| 1 | 161-7008 |
EROSION CONTROL COMPOST (VEH) | 2,545.25 | CY |
$28.63 |
$52.39 |
$25.00 |
$24.00 |
$25.00 |
$21.00 |
| 2 | 161-7010 |
GENERAL USE COMPOST (VEH) | 1,267.25 | CY |
$25.42 |
$49.98 |
$24.00 |
$27.00 |
$20.00 |
$23.00 |
| 3 | 162-7002 |
BLOCK SODDING | 2,295 | SY |
$4.35 |
$5.08 |
$2.00 |
$4.70 |
$5.00 |
$5.00 |
| 4 | 168-7001 |
VEGETATIVE WATERING | 56.91 | TGL |
$19.50 |
$38.07 |
$1.00 |
$60.00 |
$40.00 |
$18.00 |
| 5 | 170-7002 |
IRRIGATION SYSTEM (TY I) | 0.37 | EA |
$55,000.00 |
$20,000.00 |
$130,500.00 |
$40,000.00 |
$35,000.00 |
$382,313.72 |
| 6 | 170-7003 |
IRRIGATION SYSTEM (TY II) | 0.37 | EA |
$105,000.00 |
$31,666.67 |
$77,500.00 |
$60,000.00 |
$200,000.00 |
$300,000.00 |
| 7 | 192-7001 |
MULCH | 1,267.25 | CY |
$25.42 |
$21.04 |
$24.00 |
$42.00 |
$20.00 |
$16.00 |
| 8 | 192-7008 |
SOIL AMEND (TY I) | 22,956 | SY |
$0.8000 |
$0.3050 |
$0.4000 |
$0.3000 |
$0.4000 |
$0.6500 |
| 9 | 192-7011 |
PLANT BED PREP (TY II) | 22,956 | SY |
$2.42 |
$0.3630 |
$1.50 |
$1.00 |
$4.00 |
$1.50 |
| 10 | 192-7028 |
PLANT MATERIAL (3 GAL) | 8,494 | EA |
$24.15 |
$16.94 |
$17.45 |
$19.75 |
$20.00 |
$13.00 |
| 11 | 192-7039 |
PLANT MATERIAL (30 GAL) (TREE) | 218 | EA |
$264.50 |
$285.40 |
$265.00 |
$330.00 |
$250.00 |
$275.00 |
| 12 | 192-7084 |
SOIL AMEND (TY II) | 22,956 | SY |
$0.4000 |
$0.1000 |
$0.4000 |
$0.3000 |
$1.00 |
$0.7500 |
| 13 | 193-7002 |
LANDSCAPE ESTABLISH | 2 | CYC |
$19,833.00 |
$4,958.10 |
$34,000.00 |
$37,000.00 |
$18,000.00 |
$15,000.00 |
| 14 | 193-7010 |
IRRIG SYS OPER AND MAINT (SCH A) | 19 | MO |
$2,750.00 |
$850.88 |
$2,500.00 |
$2,000.00 |
$1,650.00 |
$7,000.00 |
| 15 | 193-7011 |
IRRIG SYS OPER AND MAINT (SCH B) | 12 | MO |
$2,750.00 |
$2,083.33 |
$3,000.00 |
$1,100.00 |
$1,650.00 |
$7,000.00 |
| 16 | 193-7023 |
LANDSCAPE TREAT (TY I) | 218 | EA |
$2.53 |
$1.10 |
$1.00 |
$1.00 |
$0.7500 |
$1.00 |
| 17 | 193-7024 |
LANDSCAPE TREAT (TY II) | 654 | EA |
$1.39 |
$0.3480 |
$1.00 |
$0.7500 |
$0.7500 |
$1.00 |
| 18 | 193-7028 |
LANDSCAPE TREAT (TY III) | 8,712 | EA |
$1.91 |
$2.71 |
$1.00 |
$0.4000 |
$3.00 |
$1.00 |
| 19 | 193-7036 |
LANDSCAPE TREAT (TY III) | 2 | CYC |
$9,666.00 |
$3,833.33 |
$10,000.00 |
$25,500.00 |
$16,000.00 |
$38,000.00 |
| 20 | 193-7037 |
LANDSCAPE TREAT (TY IV) | 2 | CYC |
$20,000.00 |
$2,916.67 |
$15,000.00 |
$6,500.00 |
$16,000.00 |
$68,000.00 |
| 21 | 432-7003 |
RIPRAP (CONC)(6 IN) | 37.43 | CY |
$668.00 |
$890.55 |
$750.00 |
$1,200.00 |
$600.00 |
$3,850.00 |
| 22 | 500-7001 |
MOBILIZATION | 1 | LS |
$153,884.04 |
$25,000.00 |
$147,500.00 |
$115,000.00 |
$185,000.00 |
$105,000.00 |
| 23 | 502-7001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 7 | MO |
$5,500.00 |
$336.60 |
$9,500.00 |
$5,700.00 |
$6,150.00 |
$5,000.00 |
| 24 | 505-7001 |
TMA (STATIONARY) | 120 | DAY |
$251.00 |
$16.67 |
$100.00 |
$480.00 |
$350.00 |
$50.00 |
| 25 | 505-7003 |
TMA (MOBILE OPERATION) | 145 | DAY |
$175.00 |
$43.68 |
$0.1000 |
$490.00 |
$450.00 |
$50.00 |
| 26 | 506-7043 |
BIODEG EROSN CONT LOGS (INSTL) (8") | 2,000 | LF |
$4.25 |
$2.50 |
$0.1000 |
$5.00 |
$4.00 |
$1.00 |
| 27 | 506-7046 |
BIODEG EROSN CONT LOGS (REMOVE) | 2,000 | LF |
$1.15 |
$0.3380 |
$0.1000 |
$1.00 |
$1.50 |
$0.5000 |
| 1 | 161-7008 |
EROSION CONTROL COMPOST (VEH) | 1,543.25 | CY |
$28.63 |
|
|
|
|
|
| 2 | 161-7010 |
GENERAL USE COMPOST (VEH) | 772 | CY |
$25.42 |
|
|
|
|
|
| 3 | 162-7002 |
BLOCK SODDING | 1,405 | SY |
$4.35 |
|
|
|
|
|
| 4 | 168-7001 |
VEGETATIVE WATERING | 34.83 | TGL |
$19.50 |
|
|
|
|
|
| 5 | 170-7002 |
IRRIGATION SYSTEM (TY I) | 0.37 | EA |
$55,000.00 |
|
|
|
|
|
| 6 | 170-7003 |
IRRIGATION SYSTEM (TY II) | 0.37 | EA |
$105,000.00 |
|
|
|
|
|
| 7 | 192-7001 |
MULCH | 772 | CY |
$25.42 |
|
|
|
|
|
| 8 | 192-7008 |
SOIL AMEND (TY I) | 14,050 | SY |
$0.8000 |
|
|
|
|
|
| 9 | 192-7011 |
PLANT BED PREP (TY II) | 14,050 | SY |
$2.42 |
|
|
|
|
|
| 10 | 192-7028 |
PLANT MATERIAL (3 GAL) | 13,859 | EA |
$24.15 |
|
|
|
|
|
| 11 | 192-7039 |
PLANT MATERIAL (30 GAL) (TREE) | 583 | EA |
$264.50 |
|
|
|
|
|
| 12 | 192-7084 |
SOIL AMEND (TY II) | 14,050 | SY |
$0.4000 |
|
|
|
|
|
| 16 | 193-7023 |
LANDSCAPE TREAT (TY I) | 583 | EA |
$2.53 |
|
|
|
|
|
| 17 | 193-7024 |
LANDSCAPE TREAT (TY II) | 1,749 | EA |
$1.39 |
|
|
|
|
|
| 18 | 193-7028 |
LANDSCAPE TREAT (TY III) | 14,442 | EA |
$1.91 |
|
|
|
|
|
| 21 | 432-7003 |
RIPRAP (CONC)(6 IN) | 28.67 | CY |
$668.00 |
|
|
|
|
|
| 26 | 506-7043 |
BIODEG EROSN CONT LOGS (INSTL) (8") | 1,218 | LF |
$4.25 |
|
|
|
|
|
| 27 | 506-7046 |
BIODEG EROSN CONT LOGS (REMOVE) | 1,218 | LF |
$1.15 |
|
|
|
|
|
| 1 | 161-7008 |
EROSION CONTROL COMPOST (VEH) | 56 | CY |
$28.63 |
|
|
|
|
|
| 2 | 161-7010 |
GENERAL USE COMPOST (VEH) | 28 | CY |
$25.42 |
|
|
|
|
|
| 3 | 162-7002 |
BLOCK SODDING | 50 | SY |
$4.35 |
|
|
|
|
|
| 4 | 168-7001 |
VEGETATIVE WATERING | 1.25 | TGL |
$19.50 |
|
|
|
|
|
| 5 | 170-7002 |
IRRIGATION SYSTEM (TY I) | 0.26 | EA |
$55,000.00 |
|
|
|
|
|
| 6 | 170-7003 |
IRRIGATION SYSTEM (TY II) | 0.26 | EA |
$105,000.00 |
|
|
|
|
|
| 7 | 192-7001 |
MULCH | 28 | CY |
$25.42 |
|
|
|
|
|
| 8 | 192-7008 |
SOIL AMEND (TY I) | 506 | SY |
$0.8000 |
|
|
|
|
|
| 9 | 192-7011 |
PLANT BED PREP (TY II) | 506 | SY |
$2.42 |
|
|
|
|
|
| 10 | 192-7028 |
PLANT MATERIAL (3 GAL) | 76 | EA |
$24.15 |
|
|
|
|
|
| 11 | 192-7039 |
PLANT MATERIAL (30 GAL) (TREE) | 110 | EA |
$264.50 |
|
|
|
|
|
| 12 | 192-7084 |
SOIL AMEND (TY II) | 506 | SY |
$0.4000 |
|
|
|
|
|
| 16 | 193-7023 |
LANDSCAPE TREAT (TY I) | 110 | EA |
$2.53 |
|
|
|
|
|
| 17 | 193-7024 |
LANDSCAPE TREAT (TY II) | 330 | EA |
$1.39 |
|
|
|
|
|
| 18 | 193-7028 |
LANDSCAPE TREAT (TY III) | 186 | EA |
$1.91 |
|
|
|
|
|
| 26 | 506-7043 |
BIODEG EROSN CONT LOGS (INSTL) (8") | 68 | LF |
$4.25 |
|
|
|
|
|
| 27 | 506-7046 |
BIODEG EROSN CONT LOGS (REMOVE) | 68 | LF |
$1.15 |
|
|
|
|
|