| 1 | 100-6002 |
PREPARING ROW | 301 | STA |
$2,950.00 |
$300.00 |
$750.00 |
| 2 | 110-6001 |
EXCAVATION (ROADWAY) | 2,600 | CY |
$8.52 |
$11.00 |
$11.00 |
| 3 | 112-6001 |
SUBGRADE WIDENING (ORD COMP) | 301 | STA |
$162.28 |
$350.00 |
$180.00 |
| 4 | 132-6006 |
EMBANKMENT (FINAL)(DENS CONT)(TY C) | 4,449 | CY |
$9.91 |
$16.50 |
$8.00 |
| 5 | 134-6004 |
BACKFILL (TY A OR B) | 300.4 | STA |
$276.45 |
$90.00 |
$150.00 |
| 6 | 161-6017 |
COMPOST MANUF TOPSOIL (4") | 164,632 | SY |
$3.00 |
$0.6500 |
$0.7000 |
| 7 | 162-6002 |
BLOCK SODDING | 201 | SY |
$3.95 |
$5.20 |
$7.00 |
| 8 | 164-6035 |
DRILL SEEDING (PERM) (RURAL) (CLAY) | 164,632 | SY |
$0.1700 |
$0.0900 |
$0.1200 |
| 9 | 164-6051 |
DRILL SEED (TEMP)(WARM OR COOL) | 164,632 | SY |
$0.1500 |
$0.0500 |
$0.1200 |
| 10 | 168-6001 |
VEGETATIVE WATERING | 57,120 | MG |
$10.65 |
$0.0100 |
$1.00 |
| 11 | 247-6073 |
FL BS (CMP IN PLC)(TY D GR 1-2) (6") | 102,334 | SY |
$7.55 |
$6.75 |
$7.70 |
| 12 | 247-6133 |
FL BS (RDWY DEL) (TY D GR 1-2) | 11,370 | TON |
$27.59 |
$18.25 |
$26.00 |
| 13 | 251-6025 |
REWORK BS MTL (TY B) (6") (ORD COMP) | 102,334 | SY |
$1.40 |
$1.75 |
$2.50 |
| 14 | 260-6060 |
LIME (HYDRATED OR COMMERCIAL)(SLURRY) | 3,670 | TON |
$169.55 |
$125.00 |
$170.00 |
| 15 | 260-6073 |
LIME TRT (SUBGRADE)(8") | 122,355 | SY |
$5.16 |
$3.00 |
$3.20 |
| 16 | 275-6001 |
CEMENT | 599 | TON |
$132.08 |
$135.00 |
$120.00 |
| 17 | 275-6004 |
CEMENT TREAT (MX EXST MTL & NW BS) (6") | 102,334 | SY |
$2.19 |
$1.75 |
$1.50 |
| 18 | 305-6016 |
SALV, HAUL & STKPL RCL APH PV (3") | 45,760 | SY |
$4.13 |
$1.15 |
$1.70 |
| 19 | 305-6022 |
SALV, HAUL & STKPL RCL APH PV (4") | 82,587 | SY |
$2.14 |
$0.9500 |
$2.00 |
| 20 | 314-6021 |
EMULS ASPH (PRIME)(MS-2 OR SS-1) | 20,467 | GAL |
$3.39 |
$2.50 |
$2.80 |
| 21 | 316-6024 |
ASPH (CRS-2P) | 30,029 | GAL |
$3.08 |
$3.25 |
$3.00 |
| 22 | 316-6029 |
ASPH (RC-250) | 8,721 | GAL |
$2.11 |
$3.50 |
$3.00 |
| 23 | 316-6403 |
AGGR (TY-B GR-5 OR TY-L GR-5) | 250 | CY |
$128.07 |
$115.00 |
$60.00 |
| 24 | 316-6419 |
ASPH (AC-15P, AC-20-5TR OR AC-20XP) | 46,718 | GAL |
$2.86 |
$3.50 |
$3.00 |
| 25 | 316-6435 |
AGGR (TY-B GR-4 OR TY-L GR-4 SAC-B) | 274 | CY |
$136.90 |
$150.00 |
$100.00 |
| 26 | 316-6440 |
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B) | 594 | CY |
$116.49 |
$120.00 |
$100.00 |
| 27 | 344-6104 |
SUPERPAVE MIXTURES SP-D SAC-B PG64-22 | 7,551 | TON |
$72.00 |
$70.00 |
$91.00 |
| 28 | 361-6072 |
FULL-DEPTH REPAIR CRCP (5"-9") | 3,060 | SY |
$233.82 |
$250.00 |
$240.00 |
| 29 | 400-6008 |
CUT & RESTORE ASPH PAVING | 13 | SY |
$67.96 |
$965.00 |
$220.00 |
| 30 | 402-6001 |
TRENCH EXCAVATION PROTECTION | 28 | LF |
$1.81 |
$32.00 |
$22.00 |
| 31 | 403-6001 |
TEMPORARY SPL SHORING | 3,990 | SF |
$16.36 |
$12.25 |
$38.00 |
| 32 | 432-6029 |
RIPRAP (STONE COMMON)(GROUT)(8 IN) | 230 | CY |
$181.34 |
$280.00 |
$100.00 |
| 33 | 460-6002 |
CMP (GAL STL 18 IN) | 744 | LF |
$55.82 |
$39.00 |
$54.00 |
| 34 | 460-6003 |
CMP (GAL STL 24 IN) | 195 | LF |
$61.99 |
$55.00 |
$96.00 |
| 35 | 462-6047 |
CONC BOX CULV (4 FT X 2 FT)(EXTEND) | 12 | LF |
$580.00 |
$680.00 |
$450.00 |
| 36 | 462-6051 |
CONC BOX CULV (5 FT X 3 FT)(EXTEND) | 138 | LF |
$585.25 |
$445.00 |
$520.00 |
| 37 | 462-6095 |
CONC BOX CULV (6 FT X 2 FT) (EXTEND) | 5 | LF |
$791.93 |
$1,090.00 |
$540.00 |
| 38 | 462-6100 |
CONC BOX CULV (9 FT X 4 FT)(EXTEND) | 21 | LF |
$800.00 |
$980.00 |
$1,000.00 |
| 39 | 462-6133 |
CONC BOX CULV (5 FT X 6.5 FT)(EXTEND) | 19 | LF |
$672.00 |
$1,990.00 |
$960.00 |
| 40 | 462-6158 |
CONC BOX CULV (9FT X 2FT)(EXTEND) | 6 | LF |
$850.00 |
$840.00 |
$900.00 |
| 41 | 464-6001 |
RC PIPE (CL III)(12 IN) | 198 | LF |
$56.00 |
$63.00 |
$50.00 |
| 42 | 464-6003 |
RC PIPE (CL III)(18 IN) | 215 | LF |
$48.95 |
$62.00 |
$60.00 |
| 43 | 464-6005 |
RC PIPE (CL III)(24 IN) | 20 | LF |
$63.37 |
$106.00 |
$120.00 |
| 44 | 464-6007 |
RC PIPE (CL III)(30 IN) | 12 | LF |
$83.15 |
$162.00 |
$160.00 |
| 45 | 466-6180 |
WINGWALL (PW - 1) (HW=5 FT) | 4 | EA |
$10,411.70 |
$9,000.00 |
$11,000.00 |
| 46 | 466-6182 |
WINGWALL (PW - 1) (HW=7 FT) | 2 | EA |
$12,919.55 |
$11,200.00 |
$16,000.00 |
| 47 | 466-6184 |
WINGWALL (PW - 1) (HW=9 FT) | 2 | EA |
$36,675.00 |
$15,900.00 |
$31,000.00 |
| 48 | 467-6144 |
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C) | 2 | EA |
$4,852.16 |
$8,200.00 |
$5,400.00 |
| 49 | 467-6175 |
SET (TY I)(S= 5 FT)(HW= 4 FT)(3:1) (C) | 2 | EA |
$8,866.66 |
$8,400.00 |
$6,000.00 |
| 50 | 467-6219 |
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C) | 2 | EA |
$5,285.72 |
$9,700.00 |
$7,800.00 |
| 51 | 467-6293 |
SET (TY I)(S= 9 FT)(HW= 3 FT)(4:1) (C) | 1 | EA |
$3,000.00 |
$10,600.00 |
$9,000.00 |
| 52 | 467-6299 |
SET (TY I)(S= 9 FT)(HW= 5 FT)(3:1) (C) | 2 | EA |
$1,000.00 |
$9,500.00 |
$10,000.00 |
| 53 | 467-6317 |
SET (TY II) (12 IN) (CMP) (4: 1) (P) | 2 | EA |
$1,000.00 |
$1,100.00 |
$780.00 |
| 54 | 467-6324 |
SET (TY II) (12 IN) (RCP) (4: 1) (P) | 26 | EA |
$1,000.00 |
$875.00 |
$780.00 |
| 55 | 467-6346 |
SET (TY II) (18 IN) (CMP) (4: 1) (P) | 40 | EA |
$1,000.00 |
$995.00 |
$850.00 |
| 56 | 467-6359 |
SET (TY II) (18 IN) (RCP) (4: 1) (P) | 30 | EA |
$991.00 |
$925.00 |
$850.00 |
| 57 | 467-6378 |
SET (TY II) (24 IN) (CMP) (4: 1) (P) | 10 | EA |
$1,000.00 |
$1,125.00 |
$960.00 |
| 58 | 467-6390 |
SET (TY II) (24 IN) (RCP) (4: 1) (C) | 4 | EA |
$1,582.94 |
$1,075.00 |
$960.00 |
| 59 | 467-6441 |
SET (TY II) (36 IN) (CMP) (4: 1) (C) | 2 | EA |
$2,331.00 |
$1,750.00 |
$3,600.00 |
| 60 | 480-6001 |
CLEAN EXIST CULVERTS | 14 | EA |
$2,079.31 |
$2,100.00 |
$1,800.00 |
| 61 | 496-6004 |
REMOV STR (SET) | 8 | EA |
$578.46 |
$710.00 |
$600.00 |
| 62 | 496-6005 |
REMOV STR (WINGWALL) | 10 | EA |
$1,582.14 |
$710.00 |
$1,200.00 |
| 63 | 496-6008 |
REMOV STR (BOX CULVERT) | 28 | LF |
$55.62 |
$119.00 |
$110.00 |
| 64 | 496-6050 |
REMOV STR (DRIVEWAY CULVERT) | 58 | EA |
$435.47 |
$590.00 |
$850.00 |
| 65 | 496-6100 |
REMOVE STR (GABION) | 146 | LF |
$50.00 |
$25.00 |
$110.00 |
| 66 | 500-6001 |
MOBILIZATION | 1 | LS |
$812,685.49 |
$650,000.00 |
$600,000.00 |
| 67 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 15 | MO |
$10,000.00 |
$10,000.00 |
$12,000.00 |
| 68 | 506-6002 |
ROCK FILTER DAMS (INSTALL) (TY 2) | 3,600 | LF |
$27.19 |
$25.75 |
$31.00 |
| 69 | 506-6011 |
ROCK FILTER DAMS (REMOVE) | 3,600 | LF |
$8.27 |
$8.00 |
$4.00 |
| 70 | 506-6020 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 312 | SY |
$18.61 |
$15.00 |
$15.00 |
| 71 | 506-6024 |
CONSTRUCTION EXITS (REMOVE) | 312 | SY |
$7.22 |
$5.00 |
$2.00 |
| 72 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 11,490 | LF |
$2.04 |
$2.75 |
$3.00 |
| 73 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 11,490 | LF |
$0.6100 |
$0.4500 |
$1.00 |
| 74 | 506-6041 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 100 | LF |
$1.00 |
$5.00 |
$10.00 |
| 75 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 100 | LF |
$1.00 |
$0.7500 |
$3.00 |
| 76 | 530-6005 |
DRIVEWAYS (ACP) | 525 | SY |
$37.27 |
$40.00 |
$36.00 |
| 77 | 530-6006 |
DRIVEWAYS (SURF TREAT) | 4,273 | SY |
$14.62 |
$25.00 |
$18.00 |
| 78 | 540-6002 |
MTL W-BEAM GD FEN (STEEL POST) | 300 | LF |
$19.65 |
$25.00 |
$25.00 |
| 79 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 22 | EA |
$2,158.00 |
$2,550.00 |
$2,600.00 |
| 80 | 560-6011 |
MAILBOX INSTALL-S (TWW-POST) TY 4 | 22 | EA |
$224.90 |
$230.00 |
$250.00 |
| 81 | 560-6012 |
MAILBOX INSTALL-D (TWW-POST) TY 4 | 3 | EA |
$255.33 |
$235.00 |
$320.00 |
| 82 | 560-6013 |
MAILBOX INSTALL-M (TWW-POST) TY 4 | 1 | EA |
$539.50 |
$520.00 |
$680.00 |
| 83 | 644-6001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 5 | EA |
$466.33 |
$465.00 |
$560.00 |
| 84 | 644-6036 |
IN SM RD SN SUP&AM TYS80(1)SA(U-BM) | 1 | EA |
$612.81 |
$825.00 |
$940.00 |
| 85 | 644-6068 |
RELOCATE SM RD SN SUP&AM TY 10BWG | 21 | EA |
$411.49 |
$360.00 |
$450.00 |
| 86 | 644-6070 |
RELOCATE SM RD SN SUP&AM TY S80 | 5 | EA |
$413.46 |
$465.00 |
$530.00 |
| 87 | 658-6048 |
INSTL OM ASSM (OM-2Z)(FLX)GND | 30 | EA |
$54.54 |
$46.00 |
$50.00 |
| 88 | 662-6001 |
WK ZN PAV MRK NON-REMOV (W)4"(BRK) | 3,148 | LF |
$0.6300 |
$0.5200 |
$0.5200 |
| 89 | 662-6016 |
WK ZN PAV MRK NON-REMOV (W)24"(SLD) | 36 | LF |
$3.27 |
$5.21 |
$5.00 |
| 90 | 662-6032 |
WK ZN PAV MRK NON-REMOV (Y)4"(BRK) | 9,792 | LF |
$0.2600 |
$0.4200 |
$0.4200 |
| 91 | 662-6034 |
WK ZN PAV MRK NON-REMOV (Y)4"(SLD) | 33,910 | LF |
$0.3000 |
$0.4200 |
$0.4200 |
| 92 | 662-6109 |
WK ZN PAV MRK SHT TERM (TAB)TY W | 945 | EA |
$0.8300 |
$1.15 |
$1.00 |
| 93 | 662-6110 |
WK ZN PAV MRK SHT TERM (TAB)TY Y | 4,701 | EA |
$0.8400 |
$1.15 |
$0.6000 |
| 94 | 666-6048 |
REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 36 | LF |
$5.99 |
$5.73 |
$6.00 |
| 95 | 666-6093 |
REFL PAV MRK TY I (W)(RR XING)(100MIL) | 2 | EA |
$618.00 |
$570.00 |
$600.00 |
| 96 | 666-6300 |
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) | 3,148 | LF |
$0.3600 |
$0.5200 |
$0.5500 |
| 97 | 666-6303 |
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) | 72,259 | LF |
$0.3500 |
$0.4800 |
$0.5100 |
| 98 | 666-6309 |
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) | 282 | LF |
$0.4000 |
$2.08 |
$2.20 |
| 99 | 666-6312 |
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) | 8,418 | LF |
$0.4100 |
$0.5200 |
$0.5500 |
| 100 | 666-6315 |
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) | 68,363 | LF |
$0.3500 |
$0.4800 |
$0.5100 |
| 101 | 672-6007 |
REFL PAV MRKR TY I-C | 371 | EA |
$3.69 |
$3.40 |
$3.60 |
| 102 | 672-6009 |
REFL PAV MRKR TY II-A-A | 820 | EA |
$3.54 |
$3.40 |
$3.60 |
| 103 | 730-6002 |
FULL - WIDTH MOWING | 34 | AC |
$82.10 |
$150.00 |
$130.00 |
| 104 | 6185-6002 |
TMA (STATIONARY) | 160 | DAY |
$250.00 |
$200.00 |
$280.00 |
| 105 | 6185-6003 |
TMA (MOBILE OPERATION) | 96 | HR |
$150.00 |
$50.00 |
$50.00 |