| Let date | CCSJ | County / District | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Nov 3, 2026 estimated | 0257-02-042 | EastlandBrownwood | US 183 | Seal Coat STEPHENS C/L to 0.21 Mi S of SH 112 | $280,072 | Planned | ||
| Nov 3, 2026 estimated | 0257-08-009 | EastlandBrownwood | SL 389 | Seal Coat FM 2526 to SH 6 | $66,119 | Planned | ||
| Nov 3, 2026 estimated | 0262-01-034 | MilamBryan | FM 485 | Safety Improvement Projects Hazard Elimination & Safety 1.99 Mi W of FM 979 to 1.86 Mi E of FM 979 | $4,759,518 | Planned | BIG CREEK CONSTRUCTION, LTD. $9,787,627 · +105.6% | |
| Nov 3, 2026 estimated | 0262-02-031 | MilamBryan | FM 485 | Intersection & Operational Imprv Hazard Elimination & Safety CR 264 to 1.21 Mi W of Robertson County Line | $5,786,613 | Planned | ||
| Nov 3, 2026 estimated | 0269-02-069 | LavacaYoakum | US 77 | Seal Coat FAYETTE C/L to HALLETTSVILLE C-L | $708,197 | Planned | ||
| Nov 3, 2026 estimated | 0269-09-020 | De WittYoakum | BU 77Q | Seal Coat SH 111 to US 77A | $104,921 | Planned | ||
| Nov 3, 2026 estimated | 0269-10-027 | LavacaYoakum | FM 531 | Seal Coat 3.0 Mi South of US 90A to US 77 | $439,574 | Planned | ||
| Nov 3, 2026 estimated | 0271-06-141 | HarrisHouston | IH 10 | Landscape & Scenic Enhancement Landscape Development SH 99(W) to SH 6 | $867,233 | Planned | YELLOWSTONE LANDSCAPE - CENTRAL, INC. $1,151,035 · +32.7% | |
| Nov 3, 2026 estimated | 0271-07-359 | HarrisHouston | IH 10 | Landscape & Scenic Enhancement Landscape Development SH 6 to SL 8(W) | $746,401 | Planned | ||
| Nov 3, 2026 estimated | 0272-05-037 | LampasasBrownwood | US 190 | Seal Coat SAN SABA C/L to US 183 | $203,367 | Planned | ||
| Nov 3, 2026 estimated | 0274-01-043 | MillsBrownwood | US 183 | Seal Coat US 84, SOUTH to 0.7 MI S OF SH16 | $179,473 | Planned | ||
| Nov 3, 2026 estimated | 0275-01-263 | PotterAmarillo | IH 40 | Seal Coat WASHINGTON STREET (FRT RDS) to S JOHNSON STREET (FRT RDS) | $182,730 | Planned | ||
| Nov 3, 2026 estimated | 0285-03-066 | HaysAustin | RM 12 | Pedestrian, Sidewalks & Curb Ramps Construct Pedestrian Infrastructure Old Kyle Road to FM 3237 | $939,603 | Planned | LONE STAR SITEWORK, LLC $950,337 · +1.1% | |
| Nov 3, 2026 estimated | 0288-01-043 | ComancheBrownwood | SH 16 | Seal Coat SH 6 to S.C.L. OF DELEON | $150,498 | Planned | ||
| Nov 3, 2026 estimated | 0302-01-025 | ParmerLubbock | SH 86 | Seal Coat US 60 to SH 214 | $778,332 | Planned | ||
| Nov 3, 2026 estimated | 0302-05-002 | CastroLubbock | FM 3215 | Seal Coat SH 86 to US 385 | $88,555 | Planned | ||
| Nov 3, 2026 estimated | 0304-02-042 | SabineLufkin | SH 87 | Seal Coat Resurface Roadway Shelby County Line to SH 21 | $832,514 | Planned | ||
| Nov 3, 2026 estimated | 0310-04-028 | GrayAmarillo | SH 273 | Seal Coat US 60 to SL 171 | $207,442 | Planned | ||
| Nov 3, 2026 estimated | 0315-09-013 | AustinYoakum | FM 2502 | Seal Coat FM 109 to SH 159 | $214,641 | Planned | ||
| Nov 3, 2026 estimated | 0319-01-073 | TrinityLufkin | SH 94 | Seal Coat Resurface Roadway SH 19 to 0.16 mi W of US 287 | $997,300 | Planned | ||
| Nov 3, 2026 estimated | 0334-08-039 | FayetteYoakum | FM 154 | Seal Coat SL 543 to 2.70 Mi North of FM 2237(BUCKNERS CREEK) | $265,063 | Planned | ||
| Nov 3, 2026 estimated | 0336-01-071 | HoustonLufkin | SH 7 | Seal Coat Resurface Roadway 1.64 mi E of Airport to 0.21 mi E of FM 232 | $343,998 | Planned | ||
| Nov 3, 2026 estimated | 0336-05-067 | AngelinaLufkin | SH 103 | Seal Coat Resurface Roadway Paul Avenue to FM 326 | $457,415 | Planned | ||
| Nov 3, 2026 estimated | 0336-07-078 | San AugustineLufkin | SH 103 | Seal Coat Resurface Roadway 0.36 mi E of SH 147 to FM 1751 | $303,229 | Planned | ||
| Nov 3, 2026 estimated | 0346-01-042 | JacksonYoakum | SH 111 | Seal Coat HOUSTON ST. to 300 FT WEST OF FM 3131 | $104,193 | Planned | ||
| Nov 3, 2026 estimated | 0353-01-031 | WiseFort Worth | SH 114 | Intersection & Operational Imprv Widen Road - Add Lanes And Shoulders At Alliance Blvd to . | $620,363 | Planned | XIT PAVING AND CONSTRUCTION INC. $482,224 · -22.3% | |
| Nov 3, 2026 estimated | 0355-05-048 | HansfordAmarillo | SH 15 | Seal Coat FM 759 ( SPEARMAN) to OCHILTREE COUNTY LINE | $818,721 | Planned | ||
| Nov 3, 2026 estimated | 0356-02-050 | CarsonAmarillo | SH 207 | Seal Coat FM 293 to .2 MILES NORTH OF US 60 | $142,427 | Planned | ||
| Nov 3, 2026 estimated | 0356-03-020 | CarsonAmarillo | SH 207 | Seal Coat US 60 to IH-40 SOUTH FRONTAGE ROAD | $744,088 | Planned | ||
| Nov 3, 2026 estimated | 0357-05-027 | ArmstrongAmarillo | SH 207 | Seal Coat FM 2272 to BRISCOE COUNTY LINE | $1,112,885 | Planned | ||
| Nov 3, 2026 estimated | 0366-01-080 | HaysAustin | SH 123 | Overlay FDR, EDGE MILL, UNDERSEAL AND TOM OVERLAY FR IH 35 NBFR to 0.12 MI. NORTH OF DE ZAVALA DRIVE | $348,684 | Planned | ||
| Nov 3, 2026 estimated | 0366-01-089 | HaysAustin | SL 82 | Overlay FDR, EDGE MILL, UNDERSEAL AND TOM OVERLAY FR SH 80 to Martin Luther King Dr | $202,538 | Planned | ||
| Nov 3, 2026 estimated | 0380-01-096 | LubbockLubbock | US 62 | Seal Coat Hockley County Line to LP 193 | $498,881 | Planned | ||
| Nov 3, 2026 estimated | 0380-01-097 | LubbockLubbock | US 62 | Seal Coat W LP 289 Westbound Service Road (Target) to W LP 289 Westbound Service Road | $39,938 | Planned | ||
| Nov 3, 2026 estimated | 0380-02-028 | HockleyLubbock | US 62 | Seal Coat Terry County Line to Lubbock County Line | $1,143,488 | Planned | ||
| Nov 3, 2026 estimated | 0388-06-006 | PolkLufkin | SH 146 | Seal Coat Resurface Roadway BU 59-K to FM 1316 | $49,166 | Planned | ||
| Nov 3, 2026 estimated | 0399-03-043 | DeltaParis | FM 64 | Seal Coat Preventive Maintenance FM 1532 to SH 24 | $295,239 | Planned | ||
| Nov 3, 2026 estimated | 0404-01-033 | ThrockmortonWichita Falls | US 183 | Seal Coat US 283 to Stephens County Line | $787,236 | Planned | ||
| Nov 3, 2026 estimated | 0420-09-027 | JacksonYoakum | FM 710 | Seal Coat END OF STATE MAINTENANCE @ WHARTON C/L to CR 260 (GALLOW RD) | $193,340 | Planned | ||
| Nov 3, 2026 estimated | 0420-10-020 | WhartonYoakum | FM 1300 | Seal Coat JACKSON C/L to FM 1160 | $429,632 | Planned | ||
| Nov 3, 2026 estimated | 0423-02-026 | MontagueWichita Falls | FM 677 | Seal Coat Near FS 677 to FM 1956 | $283,498 | Planned | ||
| Nov 3, 2026 estimated | 0435-01-086 | LamarParis | FM 38 | Seal Coat Preventive Maintenance FM 2352 to US 82 | $587,101 | Planned | ||
| Nov 3, 2026 estimated | 0441-07-079 | PecosOdessa | IH 10 | Bridge Maintenance AT 6.8 MI W OF US 67 to . | $717,837 | Planned | ||
| Nov 3, 2026 estimated | 0445-01-068 | GonzalesYoakum | SS 146 | Seal Coat US 183 to US 90A | $94,805 | Planned | ||
| Nov 3, 2026 estimated | 0445-03-029 | GonzalesYoakum | UA 90 | Seal Coat US 183 to SS 146 | $310,882 | Planned | ||
| Nov 3, 2026 estimated | 0452-03-036 | ColemanBrownwood | SH 206 | Seal Coat FM 2707 to PECAN BAYOU | $486,303 | Planned | ||
| Nov 3, 2026 estimated | 0453-10-020 | GarzaLubbock | FM 1313 | Seal Coat Lynn County Line to FM 669 | $344,766 | Planned | ||
| Nov 3, 2026 estimated | 0453-11-008 | LynnLubbock | FM 1313 | Seal Coat FM 212 to Garza County Line | $85,345 | Planned | ||
| Nov 3, 2026 estimated | 0475-09-041 | TrinityLufkin | FM 356 | Seal Coat Resurface Roadway White Rock Creek to Polk County Line | $441,033 | Planned | ||
| Nov 3, 2026 estimated | 0480-04-032 | BrownBrownwood | SH 279 | Seal Coat PECAN BAYOU to FM 1850 | $700,292 | Planned | ||
| Nov 3, 2026 estimated | 0500-01-158 | GalvestonHouston | IH 45 | Traffic Control Devices Install Illumination At Causeway Bridge to . | $510,426 | Planned | DECO CONTRACTORS, INC. $607,082 · +18.9% | |
| Nov 3, 2026 estimated | 0506-01-128 | BrazosBryan | FM 60 | Pedestrian, Sidewalks & Curb Ramps Donation First Street to Church Street | $211,759 | Planned | ||
| Nov 3, 2026 estimated | 0515-02-006 | VictoriaYoakum | FM 1090 | Seal Coat US 87 to CALHOUN C/L | $250,422 | Planned | ||
| Nov 3, 2026 estimated | 0515-03-061 | CalhounYoakum | FM 1090 | Seal Coat VICTORIA C/L to FM 3084 | $119,072 | Planned | ||
| Nov 3, 2026 estimated | 0529-02-016 | YoungWichita Falls | FM 2179 | Seal Coat 4th St (Graham) to End of Pavement | $221,305 | Planned | ||
| Nov 3, 2026 estimated | 0550-01-031 | EastlandBrownwood | FM 8 | Seal Coat SH 6, EAST to ERATH C/L | $347,553 | Planned | ||
| Nov 3, 2026 estimated | 0553-02-019 | AngelinaLufkin | SH 7 | Seal Coat Resurface Roadway US 69 to Nacogdoches County Line | $193,051 | Planned | ||
| Nov 3, 2026 estimated | 0553-03-038 | NacogdochesLufkin | SH 7 | Seal Coat Resurface Roadway FM 2782 to SL 224 | $522,042 | Planned | ||
| Nov 3, 2026 estimated | 0560-01-034 | GrayAmarillo | SH 273 | Seal Coat SL 171 "Y" IN PAMPA to 0.716 MILES EAST OF FM 1321 | $936,330 | Planned | ||
| Nov 3, 2026 estimated | 0560-05-008 | GrayAmarillo | SS 398 | Seal Coat SH 273 (NORTH OF LEFORS) to SH 273 (SOUTH OF LEFORS) | $92,021 | Planned | ||
| Nov 3, 2026 estimated | 0562-03-013 | BaylorWichita Falls | FM 1790 | Seal Coat FM 422 to SH 114 | $261,752 | Planned | ||
| Nov 3, 2026 estimated | 0565-03-003 | HaleLubbock | FM 1071 | Seal Coat FM 179 to FM 1424 | $274,706 | Planned | ||
| Nov 3, 2026 estimated | 0580-02-014 | CalhounYoakum | FM 2433 | Seal Coat FM 1679 to SH 238 | $148,543 | Planned | ||
| Nov 3, 2026 estimated | 0583-02-013 | GainesLubbock | SH 83 | Seal Coat SH 214 to US 62 | $1,061,120 | Planned | ||
| Nov 3, 2026 estimated | 0583-03-018 | GainesLubbock | SH 83 | Seal Coat US 62 to 1200' East of FM 1429 | $34,424 | Planned | ||
| Nov 3, 2026 estimated | 0610-01-053 | HopkinsParis | IH 30 | Seal Coat Preventive Maintenance 3.1 Mi E of FM 69 to US 67 | $80,661 | Planned | ||
| Nov 3, 2026 estimated | 0616-01-020 | San PatricioCorpus Christi | PR 25A | Texas Park and Wildlife State Park Improvements At Lake Corpus Christi to State Park | $366,718 | Planned | LCR TOTAL TRANSPORT LLC $470,959 · +28.4% | |
| Nov 3, 2026 estimated | 0616-01-021 | San PatricioCorpus Christi | PR 25B | Texas Park and Wildlife State Park Improvements At Lake Corpus Christi to State Park | $122,538 | Planned | ||
| Nov 3, 2026 estimated | 0619-03-068 | CollinDallas | FM 544 | Traffic Control Devices Traffic Signal Improvements McCreary Road to SH 78 | $1,313,710 | Planned | RCR TELECON LLC $1,528,909 · +16.4% | |
| Nov 3, 2026 estimated | 0619-03-069 | CollinDallas | FM 544 | Traffic Control Devices Traffic Signal Improvements McCreary Rd to SH 78 | $421,425 | Planned | ||
| Nov 3, 2026 estimated | 0642-03-028 | HuntParis | FM 36 | Seal Coat Preventive Maintenance SH 66 to IH 30 | $165,423 | Planned | ||
| Nov 3, 2026 estimated | 0645-01-017 | LubbockLubbock | FM 41 | Seal Coat Hockley County Line to US 87 | $640,578 | Planned | ||
| Nov 3, 2026 estimated | 0645-02-016 | LubbockLubbock | FM 41 | Seal Coat US 87 to Slaton City Limits | $431,590 | Planned | ||
| Nov 3, 2026 estimated | 0681-05-019 | ClayWichita Falls | FM 2332 | Seal Coat SH 148 to 98TH Meridian Rd | $645,599 | Planned | ||
| Nov 3, 2026 estimated | 0681-06-015 | ClayWichita Falls | FM 2332 | Seal Coat 98TH Meridian Rd to US 82 | $600,012 | Planned | ||
| Nov 3, 2026 estimated | 0688-02-065 | LamarParis | FM 79 | Seal Coat Preventive Maintenance Fannin County Line to FM 1500 | $869,736 | Planned | ||
| Nov 3, 2026 estimated | 0706-04-022 | NacogdochesLufkin | FM 95 | Seal Coat Resurface Roadway SH 7 to SH 21 | $609,139 | Planned | ||
| Nov 3, 2026 estimated | 0708-01-033 | EastlandBrownwood | FM 101 | Seal Coat RANGER W.C.L. to LP 254 | $71,645 | Planned | ||
| Nov 3, 2026 estimated | 0714-01-016 | Palo PintoFort Worth | PR 33 | Seal Coat Stephens C/L to End of PR 33 | $74,984 | Planned | ||
| Nov 3, 2026 estimated | 0714-02-020 | StephensBrownwood | PR 33 | Seal Coat FM 3253 to US 180 | $260,715 | Planned | ||
| Nov 3, 2026 estimated | 0714-02-022 | StephensBrownwood | PR 33 | Seal Coat PALO PINTO C/L to FM 3253 | $180,833 | Planned | ||
| Nov 3, 2026 estimated | 0714-04-014 | EastlandBrownwood | FM 717 | Seal Coat STEPHENS C/L to FM 101 | $125,595 | Planned | ||
| Nov 3, 2026 estimated | 0716-01-049 | AustinYoakum | FM 109 | Seal Coat WASHINGTON C/L to FM 1094 | $634,248 | Planned | ||
| Nov 3, 2026 estimated | 0721-01-024 | HockleyLubbock | FM 300 | Seal Coat FM 303 South to US 385 | $347,208 | Planned | ||
| Nov 3, 2026 estimated | 0721-01-025 | HockleyLubbock | FM 303 | Seal Coat North Sundown City Limits to South Sundown City Limits | $164,664 | Planned | ||
| Nov 3, 2026 estimated | 0721-05-018 | LynnLubbock | FM 211 | Seal Coat US 87 to FM 400 | $280,079 | Planned | ||
| Nov 3, 2026 estimated | 0722-02-052 | Red RiverParis | SH 37 | Seal Coat Preventive Maintenance US 82 to FM 411 | $722,419 | Planned | ||
| Nov 3, 2026 estimated | 0727-04-021 | MooreAmarillo | FM 722 | Seal Coat HARTLEY COUNTY LINE to US 87 IN DUMAS | $901,419 | Planned | ||
| Nov 3, 2026 estimated | 0730-01-013 | Red RiverParis | FM 195 | Seal Coat Preventive Maintenance Lamar County Line to FM 410 S | $113,806 | Planned | ||
| Nov 3, 2026 estimated | 0730-04-020 | Red RiverParis | FM 195 | Seal Coat Preventive Maintenance FM 410 N to FM 410 | $708,206 | Planned | ||
| Nov 3, 2026 estimated | 0735-01-021 | DeltaParis | FM 128 | Seal Coat Preventive Maintenance FM 64 to FM 1533 | $439,636 | Planned | ||
| Nov 3, 2026 estimated | 0754-04-013 | CastroLubbock | FM 145 | Seal Coat US 385 to FM 168 | $476,915 | Planned | ||
| Nov 3, 2026 estimated | 0754-05-015 | SwisherLubbock | FM 145 | Seal Coat Castro County Line to US 87 | $677,032 | Planned | ||
| Nov 3, 2026 estimated | 0765-03-029 | FanninParis | FM 273 | Seal Coat Preventive Maintenance FM 2029 to FM 100 | $392,147 | Planned | ||
| Nov 3, 2026 estimated | 0772-03-023 | Red RiverParis | SH 37 | Seal Coat Preventive Maintenance FM 411 to FM 909 | $341,783 | Planned | ||
| Nov 3, 2026 estimated | 0791-05-022 | HansfordAmarillo | SH 136 | Seal Coat SH 15 to HUTCHINSON COUNTY LINE | $1,087,172 | Planned | ||
| Nov 3, 2026 estimated | 0794-06-023 | HutchinsonAmarillo | FM 281 | Seal Coat MOORE COUNTY LINE to SH 207 | $898,794 | Planned | ||
| Nov 3, 2026 estimated | 0800-02-010 | FloydLubbock | FM 378 | Seal Coat FM 54 to Crosby County Line | $126,524 | Planned | ||
| Nov 3, 2026 estimated | 0800-03-019 | CrosbyLubbock | FM 378 | Seal Coat Floyd County Line to US 62 | $509,306 | Planned | ||
| Nov 3, 2026 estimated | 0804-01-020 | WichitaWichita Falls | FM 368 | Seal Coat FM 367 to Archer CL | $249,504 | Planned |
Advertised proposals and bid items: TxDOT Official and Unofficial Bid Items (data.texas.gov). Planned projects: TxDOT Projects Info service; their let dates are TxDOT estimates and often slip. Low bidders: TxDOT Bid Tabulations. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.