| 1 | 104-6009 |
REMOVING CONC (RIPRAP) | 2,410 | SY |
$16.00 |
$14.77 |
$16.50 |
$17.00 |
| 2 | 104-6022 |
REMOVING CONC (CURB AND GUTTER) | 904 | LF |
$10.00 |
$4.15 |
$7.35 |
$30.00 |
| 3 | 105-6038 |
REMOVING STAB BASE AND ASPH PAV (11") | 2,340 | SY |
$6.00 |
$4.77 |
$10.00 |
$7.00 |
| 4 | 110-6001 |
EXCAVATION (ROADWAY) | 7,479 | CY |
$9.00 |
$13.24 |
$18.50 |
$20.00 |
| 5 | 112-6001 |
SUBGRADE WIDENING (ORD COMP) | 21 | STA |
$400.00 |
$1,155.16 |
$770.00 |
$750.00 |
| 6 | 132-6006 |
EMBANKMENT (FINAL)(DENS CONT)(TY C) | 220 | CY |
$27.50 |
$164.67 |
$54.00 |
$50.00 |
| 7 | 150-6001 |
BLADING | 87 | STA |
$125.00 |
$241.12 |
$130.00 |
$265.00 |
| 8 | 164-6037 |
DRILL SEEDING (PERM) (URBAN) (SANDY) | 7,760 | SY |
$0.2500 |
$1.18 |
$0.5000 |
$0.7500 |
| 9 | 168-6001 |
VEGETATIVE WATERING | 261 | MG |
$45.00 |
$37.65 |
$47.00 |
$26.00 |
| 10 | 216-6001 |
PROOF ROLLING | 36 | HR |
$155.00 |
$161.40 |
$165.00 |
$90.00 |
| 11 | 247-6064 |
FL BS (CMP IN PLC)(TY A GR 4) (6") | 4,212 | SY |
$20.00 |
$13.34 |
$16.00 |
$13.00 |
| 12 | 247-6104 |
FL BS (RDWY DEL) (TY A GR 4) (IN VEH) | 4,274 | CY |
$50.00 |
$41.69 |
$48.00 |
$51.00 |
| 13 | 251-6488 |
REWORK BS MTL (TY C) (7.5") (DENS CONT) | 38,464 | SY |
$3.00 |
$2.19 |
$5.05 |
$3.50 |
| 14 | 275-6001 |
CEMENT | 35 | TON |
$150.00 |
$151.93 |
$170.00 |
$190.00 |
| 15 | 275-6019 |
CEMENT TREAT (SUBGRADE)(6") | 4,212 | SY |
$2.75 |
$3.30 |
$3.80 |
$3.20 |
| 16 | 305-6032 |
SALV HAUL & STKPL RCL APH PV (6") | 38,464 | SY |
$4.00 |
$3.20 |
$3.10 |
$4.00 |
| 17 | 310-6009 |
PRIME COAT (MC-30) | 842 | GAL |
$4.00 |
$5.82 |
$5.45 |
$7.50 |
| 18 | 315-6004 |
FOG SEAL (CSS-1H) | 6,923 | GAL |
$3.50 |
$3.86 |
$3.90 |
$4.40 |
| 19 | 316-6017 |
ASPH (AC-20-5TR) | 71,614 | GAL |
$3.25 |
$3.63 |
$3.95 |
$4.40 |
| 20 | 316-6222 |
AGGR(TY-PB GR-3 SAC-B) | 1,550 | CY |
$100.00 |
$188.34 |
$160.00 |
$140.00 |
| 21 | 340-6124 |
D-GR HMA(SQ) TY-D SAC-B PG70-28 | 28 | TON |
$150.00 |
$285.18 |
$480.00 |
$330.00 |
| 22 | 341-6086 |
D-GR HMA TY-B PG70-28 | 7,483 | TON |
$95.00 |
$97.54 |
$120.00 |
$122.00 |
| 23 | 346-6048 |
STONE-MTRX-ASPH SMA-D SAC-A PG70-28 | 20,120 | TON |
$150.00 |
$139.59 |
$143.50 |
$155.00 |
| 24 | 351-6002 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") | 4,263 | SY |
$35.00 |
$43.56 |
$57.50 |
$74.00 |
| 25 | 354-6045 |
PLANE ASPH CONC PAV (2") | 165,401 | SY |
$1.50 |
$1.30 |
$1.65 |
$1.30 |
| 26 | 361-6051 |
FULL-DPTH REP(BR APPROACH SLAB)(9"-13") | 300 | SY |
$400.00 |
$340.74 |
$445.00 |
$310.00 |
| 27 | 401-6001 |
FLOWABLE BACKFILL | 270 | CY |
$250.00 |
$142.55 |
$280.00 |
$270.00 |
| 28 | 420-6066 |
CL C CONC (RAIL FOUNDATION) | 50 | CY |
$600.00 |
$741.56 |
$890.00 |
$570.00 |
| 29 | 432-6001 |
RIPRAP (CONC)(4 IN) | 1,713 | CY |
$600.00 |
$751.90 |
$610.00 |
$500.00 |
| 30 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 240 | CY |
$410.00 |
$641.66 |
$725.00 |
$500.00 |
| 31 | 450-6014 |
RAIL (TY T551) | 306 | LF |
$65.00 |
$188.36 |
$110.00 |
$140.00 |
| 32 | 500-6001 |
MOBILIZATION | 1 | LS |
$1,000,000.00 |
$933,265.87 |
$1,020,000.00 |
$1,000,000.00 |
| 33 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 18 | MO |
$10,000.00 |
$5,185.22 |
$19,500.00 |
$15,000.00 |
| 34 | 506-6035 |
SANDBAGS FOR EROSION CONTROL | 425 | EA |
$10.00 |
$7.06 |
$4.15 |
$10.00 |
| 35 | 506-6041 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 600 | LF |
$7.50 |
$2.91 |
$3.60 |
$6.00 |
| 36 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 600 | LF |
$2.50 |
$0.8900 |
$1.40 |
$2.00 |
| 37 | 508-6001 |
CONSTRUCTING DETOURS | 2,650 | SY |
$75.00 |
$76.72 |
$86.50 |
$95.00 |
| 38 | 512-6017 |
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1) | 16,000 | LF |
$16.00 |
$9.16 |
$8.75 |
$13.00 |
| 39 | 512-6029 |
PORT CTB (MOVE)(F-SHAPE)(TY 1) | 24,700 | LF |
$7.00 |
$4.30 |
$7.30 |
$12.00 |
| 40 | 512-6041 |
PORT CTB (STKPL)(F-SHAPE)(TY 1) | 16,000 | LF |
$10.00 |
$9.16 |
$8.15 |
$12.00 |
| 41 | 533-6001 |
RUMBLE STRIPS (SHOULDER) | 84,186 | LF |
$0.1000 |
$0.2800 |
$0.1600 |
$0.3000 |
| 42 | 540-6002 |
MTL W-BEAM GD FEN (STEEL POST) | 12,477 | LF |
$27.00 |
$30.86 |
$25.50 |
$27.00 |
| 43 | 540-6006 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 15 | EA |
$2,125.00 |
$2,230.23 |
$2,100.00 |
$1,600.00 |
| 44 | 540-6016 |
DOWNSTREAM ANCHOR TERMINAL SECTION | 7 | EA |
$1,300.00 |
$1,305.66 |
$1,300.00 |
$1,200.00 |
| 45 | 540-6018 |
MTL BM GD FEN TRANS (NON - SYM) | 5 | EA |
$1,000.00 |
$1,186.96 |
$945.00 |
$1,100.00 |
| 46 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 10,428 | LF |
$4.75 |
$2.37 |
$3.35 |
$2.20 |
| 47 | 542-6002 |
REMOVE TERMINAL ANCHOR SECTION | 6 | EA |
$250.00 |
$178.05 |
$390.00 |
$160.00 |
| 48 | 542-6003 |
REMOVE DOWNSTREAM ANCHOR TERMINAL | 3 | EA |
$200.00 |
$178.04 |
$335.00 |
$160.00 |
| 49 | 542-6004 |
RM MTL BM GD FENCE TRANS (THRIE-BEAM) | 5 | EA |
$300.00 |
$237.39 |
$3,700.00 |
$220.00 |
| 50 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 17 | EA |
$2,600.00 |
$2,967.41 |
$3,000.00 |
$2,600.00 |
| 51 | 544-6003 |
GUARDRAIL END TREATMENT (REMOVE) | 15 | EA |
$450.00 |
$237.39 |
$335.00 |
$220.00 |
| 52 | 545-6003 |
CRASH CUSH ATTEN (MOVE & RESET) | 6 | EA |
$1,800.00 |
$1,186.96 |
$3,100.00 |
$1,000.00 |
| 53 | 545-6005 |
CRASH CUSH ATTEN (REMOVE) | 4 | EA |
$1,800.00 |
$1,388.75 |
$1,200.00 |
$1,000.00 |
| 54 | 545-6019 |
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) | 3 | EA |
$11,500.00 |
$8,902.22 |
$10,500.00 |
$12,500.00 |
| 55 | 636-6008 |
REPLACE EXISTING ALUMINUM SIGNS(TY G) | 131.25 | SF |
$40.00 |
$21.37 |
$52.50 |
$19.00 |
| 56 | 644-6031 |
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT) | 2 | EA |
$1,250.00 |
$1,186.97 |
$1,200.00 |
$1,100.00 |
| 57 | 644-6076 |
REMOVE SM RD SN SUP&AM | 1 | EA |
$500.00 |
$118.70 |
$83.50 |
$110.00 |
| 58 | 658-6001 |
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND | 120 | EA |
$75.00 |
$59.35 |
$120.00 |
$55.00 |
| 59 | 658-6018 |
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND | 120 | EA |
$145.00 |
$59.35 |
$120.00 |
$55.00 |
| 60 | 658-6048 |
INSTL OM ASSM (OM-2Z)(FLX)GND | 25 | EA |
$100.00 |
$77.15 |
$120.00 |
$70.00 |
| 61 | 658-6049 |
INSTL OM ASSM (OM-2Z)(FLX)GND(BI) | 18 | EA |
$100.00 |
$83.09 |
$120.00 |
$75.00 |
| 62 | 658-6060 |
REMOVE DELIN & OBJECT MARKER ASSMS | 43 | EA |
$30.00 |
$11.87 |
$16.50 |
$12.00 |
| 63 | 658-6061 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 | 113 | EA |
$45.00 |
$11.87 |
$30.00 |
$12.00 |
| 64 | 658-6064 |
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2 | 25 | EA |
$45.00 |
$11.87 |
$30.00 |
$12.00 |
| 65 | 662-6004 |
WK ZN PAV MRK NON-REMOV (W)4"(SLD) | 42,000 | LF |
$0.1400 |
$0.2500 |
$0.2300 |
$0.2200 |
| 66 | 662-6005 |
WK ZN PAV MRK NON-REMOV (W)6"(BRK) | 10,000 | LF |
$0.3000 |
$0.3600 |
$0.3300 |
$0.3200 |
| 67 | 662-6034 |
WK ZN PAV MRK NON-REMOV (Y)4"(SLD) | 42,000 | LF |
$0.1500 |
$0.2500 |
$0.2300 |
$0.2200 |
| 68 | 662-6046 |
WK ZN PAV MRK REMOV (REFL) TY I-A | 1,924 | EA |
$4.00 |
$4.15 |
$3.90 |
$3.70 |
| 69 | 662-6048 |
WK ZN PAV MRK REMOV (REFL) TY I-C | 2,014 | EA |
$4.00 |
$4.15 |
$3.90 |
$3.70 |
| 70 | 662-6056 |
WK ZN PAV MRK REMOV (TRAF BTN) TY W | 6,038 | EA |
$3.50 |
$2.49 |
$2.35 |
$2.20 |
| 71 | 662-6058 |
WK ZN PAV MRK REMOV (TRAF BTN) TY Y | 5,768 | EA |
$3.50 |
$2.49 |
$2.35 |
$2.20 |
| 72 | 662-6111 |
WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 4,300 | EA |
$2.50 |
$1.24 |
$1.10 |
$0.7000 |
| 73 | 666-6036 |
REFL PAV MRK TY I (W)8"(SLD)(100MIL) | 3,500 | LF |
$0.4000 |
$1.13 |
$1.05 |
$1.00 |
| 74 | 666-6224 |
PAVEMENT SEALER 4" | 3,200 | LF |
$0.2500 |
$0.2800 |
$0.2700 |
$0.2500 |
| 75 | 666-6225 |
PAVEMENT SEALER 6" | 1,600 | LF |
$0.2500 |
$0.4200 |
$0.3900 |
$0.3700 |
| 76 | 666-6303 |
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) | 47,616 | LF |
$0.2000 |
$0.5700 |
$0.5300 |
$0.5000 |
| 77 | 666-6306 |
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL) | 11,904 | LF |
$0.3500 |
$0.8500 |
$0.8000 |
$0.7600 |
| 78 | 666-6312 |
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) | 47,616 | LF |
$0.2000 |
$0.5700 |
$0.5300 |
$0.5000 |
| 79 | 668-6073 |
PREFAB PAV MRK TY C (W) (12") (LNDP) | 500 | LF |
$15.00 |
$13.06 |
$12.00 |
$12.00 |
| 80 | 668-6074 |
PREFAB PAV MRK TY C (W) (12") (SLD) | 600 | LF |
$10.00 |
$13.06 |
$12.00 |
$12.00 |
| 81 | 668-6077 |
PREFAB PAV MRK TY C (W) (ARROW) | 6 | EA |
$260.00 |
$580.43 |
$545.00 |
$520.00 |
| 82 | 668-6085 |
PREFAB PAV MRK TY C (W) (WORD) | 6 | EA |
$385.00 |
$830.87 |
$780.00 |
$750.00 |
| 83 | 672-6010 |
REFL PAV MRKR TY II-C-R | 1,000 | EA |
$2.25 |
$4.75 |
$4.45 |
$4.50 |
| 84 | 677-6001 |
ELIM EXT PAV MRK & MRKS (4") | 27,000 | LF |
$0.4500 |
$0.6500 |
$0.6100 |
$0.9000 |
| 85 | 678-6001 |
PAV SURF PREP FOR MRK (4") | 3,200 | LF |
$0.2500 |
$0.3300 |
$0.3100 |
$0.3000 |
| 86 | 678-6002 |
PAV SURF PREP FOR MRK (6") | 1,600 | LF |
$0.7500 |
$0.5000 |
$0.4700 |
$0.4500 |
| 87 | 678-6006 |
PAV SURF PREP FOR MRK (12") | 1,000 | LF |
$2.00 |
$0.9900 |
$0.9200 |
$0.9000 |
| 88 | 678-6009 |
PAV SURF PREP FOR MRK (ARROW) | 6 | EA |
$32.50 |
$17.53 |
$16.50 |
$16.00 |
| 89 | 678-6016 |
PAV SURF PREP FOR MRK (WORD) | 6 | EA |
$63.50 |
$19.48 |
$18.50 |
$17.00 |
| 90 | 730-6107 |
FULL - WIDTH MOWING | 4 | CYC |
$10,000.00 |
$5,995.81 |
$7,600.00 |
$2,200.00 |
| 91 | 734-6002 |
LITTER REMOVAL | 4 | CYC |
$5,000.00 |
$3,356.51 |
$5,000.00 |
$1,900.00 |
| 92 | 3063-6001 |
ASPHALT BINDER (PG64-22) | 96,159 | GAL |
$2.50 |
$3.00 |
$2.80 |
$3.00 |
| 93 | 3063-6002 |
CEMENT | 115 | TON |
$140.00 |
$151.93 |
$170.00 |
$192.00 |
| 94 | 3063-6003 |
FOAMED ASPHALT TREAT (8") (DC) | 38,464 | SY |
$3.50 |
$12.29 |
$6.50 |
$6.50 |
| 95 | 6001-6001 |
PORTABLE CHANGEABLE MESSAGE SIGN | 315 | DAY |
$110.00 |
$89.02 |
$89.00 |
$120.00 |
| 96 | 6185-6002 |
TMA (STATIONARY) | 55 | DAY |
$175.00 |
$1,186.96 |
$605.00 |
$350.00 |
| 97 | 6185-6005 |
TMA (MOBILE OPERATION) | 55 | DAY |
$500.00 |
$1,422.77 |
$1,100.00 |
$580.00 |