| 1 | 100-6002 |
PREPARING ROW | 98.7 | STA |
$4,200.00 |
$1,394.00 |
$1,000.00 |
$1,500.00 |
|
| 2 | 104-6017 |
REMOVING CONC (DRIVEWAYS) | 2,293 | SY |
$13.34 |
$7.00 |
$20.00 |
$20.00 |
|
| 3 | 105-6005 |
REMOVING STAB BASE AND ASPH PAV (3") | 17,412 | SY |
$5.50 |
$4.00 |
$3.00 |
$3.25 |
|
| 4 | 105-6018 |
REMOVING STAB BASE AND ASPH PAV (7") | 3,556 | SY |
$7.32 |
$5.00 |
$5.00 |
$4.35 |
|
| 5 | 105-6026 |
REMOVE STAB BASE & ASPH PAV (13"-18") | 9,593 | SY |
$4.12 |
$9.00 |
$10.00 |
$9.80 |
|
| 6 | 105-6045 |
REMOVING STAB BASE AND ASPH PAV (2"-8") | 7,240 | SY |
$2.80 |
$5.00 |
$5.00 |
$5.00 |
|
| 7 | 110-6001 |
EXCAVATION (ROADWAY) | 4,900 | CY |
$8.67 |
$16.00 |
$22.00 |
$20.00 |
|
| 8 | 134-6004 |
BACKFILL (TY A OR B) | 98.7 | STA |
$300.00 |
$50.00 |
$500.00 |
$205.00 |
|
| 9 | 161-6017 |
COMPOST MANUF TOPSOIL (4") | 32,892 | SY |
$1.11 |
$2.55 |
$2.00 |
$1.00 |
|
| 10 | 164-6035 |
DRILL SEEDING (PERM) (RURAL) (CLAY) | 32,892 | SY |
$0.1300 |
$0.1500 |
$0.1500 |
$0.1600 |
|
| 11 | 164-6051 |
DRILL SEED (TEMP)(WARM OR COOL) | 32,892 | SY |
$0.2300 |
$0.1300 |
$0.1500 |
$0.1400 |
|
| 12 | 168-6001 |
VEGETATIVE WATERING | 4,894 | MG |
$13.50 |
$18.00 |
$1.00 |
$16.00 |
|
| 13 | 247-6487 |
FL BS (CMP IN PLC) (TY D GR 1-2) (24") | 9,742 | SY |
$38.00 |
$50.00 |
$70.00 |
$80.00 |
|
| 14 | 310-6027 |
PRIME COAT(MC-30 OR AE-P) | 2,393 | GAL |
$3.76 |
$4.65 |
$5.00 |
$5.00 |
|
| 15 | 344-6104 |
SUPERPAVE MIXTURES SP-D SAC-B PG64-22 | 3,617 | TON |
$78.00 |
$84.00 |
$80.00 |
$98.00 |
|
| 16 | 361-6072 |
FULL-DEPTH REPAIR CRCP (5"-9") | 1,155 | SY |
$230.00 |
$251.00 |
$250.00 |
$240.00 |
|
| 17 | 460-6001 |
CMP (GAL STL 12 IN) | 149 | LF |
$61.00 |
$35.00 |
$50.00 |
$52.00 |
|
| 18 | 460-6002 |
CMP (GAL STL 18 IN) | 129 | LF |
$76.48 |
$45.00 |
$65.00 |
$55.00 |
|
| 19 | 460-6003 |
CMP (GAL STL 24 IN) | 116 | LF |
$78.29 |
$60.00 |
$75.00 |
$60.00 |
|
| 20 | 464-6001 |
RC PIPE (CL III)(12 IN) | 186 | LF |
$66.70 |
$45.00 |
$45.00 |
$48.00 |
|
| 21 | 464-6002 |
RC PIPE (CL III)(15 IN) | 85 | LF |
$52.38 |
$60.00 |
$55.00 |
$54.00 |
|
| 22 | 464-6003 |
RC PIPE (CL III)(18 IN) | 887 | LF |
$51.97 |
$65.00 |
$60.00 |
$59.00 |
|
| 23 | 464-6004 |
RC PIPE (CL III)(21 IN) | 106 | LF |
$125.46 |
$70.00 |
$65.00 |
$63.25 |
|
| 24 | 464-6005 |
RC PIPE (CL III)(24 IN) | 54 | LF |
$66.77 |
$90.00 |
$70.00 |
$74.00 |
|
| 25 | 464-6012 |
RC PIPE (CL III)(60 IN) | 65 | LF |
$250.00 |
$400.00 |
$450.00 |
$345.00 |
|
| 26 | 467-6319 |
SET (TY II) (12 IN) (CMP) (6: 1) (P) | 8 | EA |
$990.97 |
$800.00 |
$650.00 |
$850.00 |
|
| 27 | 467-6326 |
SET (TY II) (12 IN) (RCP) (6: 1) (P) | 12 | EA |
$600.39 |
$800.00 |
$650.00 |
$830.00 |
|
| 28 | 467-6340 |
SET (TY II) (15 IN) (RCP) (6: 1) (C) | 2 | EA |
$450.00 |
$825.00 |
$750.00 |
$860.00 |
|
| 29 | 467-6348 |
SET (TY II) (18 IN) (CMP) (6: 1) (P) | 6 | EA |
$877.74 |
$850.00 |
$850.00 |
$955.00 |
|
| 30 | 467-6363 |
SET (TY II) (18 IN) (RCP) (6: 1) (P) | 34 | EA |
$851.25 |
$850.00 |
$850.00 |
$950.00 |
|
| 31 | 467-6374 |
SET (TY II) (21 IN) (RCP) (6: 1) (P) | 4 | EA |
$1,390.00 |
$900.00 |
$950.00 |
$1,150.00 |
|
| 32 | 467-6380 |
SET (TY II) (24 IN) (CMP) (6: 1) (P) | 8 | EA |
$1,208.00 |
$1,000.00 |
$1,000.00 |
$1,220.00 |
|
| 33 | 467-6395 |
SET (TY II) (24 IN) (RCP) (6: 1) (P) | 2 | EA |
$1,033.59 |
$1,000.00 |
$1,000.00 |
$1,300.00 |
|
| 34 | 467-6499 |
SET (TY II) (60 IN) (RCP) (6: 1) (P) | 2 | EA |
$8,500.00 |
$21,702.00 |
$17,500.00 |
$1,220.00 |
|
| 35 | 496-6050 |
REMOV STR (DRIVEWAY CULVERT) | 36 | EA |
$828.68 |
$250.00 |
$500.00 |
$230.00 |
|
| 36 | 500-6001 |
MOBILIZATION | 1 | LS |
$311,783.79 |
$225,000.00 |
$310,000.00 |
$320,000.00 |
|
| 37 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 6 | MO |
$20,000.00 |
$1,100.00 |
$16,500.00 |
$18,000.00 |
|
| 38 | 506-6002 |
ROCK FILTER DAMS (INSTALL) (TY 2) | 90 | LF |
$30.70 |
$24.50 |
$30.00 |
$22.00 |
|
| 39 | 506-6011 |
ROCK FILTER DAMS (REMOVE) | 90 | LF |
$9.59 |
$10.00 |
$10.00 |
$6.00 |
|
| 40 | 506-6020 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 156 | SY |
$22.35 |
$19.25 |
$25.00 |
$12.00 |
|
| 41 | 506-6024 |
CONSTRUCTION EXITS (REMOVE) | 156 | SY |
$8.24 |
$10.00 |
$7.00 |
$5.00 |
|
| 42 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 1,000 | LF |
$2.37 |
$1.65 |
$5.00 |
$2.25 |
|
| 43 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 1,000 | LF |
$0.7700 |
$0.5000 |
$0.5000 |
$0.6000 |
|
| 44 | 530-6001 |
INTERSECTIONS (CONC) | 391 | SY |
$91.28 |
$90.00 |
$125.00 |
$97.00 |
|
| 45 | 530-6002 |
INTERSECTIONS (ACP) | 550 | SY |
$39.09 |
$100.43 |
$30.00 |
$34.00 |
|
| 46 | 530-6005 |
DRIVEWAYS (ACP) | 6,690 | SY |
$39.86 |
$30.00 |
$30.00 |
$34.50 |
|
| 47 | 530-6017 |
DRIVEWAYS (CONC) (HES) | 1,902 | SY |
$110.03 |
$70.00 |
$100.00 |
$99.00 |
|
| 48 | 542-6002 |
REMOVE TERMINAL ANCHOR SECTION | 3 | EA |
$260.00 |
$400.00 |
$250.00 |
$170.00 |
|
| 49 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 4 | EA |
$2,506.00 |
$2,675.00 |
$2,500.00 |
$2,615.00 |
|
| 50 | 544-6003 |
GUARDRAIL END TREATMENT (REMOVE) | 1 | EA |
$424.32 |
$450.00 |
$300.00 |
$375.00 |
|
| 51 | 560-6001 |
MAILBOX INSTALL-S (TWG-POST) TY 1 | 3 | EA |
$272.00 |
$185.00 |
$300.00 |
$260.00 |
|
| 52 | 560-6002 |
MAILBOX INSTALL-D (TWG-POST) TY 1 | 1 | EA |
$230.00 |
$200.00 |
$300.00 |
$280.00 |
|
| 53 | 560-6003 |
MAILBOX INSTALL-M (TWG-POST) TY 1 | 2 | EA |
$335.66 |
$450.00 |
$300.00 |
$520.00 |
|
| 54 | 644-6068 |
RELOCATE SM RD SN SUP&AM TY 10BWG | 13 | EA |
$506.17 |
$300.00 |
$300.00 |
$450.00 |
|
| 55 | 644-6070 |
RELOCATE SM RD SN SUP&AM TY S80 | 1 | EA |
$614.62 |
$400.00 |
$475.00 |
$575.00 |
|
| 56 | 658-6016 |
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI) | 2 | EA |
$15.81 |
$27.00 |
$15.00 |
$21.00 |
|
| 57 | 658-6062 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 8 | EA |
$31.20 |
$29.00 |
$25.00 |
$38.00 |
|
| 58 | 662-6095 |
WK ZN PAV MRK REMOV (Y)4"(SLD) | 19,735 | LF |
$0.5900 |
$0.7500 |
$0.4000 |
$0.4600 |
|
| 59 | 662-6111 |
WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 986 | EA |
$1.32 |
$1.25 |
$1.00 |
$1.30 |
|
| 60 | 666-6048 |
REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 24 | LF |
$5.98 |
$8.00 |
$7.00 |
$6.33 |
|
| 61 | 666-6303 |
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) | 19,735 | LF |
$0.4700 |
$0.3300 |
$0.4000 |
$0.4600 |
|
| 62 | 666-6315 |
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) | 19,735 | LF |
$0.4700 |
$0.3300 |
$0.4000 |
$0.4600 |
|
| 63 | 672-6009 |
REFL PAV MRKR TY II-A-A | 494 | EA |
$2.63 |
$3.20 |
$4.00 |
$4.60 |
|
| 64 | 730-6002 |
FULL - WIDTH MOWING | 21 | AC |
$150.00 |
$1,000.00 |
$150.00 |
$350.00 |
|
| 65 | 3000-6001 |
CAM (ASPHALT) PG(70-22) | 77 | TON |
$123.71 |
$160.00 |
$135.00 |
$180.00 |
|
| 66 | 3000-6004 |
CAM (AGGREGATE) | 1,097 | TON |
$109.53 |
$160.00 |
$135.00 |
$180.00 |
|