1.8% | 6 |
| Feb 4, 2021 | 0495-03-065STP 2021(170)HES | Van Zandt Tyler |
REPLACE GUARDRAILIH 20 · | $7,015,842 | $4,990,253 | SEFBO PIPELINE BRIDGE, INCORPORATED | -28.9% | 7 |
| Feb 4, 2021 | 1685-01-110C 1685-1-110 | Harris Houston |
2.5 " PLANING, SEAL COAT, TOM OVERLAYFM 1960 · | $5,117,781 | $3,598,843 | ANGEL BROTHERS HOLDINGS CORP. | -29.7% | 3 |
| Feb 4, 2021 | 0267-03-030STP 2021(348) | Fayette Yoakum |
PAVEMENT REPAIR AND SURFACINGFM 609 · | $4,114,215 | $3,404,044 | HUNTER INDUSTRIES, LTD. | -17.3% | 8 |
| Feb 4, 2021 | 0055-01-029STP 2020(530)HES | Mills Brownwood |
PROFILE CENTER & EDGELINE AND THERMO STRIPINGUS 84 · | $3,713,250 | $2,994,432 | L&L COMPANY | -19.4% | 10 |
| Feb 4, 2021 | 0920-00-131NH 2021(291) | Jefferson Beaumont |
HAZARD ELIMINATION & SAFETYVA · | $2,368,838 | $2,880,282 | RAGLE CONSTRUCTION, INC. | +21.6% | 6 |
| Feb 4, 2021 | 0802-02-069NH 2021(328) | Wichita Wichita Falls |
INTERSECTION IMPROVEMENTSFM 369 · | $2,774,532 | $2,851,006 | COPPELL CONSTRUCTION CO., INC. | +2.8% | 6 |
| Feb 4, 2021 | 6375-25-001RMC - 637525001 | Madison Bryan |
MILL AND INLAYSH 21 · | $2,168,729 | $1,673,115 | BIG CREEK CONSTRUCTION, LTD. | -22.9% | 5 |
| Feb 4, 2021 | 0134-09-067NH 2021(333) | Denton Dallas |
CABLE BARRIER INSTALLATIONUS 380 · | $1,829,261 | $1,626,067 | SILVER CREEK CONSTRUCTION, INC. | -11.1% | 10 |
| Feb 4, 2021 | 0915-00-228STP 2021(362) | Bexar San Antonio |
DISTRICTWIDE NON-SITE SPECIFIC TRAF SIGNALS-FY2021VA · | $1,496,283 | $1,625,676 | THE LEVY COMPANY, INC. | +8.6% | 3 |
| Feb 4, 2021 | 6373-81-001RMC - 637381001 | Kaufman Dallas |
GUARD FENCE & CABLE BARRIER REPAIRIH 20 · | $1,853,575 | $1,504,307 | FIREMAN EXCAVATING, INC. | -18.8% | 5 |
| Feb 4, 2021 | 0305-01-035STP 2021(381) | Newton Beaumont |
SURFACING/ROADWAY RESTORATIONSH 87 · | $1,707,126 | $1,498,773 | TEXAS MATERIALS GROUP, INC. | -12.2% | 3 |
| Feb 4, 2021 | 0173-04-060STP 2021(336) | Kaufman Dallas |
HAZARD ELIMINATION & SAFETYSH 34 · | $1,236,816 | $1,399,629 | EAST TEXAS BRIDGE, INC. | +13.2% | 6 |
| Feb 4, 2021 | 0675-03-067NH 2021(349) | Leon Bryan |
RAMP MODIFICATIONS, BRIDGE & PAVEMENT REPAIRSIH 45 · | $1,331,115 | $1,382,171 | BIG CREEK CONSTRUCTION, LTD. | +3.8% | 7 |
| Feb 4, 2021 | 0374-04-035STP 2021(359)HES | Hudspeth El Paso |
HAZARD ELIMINATION & SAFETYUS 62 · | $1,842,014 | $1,312,913 | PMI PAVEMENT MARKING, LLC | -28.7% | 4 |
| Feb 4, 2021 | 0104-05-025STP 2021(356) | Presidio El Paso |
SURFACING/ROADWAY RESTORATIONSH 17 · | $922,393 | $1,293,211 | DAN WILLIAMS COMPANY | +40.2% | 2 |
| Feb 4, 2021 | 1302-02-013BR 2021(350) | Wharton Yoakum |
BRIDGE REPLACEMENTFM 647 · | $1,273,088 | $1,267,617 | SEFBO PIPELINE BRIDGE, INCORPORATED | -0.4% | 9 |
| Feb 4, 2021 | 0081-01-049C 81-1-49 | Tarrant Fort Worth |
RESURFACE ROADWAYUS 377 · | $1,527,431 | $1,193,707 | AUSTIN BRIDGE & ROAD SERVICES, LP | -21.8% | 8 |
| Feb 4, 2021 | 0113-07-075CC 113-7-75 | Hays Austin |
INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT TUS 290 · | $1,118,446 | $1,095,555 | SALINAS CONSTRUCTION TECHNOLOGIES, LTD. | -2.0% | 9 |
| Feb 4, 2021 | 2211-02-031STP 2021(365) | Williamson Austin |
RESURFACE ROADWAYFM 1460 · | $1,265,719 | $976,594 | AUSTIN MATERIALS, LLC | -22.8% | 5 |
| Feb 4, 2021 | 0111-01-095C 111-1-95 | Harris Houston |
RESTORATION OF ROADWAYFM 521 · | $1,397,202 | $969,114 | DURWOOD GREENE CONSTRUCTION CO. | -30.6% | 4 |
| Feb 4, 2021 | 0401-02-034CC 401-2-34 | Wood Tyler |
WIDEN ROAD - ADD SHOULDERSSH 154 · | $746,399 | $899,811 | EAST TEXAS BRIDGE, INC. | +20.6% | 6 |
| Feb 4, 2021 | 0915-12-633STP 2021(363)HESG | Bexar San Antonio |
HAZARD ELIMINATION & SAFETYCS · | $933,602 | $872,525 | E-Z BEL CONSTRUCTION, LLC | -6.5% | 3 |
| Feb 4, 2021 | 0179-02-085C 179-2-85 | Brazoria Houston |
PLANING, PAVEMENT REPAIR, SEAL COAT AND 1.5" HMABS 35-E · | $946,362 | $858,674 | DURWOOD GREENE CONSTRUCTION CO. | -9.3% | 6 |
| Feb 4, 2021 | 0843-03-015STP 2021(300)HES | Marion Atlanta |
SAFETY TREAT FIXED OBJECTSFM 728 · | $1,241,076 | $856,033 | R & G CONSTRUCTION, LLC | -31.0% | 13 |
| Feb 4, 2021 | 6375-62-001MMC - 637562001 | Hardin Beaumont |
HOT MIX_(MATERIAL ONLY)FM 1003 · | $810,000 | $763,250 | TEXAS MATERIALS GROUP, INC. | -5.8% | 2 |
| Feb 4, 2021 | 6367-18-001RMC - 636718001 | Wilbarger Wichita Falls |
HOT-IN-PLACE ASPHALT RECYCLINGUS 283 · | $921,887 | $745,748 | DUSTROL, INC. | -19.1% | 1 |
| Feb 4, 2021 | 6374-14-001RMC - 637414001 | Rockwall Dallas |
FULL DEPTH CONCRETE REPAIRIH 30 · | $1,208,000 | $737,950 | O. TREVINO CONSTRUCTION, LLC | -38.9% | 8 |
| Feb 4, 2021 | 0905-00-108C 905-00-108 | Lubbock Lubbock |
FY 2021 RPMSVA · | $936,253 | $721,944 | DOUBLE A CONTRACTING, L.P. | -22.9% | 4 |
| Feb 4, 2021 | 6367-33-001RMC - 636733001 | Liberty Beaumont |
BASE REPAIR MILL-OVERLAYFM 1960 · | $619,339 | $573,577 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | -7.4% | 5 |
| Feb 4, 2021 | 6352-35-001RMC - 635235001 | Parker Fort Worth |
REFLECTORIZED PAVE MRKINGS AND MRKERSIH 20 · | $654,320 | $573,159 | BATTERSON, LLP | -12.4% | 6 |
| Feb 4, 2021 | 6376-15-001RMC - 637615001 | Walker Bryan |
METAL BEAM GUARD FENCE REPAIRSH 30 · | $556,640 | $489,000 | ROY JORGENSEN ASSOCIATES, INC. | -12.2% | 4 |
| Feb 4, 2021 | 6375-23-001RMC - 637523001 | Chambers Beaumont |
PAVEMENT MARKINGSFM 1985 · | $940,179 | $486,521 | PROFESSIONAL TRAFFIC CONTROL LLC | -48.3% | 7 |
| Feb 4, 2021 | 0924-00-143C 924-00-143 | El Paso El Paso |
REPLACE GUARDRAILVA · | $584,867 | $469,044 | E. G. L. CONSTRUCTION, INC. | -19.8% | 8 |
| Feb 4, 2021 | 6368-72-001RMC - 636872001 | Wharton Yoakum |
FULL WIDTH AND STRIP MOWINGUS 59 · | $466,472 | $446,200 | CLASSIC IRRIGATION & LANDSCAPE LLC | -4.3% | 5 |
| Feb 4, 2021 | 6375-32-001RMC - 637532001 | Bell Waco |
TRAFFIC SIGNAL MAINTENANCEUS 190 · | $363,836 | $429,668 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | +18.1% | 2 |
| Feb 4, 2021 | 6361-79-001BPM - 636179001 | Howard Abilene |
MISCELLANEOUS BRIDGE REPAIRIH 20 · | $630,570 | $425,867 | MPB, INC. | -32.5% | 14 |
| Feb 4, 2021 | 6373-76-001RMC - 637376001 | El Paso El Paso |
FLEXIBLE PAVEMENT REPAIRIH 10 · | $479,400 | $419,100 | DOUBLE H CONTRACTING INC. | -12.6% | 3 |
| Feb 4, 2021 | 6368-73-001RMC - 636873001 | Matagorda Yoakum |
FULL WIDTH AND STRIP MOWINGSH 35 · | $361,036 | $343,413 | CLASSIC IRRIGATION & LANDSCAPE LLC | -4.9% | 4 |
| Feb 4, 2021 | 0901-19-191BR 2020(931) | Grayson Paris |
BRIDGE REPLACEMENTCR · | $351,583 | $334,515 | STATELINE CONSTRUCTION, LLC | -4.9% | 12 |
| Feb 4, 2021 | 6355-91-001RMC - 635591001 | Hunt Paris |
ON CALL DITCH AND CULVERT CLEANINGUS 69 · | $369,800 | $324,125 | TEXAS DRAINAGE INC. | -12.4% | 5 |
| Feb 4, 2021 | 6373-03-001RMC - 637303001 | Brazos Bryan |
INSTALL SHORTLINE AND SPECIALTY MARKINGSSH 6 · | $501,528 | $321,086 | PMI PAVEMENT MARKING, LLC | -36.0% | 10 |
| Feb 4, 2021 | 0904-02-045NH 2021(373) | Potter Amarillo |
CONSTRUCT PEDESTRIAN INFRASTRUCTUREVA · | $308,870 | $315,057 | WILLIS ELECTRIC CO., LP | +2.0% | 3 |
| Feb 4, 2021 | 6375-81-001RMC - 637581001 | Bowie Atlanta |
RAISED PAVEMENT MARKERSUS 59 · | $372,350 | $313,540 | CROSS PLUS CONSTRUCTION, LLC | -15.8% | 2 |
| Feb 4, 2021 | 6363-59-001RMC - 636359001 | El Paso El Paso |
DISTRICTWIDE STRIPINGIH 10 · | $298,550 | $222,400 | PMI PAVEMENT MARKING, LLC | -25.5% | 2 |
| Feb 4, 2021 | 6375-51-001RMC - 637551001 | Bell Waco |
SWEEPING AND DEBRIS REMOVALUS 190 · | $223,127 | $129,964 | SWEEPING CORPORATION OF AMERICA, INC. | -41.8% | 3 |
1–96 of 96
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.