| 1 | 132-6005 |
EMBANKMENT (FINAL)(ORD COMP)(TY C) | 9 | CY |
$25.00 |
$110.00 |
$300.00 |
$100.00 |
|
| 2 | 134-6004 |
BACKFILL (TY A OR B) | 248.47 | STA |
$155.00 |
$205.00 |
$100.00 |
$218.23 |
|
| 3 | 161-6017 |
COMPOST MANUF TOPSOIL (4") | 10,757 | SY |
$1.10 |
$1.00 |
$2.00 |
$2.10 |
|
| 4 | 162-6002 |
BLOCK SODDING | 10,757 | SY |
$3.75 |
$4.50 |
$4.00 |
$5.69 |
|
| 5 | 164-6051 |
DRILL SEED (TEMP)(WARM OR COOL) | 3,587 | SY |
$0.4000 |
$0.2600 |
$0.0100 |
$2.06 |
|
| 6 | 168-6001 |
VEGETATIVE WATERING | 2,136 | MG |
$2.00 |
$0.0100 |
$1.00 |
$0.1100 |
|
| 7 | 351-6002 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") | 1,600 | SY |
$55.00 |
$65.00 |
$75.00 |
$80.71 |
|
| 8 | 354-6002 |
PLAN & TEXT ASPH CONC PAV(0" TO 2") | 25,509 | SY |
$2.30 |
$3.00 |
$1.50 |
$2.86 |
|
| 9 | 400-6005 |
CEM STABIL BKFL | 9 | CY |
$175.00 |
$884.00 |
$250.00 |
$800.00 |
|
| 10 | 429-6007 |
CONC STR REPAIR (VERTICAL & OVERHEAD) | 20 | SF |
$230.00 |
$242.00 |
$400.00 |
$500.00 |
|
| 11 | 432-6002 |
RIPRAP (CONC)(5 IN) | 8.5 | CY |
$300.00 |
$663.00 |
$600.00 |
$653.15 |
|
| 12 | 432-6026 |
RIPRAP (STONE COMMON)(DRY)(18 IN) | 85 | CY |
$350.00 |
$304.00 |
$200.00 |
$301.61 |
|
| 13 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 175 | CY |
$475.00 |
$592.00 |
$600.00 |
$577.13 |
|
| 14 | 480-6001 |
CLEAN EXIST CULVERTS | 4 | EA |
$2,000.00 |
$1,600.00 |
$1,500.00 |
$1,500.00 |
|
| 15 | 500-6001 |
MOBILIZATION | 1 | LS |
$232,464.00 |
$178,116.00 |
$100,000.00 |
$293,901.48 |
|
| 16 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 | MO |
$9,500.00 |
$26,000.00 |
$10,000.00 |
$25,000.00 |
|
| 17 | 506-6003 |
ROCK FILTER DAMS (INSTALL) (TY 3) | 270 | LF |
$55.00 |
$62.00 |
$56.00 |
$112.29 |
|
| 18 | 506-6011 |
ROCK FILTER DAMS (REMOVE) | 270 | LF |
$10.00 |
$8.85 |
$8.00 |
$15.37 |
|
| 19 | 506-6020 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 234 | SY |
$20.00 |
$25.40 |
$25.00 |
$38.62 |
|
| 20 | 506-6024 |
CONSTRUCTION EXITS (REMOVE) | 234 | SY |
$7.00 |
$7.62 |
$7.50 |
$7.63 |
|
| 21 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 3,014 | LF |
$2.75 |
$2.37 |
$2.30 |
$4.45 |
|
| 22 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 3,014 | LF |
$0.5000 |
$0.5200 |
$0.5000 |
$0.8800 |
|
| 23 | 506-6041 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 2,237 | LF |
$4.30 |
$4.10 |
$4.00 |
$5.65 |
|
| 24 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 2,237 | LF |
$1.15 |
$0.7800 |
$0.7500 |
$0.8800 |
|
| 25 | 533-6001 |
RUMBLE STRIPS (SHOULDER) | 41,264 | LF |
$0.1800 |
$0.1450 |
$0.1400 |
$0.3400 |
|
| 26 | 533-6002 |
RUMBLE STRIPS (CENTERLINE) | 19,331 | LF |
$0.1800 |
$0.1450 |
$0.1400 |
$0.3600 |
|
| 27 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 1,895 | LF |
$23.00 |
$24.00 |
$22.00 |
$22.25 |
|
| 28 | 540-6020 |
MTL W - BEAM GD FEN (LOW FILL CULVERT) | 180 | LF |
$90.00 |
$103.00 |
$200.00 |
$60.00 |
|
| 29 | 540-6033 |
MTL BM GD FEN (LONG SPAN SYSTEM) | 1 | EA |
$1,300.00 |
$1,705.00 |
$1,500.00 |
$1,125.00 |
|
| 30 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 1,975 | LF |
$2.75 |
$1.75 |
$5.00 |
$3.00 |
|
| 31 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 18 | EA |
$3,000.00 |
$2,800.00 |
$2,750.00 |
$2,900.00 |
|
| 32 | 544-6003 |
GUARDRAIL END TREATMENT (REMOVE) | 17 | EA |
$250.00 |
$208.00 |
$200.00 |
$300.00 |
|
| 33 | 644-6001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 91 | EA |
$500.00 |
$670.00 |
$615.00 |
$615.00 |
|
| 34 | 644-6004 |
IN SM RD SN SUP&AM TY10BWG(1)SA(T) | 2 | EA |
$550.00 |
$825.00 |
$750.00 |
$750.00 |
|
| 35 | 644-6031 |
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT) | 1 | EA |
$750.00 |
$1,275.00 |
$1,115.00 |
$1,115.00 |
|
| 36 | 644-6033 |
IN SM RD SN SUP&AM TYS80(1)SA(U) | 1 | EA |
$850.00 |
$1,230.00 |
$1,080.00 |
$1,080.00 |
|
| 37 | 644-6034 |
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT) | 2 | EA |
$925.00 |
$1,400.00 |
$1,230.00 |
$1,230.00 |
|
| 38 | 644-6036 |
IN SM RD SN SUP&AM TYS80(1)SA(U-BM) | 7 | EA |
$800.00 |
$1,400.00 |
$1,250.00 |
$1,250.00 |
|
| 39 | 644-6076 |
REMOVE SM RD SN SUP&AM | 104 | EA |
$100.00 |
$78.00 |
$20.00 |
$20.00 |
|
| 40 | 658-6062 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 38 | EA |
$29.00 |
$25.75 |
$24.00 |
$24.00 |
|
| 41 | 658-6100 |
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI) | 9 | EA |
$130.00 |
$46.00 |
$75.00 |
$100.00 |
|
| 42 | 662-6111 |
WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 1,255 | EA |
$1.50 |
$1.05 |
$0.7500 |
$3.88 |
|
| 43 | 666-6018 |
REFL PAV MRK TY I (W)6"(DOT)(100MIL) | 507 | LF |
$5.50 |
$1.03 |
$1.00 |
$1.00 |
|
| 44 | 666-6036 |
REFL PAV MRK TY I (W)8"(SLD)(100MIL) | 689 | LF |
$1.20 |
$1.03 |
$1.00 |
$1.00 |
|
| 45 | 666-6042 |
REFL PAV MRK TY I (W)12"(SLD)(100MIL) | 132 | LF |
$3.80 |
$5.20 |
$4.00 |
$5.00 |
|
| 46 | 666-6048 |
REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 267 | LF |
$7.00 |
$8.20 |
$8.00 |
$8.00 |
|
| 47 | 666-6054 |
REFL PAV MRK TY I (W)(ARROW)(100MIL) | 6 | EA |
$140.00 |
$156.00 |
$150.00 |
$150.00 |
|
| 48 | 666-6078 |
REFL PAV MRK TY I (W)(WORD)(100MIL) | 11 | EA |
$160.00 |
$207.00 |
$175.00 |
$200.00 |
|
| 49 | 666-6170 |
REFL PAV MRK TY II (W) 4" (SLD) | 57,588 | LF |
$0.2000 |
$0.1600 |
$0.1700 |
$0.1500 |
|
| 50 | 666-6178 |
REFL PAV MRK TY II (W) 8" (SLD) | 51 | LF |
$0.3500 |
$1.03 |
$0.4200 |
$1.00 |
|
| 51 | 666-6182 |
REFL PAV MRK TY II (W) 24" (SLD) | 267 | LF |
$3.50 |
$2.04 |
$3.00 |
$2.00 |
|
| 52 | 666-6207 |
REFL PAV MRK TY II (Y) 4" (SLD) | 57,588 | LF |
$0.2000 |
$0.1600 |
$0.1700 |
$0.1500 |
|
| 53 | 666-6224 |
PAVEMENT SEALER 4" | 1,100 | LF |
$0.2000 |
$0.2600 |
$0.5000 |
$0.2500 |
|
| 54 | 666-6228 |
PAVEMENT SEALER 12" | 132 | LF |
$1.20 |
$2.06 |
$1.00 |
$2.00 |
|
| 55 | 666-6230 |
PAVEMENT SEALER 24" | 27 | LF |
$2.00 |
$4.08 |
$2.00 |
$4.00 |
|
| 56 | 666-6303 |
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) | 41,678 | LF |
$0.4000 |
$0.4800 |
$0.5000 |
$0.4600 |
|
| 57 | 666-6309 |
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) | 8,597 | LF |
$0.7000 |
$0.7300 |
$0.8000 |
$0.7000 |
|
| 58 | 666-6312 |
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) | 2,900 | LF |
$0.5000 |
$0.5800 |
$0.5500 |
$0.5500 |
|
| 59 | 666-6315 |
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) | 34,142 | LF |
$0.4500 |
$0.4800 |
$0.5500 |
$0.4600 |
|
| 60 | 672-6007 |
REFL PAV MRKR TY I-C | 38 | EA |
$4.30 |
$10.50 |
$5.00 |
$10.00 |
|
| 61 | 672-6009 |
REFL PAV MRKR TY II-A-A | 819 | EA |
$4.30 |
$4.62 |
$3.75 |
$4.50 |
|
| 62 | 677-6001 |
ELIM EXT PAV MRK & MRKS (4") | 1,556 | LF |
$0.5000 |
$1.03 |
$2.00 |
$1.00 |
|
| 63 | 677-6005 |
ELIM EXT PAV MRK & MRKS (12") | 132 | LF |
$1.75 |
$3.09 |
$3.00 |
$3.00 |
|
| 64 | 677-6007 |
ELIM EXT PAV MRK & MRKS (24") | 15 | LF |
$3.85 |
$5.20 |
$4.00 |
$5.00 |
|
| 65 | 677-6008 |
ELIM EXT PAV MRK & MRKS (ARROW) | 2 | EA |
$65.00 |
$78.00 |
$100.00 |
$75.00 |
|
| 66 | 677-6012 |
ELIM EXT PAV MRK & MRKS (WORD) | 2 | EA |
$115.00 |
$104.00 |
$100.00 |
$100.00 |
|
| 67 | 678-6001 |
PAV SURF PREP FOR MRK (4") | 1,556 | LF |
$0.1500 |
$1.03 |
$0.5000 |
$1.00 |
|
| 68 | 678-6006 |
PAV SURF PREP FOR MRK (12") | 132 | LF |
$0.6000 |
$0.8400 |
$1.00 |
$0.8000 |
|
| 69 | 678-6008 |
PAV SURF PREP FOR MRK (24") | 15 | LF |
$1.05 |
$2.06 |
$1.00 |
$2.00 |
|
| 70 | 678-6009 |
PAV SURF PREP FOR MRK (ARROW) | 2 | EA |
$20.00 |
$10.25 |
$14.00 |
$10.00 |
|
| 71 | 678-6016 |
PAV SURF PREP FOR MRK (WORD) | 2 | EA |
$20.00 |
$10.25 |
$16.00 |
$15.00 |
|
| 72 | 730-6107 |
FULL - WIDTH MOWING | 2 | CYC |
$5,600.00 |
$1,550.00 |
$1,500.00 |
$3,600.00 |
|
| 73 | 760-6001 |
DITCH CLEANING AND RESHAPING (FOOT) | 800 | LF |
$25.00 |
$8.85 |
$10.00 |
$8.00 |
|
| 74 | 780-6004 |
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL) | 8 | LF |
$250.00 |
$120.00 |
$125.00 |
$200.00 |
|
| 75 | 3077-6023 |
SP MIXES SP-C SAC-B PG70-22 | 13,578 | TON |
$110.00 |
$121.53 |
$137.50 |
$114.50 |
|
| 76 | 3077-6075 |
TACK COAT | 10,642 | GAL |
$3.75 |
$0.0100 |
$0.0100 |
$4.50 |
|
| 77 | 6001-6002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 4 | EA |
$13,000.00 |
$2,900.00 |
$4,600.00 |
$3,031.00 |
|
| 78 | 6185-6002 |
TMA (STATIONARY) | 68 | DAY |
$145.00 |
$1.00 |
$1.00 |
$304.88 |
|
| 79 | 6185-6005 |
TMA (MOBILE OPERATION) | 25 | DAY |
$300.00 |
$1.00 |
$1.00 |
$811.72 |
|