| 1 | 100-6009 |
PREPARING ROW (TREE) (6" TO 24" DIA) | 5 | EA |
$2,380.00 |
$1,650.00 |
$9,000.00 |
$16,400.00 |
| 2 | 110-6001 |
EXCAVATION (ROADWAY) | 265 | CY |
$23.00 |
$11.00 |
$52.00 |
$22.00 |
| 3 | 112-6001 |
SUBGRADE WIDENING (ORD COMP) | 2 | STA |
$800.00 |
$5,500.00 |
$3,200.00 |
$3,400.00 |
| 4 | 132-6005 |
EMBANKMENT (FINAL)(ORD COMP)(TY C) | 264 | CY |
$50.00 |
$66.00 |
$73.00 |
$61.00 |
| 5 | 132-6007 |
EMBANKMENT (FINAL)(ORD COMP)(TY D) | 265 | CY |
$50.00 |
$33.00 |
$47.00 |
$62.00 |
| 6 | 164-6001 |
BROADCAST SEED (PERM) (RURAL) (SANDY) | 672 | SY |
$0.1800 |
$1.00 |
$3.00 |
$2.10 |
| 7 | 164-6009 |
BROADCAST SEED (TEMP) (WARM) | 336 | SY |
$0.1000 |
$1.00 |
$3.50 |
$3.55 |
| 8 | 164-6011 |
BROADCAST SEED (TEMP) (COOL) | 336 | SY |
$0.1000 |
$1.00 |
$3.50 |
$3.55 |
| 9 | 168-6001 |
VEGETATIVE WATERING | 6 | MG |
$20.00 |
$110.00 |
$190.00 |
$111.00 |
| 10 | 216-6001 |
PROOF ROLLING | 10 | HR |
$100.00 |
$275.00 |
$130.00 |
$100.00 |
| 11 | 247-6041 |
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) | 173 | CY |
$210.00 |
$83.00 |
$195.00 |
$200.00 |
| 12 | 310-6005 |
PRIME COAT (AE-P) | 248 | GAL |
$22.00 |
$11.00 |
$9.00 |
$9.00 |
| 13 | 400-6005 |
CEM STABIL BKFL | 33 | CY |
$230.00 |
$330.00 |
$210.00 |
$250.00 |
| 14 | 409-6002 |
PRESTR CONC PIL (18 IN SQ) | 381 | LF |
$168.00 |
$72.00 |
$130.00 |
$210.00 |
| 15 | 420-6013 |
CL C CONC (ABUT) | 18.4 | CY |
$2,000.00 |
$2,750.00 |
$1,200.00 |
$2,900.00 |
| 16 | 422-6007 |
REINF CONC SLAB (SLAB BEAM) | 1,300 | SF |
$30.00 |
$55.00 |
$25.00 |
$84.00 |
| 17 | 422-6015 |
APPROACH SLAB | 19 | CY |
$800.00 |
$550.00 |
$1,500.00 |
$1,300.00 |
| 18 | 425-6012 |
PRESTR CONC SLAB BEAM (5SB15) | 247.5 | LF |
$250.00 |
$330.00 |
$357.00 |
$330.00 |
| 19 | 432-6033 |
RIPRAP (STONE PROTECTION)(18 IN) | 394 | CY |
$200.00 |
$220.00 |
$170.00 |
$204.00 |
| 20 | 450-6006 |
RAIL (TY T223) | 124 | LF |
$160.00 |
$275.00 |
$137.00 |
$287.00 |
| 21 | 454-6003 |
ARMOR JOINT | 44 | LF |
$120.00 |
$248.00 |
$158.00 |
$130.00 |
| 22 | 496-6009 |
REMOV STR (BRIDGE 0 - 99 FT LENGTH) | 1 | EA |
$35,000.00 |
$16,500.00 |
$21,000.00 |
$59,000.00 |
| 23 | 500-6001 |
MOBILIZATION | 1 | LS |
$83,000.00 |
$71,500.00 |
$223,000.00 |
$102,000.00 |
| 24 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 5 | MO |
$3,000.00 |
$3,300.00 |
$2,600.00 |
$3,500.00 |
| 25 | 506-6002 |
ROCK FILTER DAMS (INSTALL) (TY 2) | 50 | LF |
$60.00 |
$110.00 |
$58.00 |
$56.00 |
| 26 | 506-6011 |
ROCK FILTER DAMS (REMOVE) | 50 | LF |
$16.00 |
$11.00 |
$11.00 |
$11.00 |
| 27 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 100 | LF |
$40.00 |
$110.00 |
$38.00 |
$37.00 |
| 28 | 540-6006 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 4 | EA |
$2,250.00 |
$3,300.00 |
$3,600.00 |
$2,250.00 |
| 29 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 4 | EA |
$3,000.00 |
$3,850.00 |
$3,300.00 |
$3,150.00 |
| 30 | 658-6014 |
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) | 8 | EA |
$21.00 |
$28.00 |
$16.00 |
$43.00 |
| 31 | 658-6062 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 8 | EA |
$28.00 |
$28.00 |
$30.00 |
$63.00 |
| 32 | 3076-6066 |
TACK COAT | 124 | GAL |
$16.00 |
$6.00 |
$10.00 |
$10.00 |
| 33 | 3076-6071 |
D-GR HMA TY-D PG 64-22 (EXEMPT) | 137 | TON |
$350.00 |
$330.00 |
$210.00 |
$300.00 |
| 34 | 6001-6002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 2 | EA |
$10,000.00 |
$4,400.00 |
$8,000.00 |
$14,800.00 |